Post Job Free
Sign in

Electrical Engineer Power Plant

Location:
Sivakasi, Tamil Nadu, India
Posted:
August 16, 2019

Contact this candidate

Resume:

D.HARI KRISHNAN

Mobile No: +91-994*******

E-Mail: ************@*****.***

1.Candidate’s Name : HARI KRISHNAN.D

2.Nationality : INDIAN

3.Proposed Project Position : ELECTRICAL ENGINEER

4.Candidate’s Employer : CHEMIN C&I PVT.LTD

5.Candidate’s current job title : ELECTRICAL ENGINEER

6.Current work location : CHEMIN C&I PVT.LTD,

RAJASTHAN, INDIA

7.Candidate’s languages known : ENGLISH,TAMIL,HINDI,AND TELUGU

8.Educational qualifications : B.E in Electrical and Electronics

Engineering (2011-2014)

Diploma in Electrical & Electronics Engineering (2008-2011)

9.Total No. of Working Experience : 5 Years’ & 2 Months Experience

10.WORKING EXPERIENCE

10.1. Position : ELECTRICAL ENGINEER

Company : CHEMIN C&I PVT LTD

Project name : SURATHGARH THERMAL POWER PLANT,

RAJASTHAN, INDIA

Contractor : BHEL

Client : RVUNL (GOVERNMENT OF RAJASTHAN)

Duration (from – to) : Oct. 2017 to Present 2019

Brief Description Responsibility Performed

Conduct Tool Box Talk prior to start the work

Prepares permit to work system prior to start the Job.

Coordination of project from office with site Procurement and Engineering.

Receive project documents and understands scope of work with the project.

Preplanning the materials and manpower required for the project.

Reported daily accomplishments and goals to engineering department manager.

Performed weekly meeting with supervisors and production management.

Leading a team of technicians and foreman, supervisors.

Review contract requirements for project execution, organize the preparation of the Technical Document Register (TDR), identify requirements and scope of work; review specifications Process Data Sheets (PDS),General Arrangement (GA) drawings, Review Philosophies, Area Classification Drawings, Fire and Gas Detector Layout Drawings and other relevant documents.

Establish contract review criteria, identify and resolve discrepancies and divergences from original proposal through the instigation of technical queries to client.

Prepare equipment and material specifications and data sheets, develop detailed engineering calculations and drawings.

the preparation of the design basis document, cable routing, control room layouts, Functional Logic Diagrams, Terminations Diagrams, Installation Hook-up Drawings, Electrical Plot Plans, Control Panel Drawings, Control/Equipment Room Lay-outs, Cable Tray/Trench Lay-outs, Cable Schedules and Cable Drum Schedules, JB schedules, Interconnection Schedules,

Fire/Smoke Detection Lay-out and Alarm Lists, Installation detail drawings and other design and layout calculations and drawings.

Review of Control System vendor documents ( Wiring drawing / Calculation / Logic)

Preparation / Review of Electrical Data Sheets (Motor, Electric Heater, LCP, LCS, Cables & Trays)

Preparation / Review JB interconnection drawing and Local control panel Logic & drawing

Selection of Electrical Equipment s like MCC Switch gears, Variable Speed drives and LT Cable.

Vendor drawing review for all Electrical equipment s (Motor, Electric Heater, LCP and LCS)

Erection and installation SWITCHGEAR, TRANSFORMER (HT & LT), NETWORK PANEL AND DCS PANEL

Inspection of Electrical equipment like Transformers, Breakers, Cables from vendor’s site.

Installation different types lighting and lighting JB as per the client requirements.

Good knowledge in PLC and other control panel wiring

Making as built drawings of sites and handing over drawings to client.

Follow-up Construction Work Schedule (Daily, Weekly & Monthly) such as Planning & Scheduling, the Sequence priority work or Critical works

Prepare Project execution plan and cash flow management.

Preparation of punch list and completed as per the scheduled targets dates.

Involved in the inspection of Cable Testing (IR & Continuity)

Involved of Cabling pulling, Glands, and Termination as per drawing and specification

Loop checking activities and preparation of loop folders attached to the recommended documents.

Pre-commission activities.

10.2. Position : ELECTRICAL ENGINEER

Company : SRIPATHI PAPER AND BOARDS PVT LTD, SIVAKASI

Project name : 6MW, THERMAL POWER PLANT, SIVAKASI.

Contractor : CHEMIN C&I PVT LTD.

Duration (from – to) : Aug. 2014 TO Sep. 2017

Brief Description Responsibility Performed

Monitoring of project progress and follow up as per project plan

Manage site drawing office to provide efficient provision of CAD drawing.

Co-ordinate with client for different aspects of engineering requirements.

Arranging material requirements, Manpower as per the project required.

Follow the updated drawing as per the project required plan.

Receive project documents and understands scope of work with the project.

Conduct review for timely delivery and execution

Involved the activities in cable tray installation and bus bar installation

All Instrument panels connected to grounding as per the standard and philosophy diagram.

Installation of Electrical panels, fire alarms, horn,becons, smoke detector and network antenna as per the installation standards

Installation different type of conduit G.I, PVC and flexible are used.

Ensure contractor has relevant, up to date codes, standards, specifications, contract documents and detailed drawings.

Involved cable pulling as per the scheduled documents.

Ensure proper installation of equipment, cable, glands, term lugs and kits, tray, tubing/fittings and other bulks.

Verify contractor, quality management systems, plans, procedures and processes are in place.

Interface with site engineers, construction superintendent/foreman on quality requirements/issues.

Monitor log out tag out, permit to work and other energy control procedures for compliance.

Promote safety awareness and safe working practices among project team members, instrument technicians

Commissioned Ethernet manufacturing network, Device net Network and Control net network.

Panel wiring, termination, logic diagram simulation testing Design of wiring diagrams & Panel wiring.

Testing, Loop checking and termination of cables. Preparing materials according to drawing.

Meggaring for low voltage cables, and Bus bars.

Electrical cable glanding & termination, GI containment works

Electrical Cable tray and Trunking installation, cable pulling its also done.

Preparing cable schedule for LV cables as per the Requirements of capacity of load