Post Job Free
Sign in

Project Customer

Location:
Canada
Posted:
March 01, 2019

Contact this candidate

Resume:

Page * of *

Summary of Profile:

• Work experience in the field of telecommunication gained both in local and abroad projects.

• Experience in Installation and Commissioning of Transmission and Base Station Systems ( CDMA / WCDMA ).

• Carrying out Network Preventive Operation and Maintenance / Troubleshooting of NSN WCDMA (3G) Flexi BTS and documenting them.

• Installation Supervision and Commissioning of Nokia Flexi Edge ; MR BTS GSM/EDGE.

• Installation Supervision and Commissioning of Nokia LTE equipment which has RF sharing with 2G and 3G layer.

• Installation Supervision, Commissioning and Integration of Nokia LTE 800/1800/L2100/2600 equipment. ( Feeder / Feederless / RRH solution ).

• BTS Equipment Swap Supervisor ( Malaysia & Bangladesh ).

• Provide technical site survey reports and as-built report before and after site activity. WORK EXPERIENCE

COMPANY Nokia

Period

Covered:

June 30, 2015 up to Feb.17, 2019

Ooredoo LTE Project

TI - Supervisor

Doha, Qatar

June 30, 2015 to February 17, 2019

• Supervise Installation, Commissioning and Integration of Nokia LTE 800 / 1800 RF sharing with 2G DCS / 2600 / 2100 bands ; Flexi Zone Outdoor Micro and Pico BTS ( Smallcell ) ; Flexi lite BTS.

• Perform site verification of subcon installation quality and make sure it conforms all standard .

• Check subcon compliance of NSN Health and safety standard and procedures.

• Update in IPM every site completed.

• Supervise feeder cable vswr sweep testing and PIM testing activity and make sure proper testing procedure are followed proper connector attachment to feeder/jumper cable are observed .

• 3G Nokia Flexi WCDMA BTS Commissioning, Installation, Integration, Functionality testing & Operation and Maintenance / SW Upgrading .

• 2G Nokia Flexi EDGE / Multi Radio BTS Commissioning, Installation, Integration & Functionality testing.

Performed Commissioning & Troubleshooting of 2G Nokia Flexi EDGE BTS. NAME EDWIN J. CORNISTA

POSITION

Telecom Technician

C U R R I C U L U M V I T A E

Page 2 of 5

COMPANY ETSI Technologies, Inc.

Period

Covered:

Nov.15,1991 to June 30, 2015

Project Name Position Location Date Start & End

GLOBE 3G MS Field OPS. NGMA JAN. 2008 – DEC. 2010

• Performs day to day preventive & corrective maintenance, troubleshooting, upgrading of Globe/NSN WCDMA (3G) Flexi BTS and documenting them .

• Commissioning of 3G Nokia Flexi WCDMA,

• Respond to Emergency Call trouble and special activities within the area of responsibilities.

• Performs frequency, IUB and software upgrade of 3G Nokia Flexi WCDMA BTS.

• Cable Testing / Sweep Test using site master Anritzu.

• Perform basic functionality testing.

Project Name Position Location Date Start & End

Various Telecom Company

Projects

TELECOM

TECH.

PHILS. 1996 - 2004

PLDT, SMART, PHILCOM, LIBERTY TELECOM, GLOBE TELECOM( PALAWAN BACKBONE) - TELECOM UPGRADING PROJECTS.

• Supervised Installation of SIEMENS SDH Fiber Optic & SDH Microwave Radio including Multiplexers.

• Supervised Installation of SIEMENS PDH Microwave Radio including Multiplexers.

• Installation Rectification and Commissioning of Siemens SRAL XD Microwave

• Coordinate with the Implementation Manager all the progress of on-going site installations and customer requirements on a particular area to deliver the customer satisfaction.

• Perform site survey and inspection to determine the status of site prior to installation.( i.e. tower and shelter )

• Responsible for preparing all necessary materials need on a particular sites to carry on the sites installation.

• Ensures that equipment installations conforms with NSN standards and customer specification.

• Supervised equipment and materials delivery to the radio relay station and make sure that it is being handled properly.

Project Name Position Location Date Start & End

Various Telecom Company

Projects

TELECOM

TECH.

