Maged Abdalla
MEP Manager
POB *00392 Lagoon
Doha, Qatar
*****.****@*****.***
MMUP-UPDA- Grade “A”
Profile
More than 10 Yrs experience in Gulf (Dubai, Bahrain, Cairo and Qatar) as Sr. Electrical Engineer, MEP team leader for a high reputation consultancy firms (DEC, NEB, MZECH, DMG and AEB), Certified Grade A –MMUP-UPDA, Jafza MEP Engineer. More than six years in facilities managements in various projects
Professional experience of electrical work (HV Switchgear, Step-down transformer, LV panels, SMDB, busbars and all related power connections), ELV work (Fire Alarm system, Voice Evacuation system, Access Control System, CCTV, IPTV, PABX, SMATV, GRMS and BMS ) and HVAC system, Chillers, Pumps, Fans, Elevators, Escalators, Fire Fighting Systems and Clean Agent System as well.
Hard working, fast, team player, multi-tasked, dependable, Problem solving with alternative solutions based on required factors cost/time/technical. Have a good experience with BS, NFPA, ASMII and other international standards, also DEWA, JAFZA, DCA, SWEA, FEWA, QCS, Kahramaa, QCDD as per Gulf local authorities. Ability to adapt to any environment and gain the required knowledge in short time. Skills
Microsoft Office (Word, Excel, PowerPoints, Access and Outlook AutoCAD, DiaLux, Short circuits / Voltage drop software (ABB, Schneider) Internet Searching specially for technical data, certification validates, authorized agents. Mother tongue is Arabic, Fluent in English and fair in French Work
History
Design &
Projects
Management
Group – DMG
http://www.dmg
-eg.com/
March 18–Present
MEP Manager-
Sr. Elec. Engr.
Theming Parks
(FEC at DFC)
(Angry Birds,
Virtoucity, Snow
Dunes & Junivers)
Lead MEP teams (Seniors and Inspectors) to achieve the target performance and improve KPI index (Quality and Time) Ensures that the MEP drawings are coordinated and in line with other discipline design drawings of the project prior proceeding with work to meet design and operator requirements as well.
Review bi-weekly Project Time Schedule (MEP activities) and Dashboard to ensure the construction activities within time frame and highlighting the critical activities and proper recovery plan if required Review and approve all IPC and VO compared to Contract documents Reviews and gives approvals for all electrical related submissions shop drawings, method statements, MEP coordination drawing, material approval and all related executed site work.
Coordinate all work for proper installation, HVAC systems, AHU’s, FCU’s, chillers, Chilled water pumps to meet project requirements and approved ACMV as per QCDD.
Ensure that BMS interface with all required system and recommended others if not mentioned in IFC specs for proper operation and avoiding lots of faults due to the unique project environment Arab
Engineering
Bureau – AEB
http://www.aeb-
qatar.com/
May 12 – March 18
Sr. Elec. Engineer
Projects
Majlis Grand
Mercure Hotel
QIB branches
Msherieb
Downtown-1A
Doha Festival
City (DFC)
Reviews and gives approvals for all electrical related submissions shop drawings, MEP coordination drawing, material approval request, Method statement of installation, Testing and commissioning submittal, As-Built drawings and OEM manuals.
Verifies that materials, manufactured goods, machinery, equipment, etc. Supplied to the job site are in line with projects specification, local authorities’ requirements and granted approvals.
Directing Electrical Engineers/Inspectors team
Achieve the executed work to get authorities approval, Kahramaa substation, Transformer rooms and HV installation. Coordinate all work for proper installation, HVAC systems, AHU’s, FCU’s, chillers, Chilled water pumps to meet project requirements and approved ACMV as per QCDD.
Service Tunnel installation supervision (Kahramaa substation, HV cables installation/trenches/tunnel ventilation and Jet Fans work. Liaising with CS team, Client, PM, FM and contractors, when required Review and recheck all maintenance process as a facility management after handling the project for one year warranty.
