CURRICULUM VITAE
AHMED YOUSSEF SAFY
Egypt Engineers Syndicate No. : 01/71301
Mob. No: +966(0)560743404
E-mail: ac8qfx@r.postjobfree.com
Jeddah, Saudi Arabia
EDUCATION
BSc of Electrical Power Engineering, Faculty of Engineering, Alexandria University
Graduation year : 1999
Overall Grade : Good (CC)
Graduation Project :
Studies of Instrument (Current & Voltage Transformers)
Grade of Graduation Project: Very good (BB)
LANGUAGES
Good command of English Language (Speak, Read & Write)
PROFESSIONAL EXPERIENCE
Company Name
:
WSP Mouchel Middle East Ltd.
Job Title
:
Senior Electrical Engineer (Street Lighting Maintenance)
Duration
:
2015 - Present
Project
:
Operation and Maintenance (O & M)
Responsibility:
-Conduct feasible study for the contract agreement between the client and the contractor
-Determine the scope of work of each contractor
-Check the material approval submitted by the contractor for verification and conformity of all materials project to project technical specification
-Attend meeting with the Client to clear problem issues arising in construction site(s)
-Conduct site inspection to verify the technical report(s) submitted by the contractor before approval and further processing
Company Name
:
Saudi Arabian Parsons Ltd. – Jeddah
Job Title
:
Senior Electrical Engineer
Duration
:
2014 - 2015
Project
:
Operation and maintenance (O & M)
Employee ID No.
:
9439b
Responsibility
-Maintenance of Lighting Network (South of Jeddah)
Company Name
:
Eastern Construction Est. in KSA
Job Title
:
Project Manager
Duration
:
2012 – 2014
Project
:
Maintenance of Lighting Ntwk. in Historical Area
Responsibility :
Daily works: Heading to the site early in the morning to follow workflow
Giving instructions to the site engineer and foremen
Monitoring activities carried out on a daily basis
Delivering/Handing over executed work to Jeddah Municipality
Description of Activities:
-Installation of 500 Decorative Lighting Poles (4m high) (w/single arm)
-Installation of 50 Decorative Lighting Poles (w/quad arms)
-Installation of 100 wall arms and 50 hanging lanterns
-Installation of 800 lanterns (150W sodium)
-Lay out of 12000 m 4*16 mm2 cu cables
Company Name
:
Amir Group Co.
Job Title
:
Sr. Electrical Engineer
Duration
:
2010 – 2012
Project
:
Construction of Porto Sokhna Tourist Resort
Responsibility :
Daily work :
-Heading to the site early in the morning to follow workflow
-Giving orders to the Site Engineer in charge of MV and LV Network; as well as to the internal electricity engineer.
-Writing the daily technical reports on MV and LV Network Activities, alongside with the necessary reports on internal electricity
-Preparing daily reports of executed works to Electricity Director
-Processing Monthly Payment Certificates of Subcontractors
Description of Activities:
Executing LV and MV Networks (Two Distributers 4 Cells 2 Loops Installation of 34 TR rooms 1.5 MVA (Dry))
o128 LV Distributor
o10,250 m 3*240mm2 MV Aluminum Cable
o8,900 m 3*185+95mm2 LV Aluminum Cable low voltage
o6,500 m 4*25mm2 cu Lighting Cable
o130 Sodium Lanterns 250W
o11 Lighting Distributor, 130 Lighting Poles 8m,
o540 Decorative Poles 2.5 m for Landscape lighting
Executing Light Current Network
Extension of 12000 m 3-inch pipes, 82 hand hole, 34 manhole, converters, fiber optic cables
Internal electricity for 1200 Villa
Villa has 18 socket 3*4mm2, 4 power socket 3*6 mm2, 15 switch 3*3mm3, and 5 phone socket MDB 100A MCCB 3ph
Company Name
:
Subhi Hussein Co.