PHILS. 1991 - 1996

PLDT, SMART, ISLACOM, PT&T - TELECOM PROJECTS

.

• Installation of different type of SIEMENS PDH Radio and Multiplexers including Parabolic Antenna.

• Installation of Motorola ( D900 ) BTS for ISLACOM GSM Mobile project.

• Installation of CTR 190/210 PDH MW for ISLACOM GSM Mobile project.

• Performed the installation of Siemens SDH Fiber Optic equipment.

• Assure that the installations conform with siemens standard and in accordance with the approved plan and customer specification.

• Prepare As-built plan and update the customer existing equipment layout plan immediately after the installation is completely done.

FOREIGN DELEGATION PROJECTS :

Project Name Position Location Date Start & End

Ooredoo LTE Ph2 Project

TI - Supervisor

Doha, Qatar

April 17, 2013 to June 30, 2015

Page 3 of 5

• Supervise Installation, Commissioning and Integration of Nokia LTE 800 / 1800 RF sharing with 2G DCS / 2600 bands ; Flexi Zone Outdoor Micro and Pico BTS ( Smallcell )

• Check and verify site installation quality.

• Check subcon compliance of NSN safety standard and procedures.

• Update in IPM every site completed.

Project Name Position Location Date Start & End

QTEL UMTS 900 Project

TI - Quality

Supervisor

Doha, Qatar

Sep. 10, 2011 to Dec. 30, 2012

• Supervise site installation, commissioning and integration of UMTS 900 / UMTS 2100 / DCS 1800 / GSM 900 then perform site PAT with the customer representative.

• Check quality of installation and make sure it conforms with NSN and customer specifications.

• Verify and check equipment request and delivery before site installation.

• Installation and Commissioning of DCS 1800 and UMTS 2100 for In Building Solutions.

• Site Troubleshooting for undetected MDGA, MHA and RET .

• Inspect subcon personnel for PPE complaint before site activity.

• Update in ( IPM ) Integrated Project Management site status after integration..

• Perform F2 and CE ( channel element ) upgrade of 3G network.

• Initiate site survey for possible LTE trial sites.

• Perform alarm clearing and installation rectification of Flexi Packet radio Hub 800. Project Name Position Location Date Start & End

CELCOM NodeB

Modernization Project

Field Engr. Kuala Lumpur

Malaysia

Dec. 15, 2010 to March 15, 2011

• Performs troubleshooting / isolation and clearing of alarms of CELCOM / NSN WCDMA (3G) Flexi BTS.

• Cable Testing / Sweep Test using site master Anritzu.

• Coordinate and report to customer FOD personnel before and after every site activities.

• Proceed to and locate site by means of GPS Navigator.

• Perform basic functionality testing.

Project Name Position Location Date Start & End

WATANIYA ( NEDJMA )

BTS Roll-out Project

PDH MW

Comm’ng.

Oran, Algeria Oct. 2007 - Sept. 2008

• Supervised SRAL XD Microwave Installation, Commissioning and perform BTS Site Integration.

• Telecom implementation and provissionary acceptance with customer / operator representative.

• Ensures that equipment installations conforms with NSN standards and customer specification. Project Name Position Location Date Start & End

STARHUB PDH MW Roll-

out Project

PDH MW

Comm’ng.

Singapore Sept. 2005 – April 2006 March 2007 – April 2007

• SRAL XD MW 24/7 operation and maintenance.

• Implementation Commissioning of SRAL XD MW equipment.

• Commissioning of SRAL XD MW software and hardware capacity upgrade.

• Performed site verification for proper installation of antenna, outdoor unit and indoor unit as per customer specifications and conform to siemens standard.

• Perform Preliminary Acceptance Test of SRAL XD MW completed links. Page 4 of 5

Project Name Position Location Date Start & End

LIPPO – MAXIS 2G/3G

Co-located Roll-out

Project

Infra. Site

Survey Engr.

Jakarta,

Indonesia

May 2005 - July 2005

• Perform technical site survey for suitable location of Tower & Shelter for 2G & 3G Mobile System.

• Prepare survey report base on data gathered on site.

• Coordinate to Radio Network Planning for the required height of the GSM antenna. Project Name Position Location Date Start & End

BANGLALINK BTS Swap

and Roll-out Project

Swap

Supervisor

Dhaka,

Bangladesh

Dec. 2004- March 2005

Perform installation and supervision of swapping Ericsson RBS (Radio Base Station) to Siemens 2G BS240

& replace old antenna to a new GSM antenna.