Work
History
Egyptian
Consultant
House (MZECH)
http://www.mzech.
com/
Oct.10: May 12
Sr. MEP
Engineer
Project: Kattameya Plaza - new Cairo, Sodic(Client) /Turner (PM) Ensures that the MEP drawings are coordinated and in line with other discipline design drawings of the project prior proceeding with work and to highlight to the PM of any discrepancies for necessary actions. Coordinate and review on time all electrical shop drawings, material submittals, WMS, RFI and close-out documents.
Reporting to PM included site progress, performance, LOGs and delay Directing MEP team to solve problems with alternative solutions at minimal cost /time impact.
Liaising with CS team, Client, PM and contractors, when required Al-Shafar
General
Contracting -
ASGC
https://www.asgc
group.com/
Oct. 09: Oct10
Electrical
Manager
Marassi Project
Emaar (Client),
Turner (PM)
Management and coordination the electrical work (executed by sub- contractors) for 254 Villas,
Prepare, Review shop drawings /coordination drawings and materials submittals prior to consultant approval
Preparing the RFI, technical issue, materials required, cost control, progress report and payments certificates
Reporting to the GM daily/weekly progress/technical/payment/VO Prepare / Reviews all electrical related shop drawings, coordination drawings, material submittals and WMS prior consultant submission. Verifies materials, manufactured goods, machinery, equipment, etc. Supplied to the job site are in line with projects specification, local authorities’ requirements and granted approvals.
Directing Electrical Engineers/Inspectors team and assisting in solving site problems in alternative solutions.
Providing interpretations and clarifications to RFI’s upon client/contractor requested.
Dimensions
Engineering
Consultant
https://www.dim
ensions-ec.com/
Sept.06:Oct.09
Sr. Elec.
Engineer
Dubai
Sharjah
Bahrain
Review Design drawings before tendering stage to avoid any conflict or uncoordinated to meet Authorities’ regulation, DEWA substation review and approve the work shop drawings and materials submittals for various projects including the follow-up and supervision of the site works according to the design drawings, specifications, standards (BS, NFPA, EN, IEE and authorities’ regulations (DEWA, JAFZA, Etisalate, Du and Tecom) for Dubai Projects’ and EDD (for Bahrain Projects), As following: Twin Towers (JAL Hotel “2B+G+55+4Mech”, MUT “B+G+45+3Mech” & 2No. Parking each 2B+10), Project Cost 750M Dhs.
KG Tower in Dubai Marine, (2B+G+19), 100M Dhs, Residential Fortune Tower in JLT, (4B+G+34+Mech), 120M Dhs, Offices New Dubai Gate Tower in JLT,(6B+G+39+DF), 180MDhs,Residential Fortune Executive in JLT, (4B+G+34+Mech), 120M Dhs, Offices 134 Villa (Discovery Garden), Nakheel
Barsha Complex (2 Buildings “2B+G+12+HC+RF”) Seasons Community in JV (4 plots)
Q.Sami Tower in Business Bay (4B+G+3P+28+HC)
Landmark City View in Bahrain (G+5P+16+HC+RF)
Reef Island, Bahrain (3 Buildings”2B+G+6+RF)
Tarsheed
Consultant
Office (NECE)
http://www.tarsheed-
eg.com/ar/Default.aspx
Oct.05:Spet.06
Sr. Projects Eng.
PG District
Cooling Plant
Review, supervision and monitor site work of Port Ghalib District Cooling Plant (7200TOR), 160 Million LE cost (Kharafi National at Marsa Alam). Infrastructure work of District cooling network till the end users
(Hotels/resorts), including the billing system of each user. MEP Design review for Power Station of New AUC Project "Co-generation Power Station 8MVA".
Reports preparing for various factories which will modified or renovated with the cooperation of FEI sectors “Federation of Egyptian Industries” Such as ECO “Environmental Compliance Office” and IMC “Industrial Modernization Center” based on surveying reports.
Work
History
Misr Invest.