Job Title
:
Project Manager
Duration
:
2008 – 2010
Project
:
Responsibility :
Daily work:
-Heading to the site early in the morning to follow workflow
-Getting a daily report of the site engineer(s)
-Handover of works executed
-From 1:00 to 6:00 pm in the company's office,
-Provision of materials required for the work sites
-Submitting the Weekly Report to the Owner
-Studying Electrical Projects intended to be carried out
Description of Activities
-Executing the internal electricity of Kazabianka Village Buildings
o A Project composed of 280 villas where each and every villa contains 26 sockets, 19 switches and 9 phone sockets
oMain panel for the villa 100 A MCCB
-Executing the internal electricity and street lighting in Alex Car Club
oA Project composed of 120 rooms where each and every room has power saver card, 8 sockets, 4 switches and 2 phone sockets
oExecuting 129 Galvanized Lighting Poles (10m high) with 4*25 mm2 Aluminum Cable XLPE-STA
-Studying electrical projects in favor of the Company/Employer
Company Name
:
Digital Telecom Co.
Job Title
:
Project Manager
Duration
:
Project reform and development of the Electricity network for Plateau Central Mokattam, Cairo, Egypt
Project
:
2003 - 2008
Daily work:
-Heading to the site early in the morning to follow workflow
-Getting a daily report of the site engineers
-Supervising purchase of all cables and materials required for work
-Handover of executed works to Egyptian Electricity Company
-Holding weekly meetings with site engineers to follow up with the workflow
Description of Activities:
-Executing network cables medium and low voltage for the Project
oInstallation of 117 transformer Rooms (1 MVA)
oInstallation of Three (3) Distributers (composed of 8 cells 4 loops)
o250,000 m3*240mm2 MV Aluminum Cables
o75,000 m 3*185+95mm2 LV Aluminum Cable
o85,000 m 4*25 Lighting Aluminum Cables
o950 Mercury Lantern 125W, 650 Sodium Lanterns (with Capacity of 250W)
o396 LV Distributors
-Executing street lighting for the project
o40 Lighting Distributors
o250 Lighting Poles 8m,
o890 Lighting Poles 6m
Company Name
:
Egyptian Co. for Electric cables &General Building
Job Title
:
Site engineer
Duration
:
2000 - 2003
Project
:
Responsibility:
Daily works :
-Heading to the site early in the morning to follow workflow
-Giving orders and instructions for the daily work of supervisors and follow all electrical work throughout the day
-Follow-up work in case of emergency and solve it
-Send weekly reports of the executed works for the project manager
-
Description of Activities :
-Executing Housing Complex Project, Alexandria, Egypt
oA Project for Construction of Housing Units consisting of 14 floors in Alexandria, Egypt
oFlat has 32 socket 3*4 mm2, 29 lighting switch 3*3 mm2 and 8 phone sockets
oMain panel 1400 A MCCB 3 ph
oSub-panels for each flat: 63 AMP MCB 3ph
Company Name
:
Flamenco Construction tourist (FCT)
Job Title
:
Site engineer
Duration
:
1999-2000
Project
:
Responsibility :
Daily works :
-Heading to the site early in the morning to follow workflow
-Giving orders and instructions for the daily work of supervisors and follow all electrical work throughout the day
-Follow-up work in case of emergency and solve it
-Send weekly reports of the executed works for the project manager.
Description of Activities :
-Executing internal electricity network
-Construction of a tourist hotel on the coast of the Red Sea (a 850-room hotel project).
-Responsible for all electrical works, light current network and control panels.
-Execute landscape lighting as follows:
o64 decorative lighting pole 4 m, 800 m 4*16 mm2 cu XLPE –AST
o64 decorative lanterns 150W sodium
oOne (1) lighting panel with digital timer
COMPUTER SKILLS
Excellent user of Windows OS and MS Office Package
Expert in Adobe Photoshop.
Internet
Having good working knowledge about Computer hardware.
Outstanding user of AutoCAD (2D & 3D)