• Ensures that telecom installations conforms with Siemens standards and customer specification.

• Implementation Commissioning of SRAL XD MW equipment and perform BTS site integration.

• Supervise installation of ELTEK rectifier.

• Perform Installation supervision, commissioning and Troubleshooting of Microwave Radio SRAL XD

(System Radio Access at Low Capacity)

• Perform installation and supervision of siemens BSC. Project Name Position Location Date Start & End

DIGI swap – out Project Swap

Supervisor

Kuala Lumpur,

Malaysia

July 2003 – July 2004

Supervised and lead the Hot Swap Installation and Commissioning of Base Transceiver Station from Ericsson to Siemens 2G BTS BR 7.0, particularly BS240, BS240XL, BS241, BS 82 type. Assure that the installations are in standard and in accordance with the approved plan and customer specification.

Coordinate with Installation Swap Manager all the progress of on-going site installations and customer requirements on a different particular area to deliver the customer’s satisfaction. .

• Perform Technical site survey and inspection to determine the status of site prior to the swap out activity.

• Assist and support the Siemens Acceptance team during their acceptance specially when requires joint troubleshooting.

• Provide support on the Radio Network Planning on going optimization.

• Prepare an As-Built plan and update the customer existing equipment layout plan immediately after the installation is completely done.

Follow up the day-to-day technical problems encountered by the team during the installation . Project Name Position Location Date Start & End

SABAFON TELECOM Mobile

Roll – out Project

Installation

Supervisor

Sana’a, Yemen Mar.2001–August 2001

• Installation Supervision and performed BTS240 site network integration.

• Installation Supervision of BSC, TRAU and SRAL XD MW ( Low Capacity ).

• Installation of Siemens DC power supply system particularly GR 40 rectifiers including batteries. SKILLS INVENTORY

Language/s / Fluent English, Tagalog

Soft Skills MSExcel / Word

Driving License (YES/NO) YES

Page 5 of 5

TRAININGS AND CERTIFICATES

Course Title Training Center – Location Date Attended Airscale LTE Radio Access System ( RA4112-

17-LTE )

Nokia Networks - Doha, Qatar July 30, 2017

IP and Ethernet Essentials for Flexi Packet /

Flexi Packet Multi Radio Installers ( CT3408-

01A )

Nokia Networks - Doha, Qatar Feb. 5 to Feb. 6, 2014 Nokia Flexi Multiradio Installation and

Commissioning RL40 ( RA4110-05 )

Nokia Networks - Doha, Qatar April 18, 2013

Flexi Packet Multi Radio ( FPMR Hub 800 )

Installation and Commissioning

Nokia Networks - Doha, Qatar June 4, 2012

Flexi WCDMA BTS Installation and

Commissioning ( RA4531-04N )

Nokia Networks - Doha, Qatar Oct. 27 to Oct. 28, 2011 Flexi Packet FP 15 – Operation

Administration ; Maintenance and

Commissioning.

Kuala Lumpur, Malaysia

June 20 to June 24, 2011

Nokia Flexi EDGE BTS Training. ETSI - In - house June 2010 Nokia WCDMA Flexi BTS ( RU10 version ETSI - In - house May 2010 Nokia Flexihopper Installation &

Commissioning .

Bandung, Indonesia June 2007

GSM Basics & SBS Commissioning . ETSI - In - house June 2003 Antenna Installation & SRAL Comm’ning

Course .

ETSI - In - house March 2003

SRAL Enabling Course . ETSI - Mercedes July 2002

Andrew Cable Splicing & Connector

Attachment .

Makati City, Phils. April2002

SDH Introduction / SDH Basic training . ETSI - In - house January 2000 Installation for Siemens Transmission Systems

.

Bandung, Indonesia February 1994

Contact Numbers :

Mobile # Qatar : +974-********

Mobile # Phils : +963 917-***-****

email : ac8m54@r.postjobfree.com

EDUCATIONAL BACKGROUND

College Diploma Diploma in Radio Communication Technology Name of School/University Cebu Technical School, Cebu City, Philippines



Contact this candidate