Co. Misr Bank
Group
Sept.02:Oct.05
MEP
Maintenance
Engineer
Tower of Bank
Misr
(2B+G+MZ+2
Mech. + 24 offs.
flrs+ RF)
Facility management and maintenance of the bank Tower. Achieve the bank requirements, improvement and developments, as this Tower consider the Heart of Misr Bank and Routers News Agent. Supervision and follow-up for preventive maintenance achieved by the responsible companies “Agents”, like Generators "4Nos. Cummins - 720Kva", Chillers "3Nos. Carrier X500 TOR", 14Nos. Of Express Elevators
(UK), Central UPS System "4*120Kva" and FA System. Responsible and follow-up for the renovation of old systems (i.e. FA system, Busbars, Panels, ...etc.)
Replacing of 3 busduct risers 1250A/IP42 by 1250A/IP56 for 25 floor Replacing 18 no's. Of ACB/MCCB ranges from 1200A to 5000A Creation of central alarms panel (simulate to BMS) which collect most of systems for 30 floors tower, collecting from cooling tower water tank, chillers, pumps, lift stations, domestic water tanks, etc. Install new P/A system in conference room in 24th Floor. Pumps Maintenance like domestic water, hot water, chilled water and extract fans, electrical doors, firefighting pumps, FCU’s and AHU’s. ORASCOM
Construction
Industries
http://www.oci.nl/
oci-sae/
May01: Sept02
Sr. Elec.
Engineer
Project: Golden Pyramids Plaza (City Stars ) - Holiday Inn Hotel Responsible for electrical installation works, other discipline coordination, team supervision and monitoring to the MEP Manager. Installation of the electrical work according to approved shop drawings with accommodate of Master Time Schedule of the project. Installation of LV networks cables, trays, busbars, LV Boards, MV switch- gear, Transformers and ELV like, FA, PA, MATV and PABX. Installation of Domestic Water Station, Boilers, Fire Fighting and Swimming Pool pumps rooms.
Sol Y Mar for
Hotels&
Resorts Aug.99:
May.01
Acting
Facility
Manager.
Zaafarana Hotel
Les Rois Hotel
SOLYMAR
Sharming Inn
Waves Resort
I was promoted from Maintenance Engineer to Acting Chief Engineer for Various Hotels/resorts based on SolYMar. Hotel/resort preventive maintenance as per annual plan, reporting to Area Chief Engineer Finishing the 100 Rooms, 32 Chalets and Time-Share 45 Villas for Hotels Opening by the maintenance staff and outsourcing technicians. Leading the maintenance staff for repairing the emergency cases of breakdown and achieving preventive maintenance schedules Manage all required materials, spare parts, stock control in stores and tools for maintenance plan that's according hotels/resort budget. Operate and maintain Hotel/resorts system and equipment like Gen-sets, Boilers, Chillers, Pumps, Fans Fire Alarm, Public Address, PABX, MATV, Swimming Pools Pumps, sewage station blowers, Water Booster Sys., SPA machines, Kitchen and Laundry Equipment.
Water treatment of swimming pool, hot water and chilled water sys. Testing and commissioning of various Systems for soft-opining also the Grantee Certifications according contracts per each Contractor. ORASCOM
Projects&
Tourism
Jun.98:Aug.99
Elec. Engineer
Responsible for electrical and light current installations of projects
“Rihana Hotel "Five Stars Hotel", Nubian Villas, El_Gouna Villas stages III&IV and El_Gouna International School that's was according to the design drawings as per the OPTD target and requirements. DB’s and Pumps Control panels constructions in the central workshop Installation of Sewage Station, Domestic Water Station, Boilers and Swim Pool Pumps room according the design drawings and Project specs. Education
Cairo University
1991 – 1996
B. Sc. Electrical Power and Machines Engineering Acc. Grade: Good Faculty of Engineering
Membership
Member of Egyptian Engineers Syndicate
Member of UAE Engineer Syndicate
LEED Accreditation MEP Engineer, JAFZA (Jabel Ali Free Zone Authority) UPDA- Qatar, Grade A
Study for getting PMP
Study for getting LEED Green Accreditation AP
Personal
Information
DOB :12th Nov. 1973
Egyptian
Married and have three kids.