Post Job Free
Sign in

Electrical Operator

Location:
Rawdat Al Khail, Qatar
Salary:
6500
Posted:
August 24, 2019

Contact this candidate

Resume:

MICHAEL (Isa) TOMINES LUBO

MEP Co ordination /Draughtsman

Doha Qatar

CP#: +974-******** +974-****-****

E-mail: ac95vv@r.postjobfree.com

EMPLOYMENT RECORD

Nasser Al Jaber Contracting WLL

P.O.Box No.35293

Tel.+974-****-****

Email:ac95vv@r.postjobfree.com

Fire Protection & MEP Co-ordination Draftsman

April 28, 2019 to Present

Project:

Qatar Petroleum District- QPD (Fit Out Project)

(Under by TRAGS Engineering)

Job Description

- Responsible for the preparation of shop drawings of Fire Pro & MEP CSD Drawings including Plans. Section and Details

Jaidah Groups

Electrical /Telecom Department

Jaidah Square Showroom,Al Matar Street,Umm Ghuwallina,Doha Qatar Tel.+974-****-**** +974-****-****

Email:ac95vv@r.postjobfree.com

Cad Operator/Draughtsman

April 04, 2015 to March 27 2019

- Responsible for the preparation of shop drawings of ELV CCTV System, SMATV System, Acceess Control System

PA/BGM System, Telephone Data System, & BMS

Detail Drawing For Telecom Rooms

- In Building Solution (IBS) & Microwave

- Distributed Antenna System (DAS) Under By HUAWIE Bouygues Batiment International

Qatar Branch MEP Department

Al Gassar Tower,West Bay Area

P.O BOX 31423,DOHA QATAR

Electrical Cad /Draughtsman

January 17, 2012 to March 31, 2015

Project:

BARWA FINANCIAL DISTRICT

Doha,Qatar

Job Description

- Responsible for the preparation of shop drawings of Electrical Shop Drawings including Plans. Section and Details

- Electrical Room Details / Cable Containment & MV Room Setting Out Plan ROMAGO INCORPORATED

ELECTRICAL - MECHANICAL - ENGINEERS - CONTRACTORS

36 Cordillera St.Cor. Road 1 Mandaluyong City

Electrical Cad Draughtsman

Febfuary 28, 2011 to January 05, 2012

Project:

RCBC Saving Bank Corporate Project.(YGC)

Bonifacio Global City.Taguig City

Job Description

- Responsible for the preparation of shop drawings of Electrical Shop Drawings including Plans.

- Sections & Details.(Coordination Drawings)

Project:

Twin Oaks place.(Greenfield Development Corporation) Shaw Boulevard. Mandaluyong City

AL NABOODAH ENGINEERING.L.L.C

MEP DEVISION

P. O. Box 11193,Dubai,UAE

Sr, Draughtsman Co ordination

January 24, 2008 to June 16, 2010

Project:

Za-Abeel II Majlis For HH Sheikh Ahmed Bin Mohammed Al Maktoum. Dubai UAE

Job Description

- Responsible for the preparation of shop drawings of Heating, Ventilating and Air-conditioning including Plans,

- Sections & Details.(Co-ordination drawings)

Project:

Comprehensive Improvements of the Parallel Roads (R881-3B) Al Barsha Dubai UAE

Job Description

- Responsible for the preparation of shop drawings Drainage Pump Station and Fire Fighting

Project:

Housing Scheme for DPF & ARMY Officer at Al Quoz Fourth.Dubai UAE Job Description

- Responsible for the preparation of shop drawings of Heating, Ventilating and Air-conditioning, Fire Fighting, Plumbing, & Electrical Services including Plans,

- Sections & Details.(Coordination drawings)

E.R.E. CONTRACTING W.L.L.

Electrical Refrigeration Engineering

#15 Mukeinas St., Doha Qatar, P. O. Box 22509

MEP Co ordination /Draughtsman

May 10, 2006 to May 15, 2007

Job Description

- Responsible for the preparation of shop drawings of Heating, Ventilating and Air-conditioning, Fire Fighting, Plumbing & Electrical Services including Plans, Sections & Details.

Project:

Doha City Centre Expansion (Phase II (West)

NAFFCO, (National Fire Fighting Company)

P.O Box.17014 Dubai UAE

Cad Operator/Draughtsman

January 24, 2005 to October 15, 2005

Job Description

- Responsible for the preparation of shop drawings of Fire Fighting, Services including Plans, Sections & Details.

Project:

Al Fattan Marina Tower.Jamairah Dubai UAE.

MODAIR Manila Co.LTD.

5

nd

Floor, Emmanuel house.115 Aguirre St.

Legaspi Villages Makati City

Cad Operator/Draughtsman

March 30, 2004 to October 10, 2004

Job Description

- Responsible for the preparation of shop drawings and As-Built of Heating, Ventilating and Air-conditioning, Fire Fighting, Plumbing & Electrical Services including Plans, Sections & Details.

Project:

- CAVDEAL Office Building.

Edsa Extenssion Pasay City.

DSTI.Dou System Technology Inc.

105 Amang Rodriguez ave.Brgy Dela Paz Pasig City.

Cad Operator /Draftsman

May 03, 2001 to March 25, 2004

Job Description

- Responsible for the preparation of shop drawings of and As-built of Electrical Services including Plans, Sections & Details.

Project:

- IDS Logistic Central Distribution Center.

#65 Industrial St. Bagumbayan Quezon City.

- Globe Telecom Aurora MSC Building.

Aurora Blvd. Brgy Loyola Height Quezon City.

- Globe Telecom Caloocan MSC Building.

Brgy Canero Caloocan City.

- East Asia Crossing.

Brgy Sabang Naic Cavite

- Manila Bulletin (Renovation project)

Recoletos Corner Muralla St.Intramuros Manila City.

- GNF Philippines Inc.

Laguna Techno Part Santa Rosa Laguna City.

TRAINING.

- (DPWH) Pasac-Guagua San Fernando Waterways.

Brgy Sulipan Apalit Pampanga.

Manual Draftsman

July 03 to October 10 1998

OTHER SKILLS

- AutoCad Release 14, 2000, 2005 to 2014

- MS-Excel

- MS-Word

EDUCATIONAL ATTAINMENT

COLLEGE COURSE/DEGREE YEAR

Bulacan State University Drafting Technology 1997 – 1999 Computer Aided Design Training April to June. 2002 Revit 2013 MEP Training Aug to Oct. 2013

Revit 2017 Training Nov to Dec. 2017

PERSONAL DATA

Nationality : Filipino

Civil Status : Married

Sex : Male

Date of Birth : December 03, 1977

Place of Birth : San Simon Pampanga

Passport No. : P5596645A



Contact this candidate