RESUME
Having around ** year’s relevant experience in Land Surveying. At
UAE, Oman and Qatar in Road and structural sections. Looking forward for more challenging opportunity to prove the ability. Permanent Address:
Riyazul Islam
Vill+Post+Thana: Kashiani
District: Gopalganj
Bangladesh
GSM: +880**********
Present Contact:
Doha Qatar
************@*****.***
Personal Details
Name : Riyazul Islam
Father’s name : Late Golam Liaquat
Mother’s name : Rashida Begoum
Date of Birth : 10/01/1984
Height : 172 cm
Marital Status : Married
Passport No : BR 0372637
Valid till : 01 Jan 2023
Nationality : Bangladeshi
Religion : Muslim
Sex : Male
Known Language : English, Hindi, Urdu, Arabic and Bengali. Educational Qualification
Bachelor of Arts 2007
M.A Khaleque Degree College. Kashiani, Gopalganj
2004 Higher Secondary Certificate (Intermediate ISC) M.A Khaleque Degree College. Kashiani, Gopalganj
2002 Secondary School Certificate (Matriculation)
Kashiani G.C Pilot High School
Worked as an assistant Land Surveyor for Cebarco WCT. Executed Project:
Yas marina circuit (Formula 1 Race Track) Abu Dhabi (UAE) Company: Cebarco WCT WLL
Period: December 2007 to August 2010
Position: Asst. Land Surveyor
Worked on Buildings Setting out, levels, as built and controlled all survey with own responsibilities.
Worked on tunnel setting out and leveling
Setting out for road alignment and turning arc on race track, shortcut, access road, run off and service road and calculating levels for super elevation and Vertical curve.
Setting out and leveling for Road Kerbstone and footpath.
Worked on MEP setting out and as built for special electronics, vacuum sewers, U- drains, Storm water, chilled water, Irrigation tank, portable water, manholes fire hydrant, street lighting, road furniture and many with complete as built.
Hycap and slot drain with the Race track.
Surveyed on Boundary wall, Beta fence. FIA fence and Guardrail along with main Race track.
Taking as built of race track, shortcut, service road, access road and parking area by Digital level machine (Tremble Dini).
Taking as built for U-drain, vending area, pedestrian, Road signage, many kinds of manholes
Making topography work by GPS for-
o Bund and filling area.
o Green area (landscape)
o Stock pile
o All kinds of roads.
Download and upload data from data recorder (Total station, GPS Controller, Digital level machine) To Computer and computer to data recorder.
Prepared the as built drawings and coordinates sheets for final submission by Auto cad and Microsoft office.
August 2010 to October 2013
Worked as a Land Surveyor for Able Middle East Construction Co. LLC Project Executed:-
• Batina coastal road project Section – 2 (Shohar Port to Khatmat Malaha)
• Haima Shamha Road Project ( Haima to Shahma)
• Batina Coastal road project Section - 3 (Interchange) Company: Able Middle East Construction Co. LLC
Period: August 2010 to October 2013
Position: Land Surveyor
Works Details
Setting Out for-
o Centerline and ROW of Main carriageway and match lane of Interchange. o Centerline and ROW of Service Road
o Ramp and Loop Road of interchange.
o Roundabout and match lane with existing road.
o Layby, T Junction, Parking attached with main Carriageway. o Slope trimming.
Joint survey with consultant for foundation and intermediate layers of Embankment filling.
Preparing daily Inspection reports, level sheets and approving from consultant.
Giving levels for Embankment layer, Subgrade, including super elevation as per Design
Checking toe width in every layer as per cross section.
Preparing all the survey data co-ordinates and levels.
Preparing and calculating filling quantity report weekly and monthly for progress.
Preparing Grid shit of level, width and all the other supporting documents as per cross section.
Download and upload data from data recorder (Total station, GPS Controller, Digital level machine) To Computer and computer to data recorder. January 2014 to December 2016
Working as a Land Surveyor for Muscat Road Construction & Civil Works LLC Project Exicuted:
• Sultan Qaboos University and Hospital Asphalt Road & Parking With/Without Shade, Bus Parking With Guard Rooms
• Beautification and Maintenance works under the municipalities of Muscat, Bowsher, Seeb and Al-Ansab
• Car park at Al-Musannah Technical College
• Topographic Survey for several Location Around.
Work Details:
Setting out and Leveling for-
o Kerb Stone
o Road Alignment
o Parking Shelter foundation
o Box Culvert
o Retaining Wall
o Security Building
o Stone Pitching (Rip Rap)
o Manhole
o Road Marking
o Road Furniture
Etc
Monitoring works and making reports for
o Sub Grade and Sub Base Filling thickness
o Asphalt thickness every layer
o Excavation for pipe line
o Pipe line alignment and slope
• Etc
Preparing Submitting as Built Report monthly for Quantity and Final As built for handing over.
Taking topographic for OGL
Preparing Design shop drawing and proposed level for Clint Submission May 2017 to till Date
Working as a Land Surveyor for JJ Infrastructure
Project Executed:
• Lusail Real estate and development Project
o Pipe laying
o Monitoring Pipe Alignment and Levels
o Monitoring excavation
o Setting and as built for pipe line and manhole.
o Joint survey and inspection with consultant.
o Preparing Survey check reports.
o And controlling all types of survey records and documents.
• Under Qatar Rail
Gold Line Metro (Road Diversion, Road Reinstatement, Internal Road, EV Route, Strom Water network And many more utilities), At Al Aziziya Station, Sports City Station, Al Waab Station, Al Sudan Station, Al Joan Station Al Saad Station, Bin Mohammad Station, Souq Waqif Station, And Rasbu Abboud Station.)
Red Line Metro (Road Diversion, Road Reinstatement, Internal Road, EV Route, Strom Water network And many More utilities) At Corniche Station, Al Bidda Station, West bay Station, DECC Station, City Centre Station, Arch R/A Station, Katara Station, and DGC Station.
Green Line Metro (Back filling work) Switch Box Station, Al raayan Al Qadim Station. Trough Station, QNL Station.
`
Works Details
Making the Topographic Survey for OGL and submitting to consultant.
Creating and calculating the formation levels and the PGL for access road and parking area with the drainage system.
Monitoring All Kind of Excavation
Calculating Volume Of earth
Preparing Proposed layout Drawing
Drawing Modification
As built Drawing
Download and upload data from data recorder (Total station, GPS Controller, Digital level machine) To Computer and computer to data recorder.
Solving issue from interface
Setting out and Leveling for:
• Road Alignment (Sub Grade, Sub Base And Asphalt)
• Fire truck hard stand
• Kerbstone
• Pipeline and
• Manholes
• Gully
• Footpath
• Road Marking
Monitoring works and making reports for
• Sub Grade and Sub Base Filling thickness
• Asphalt works thickness every layer
• Excavation for pipe line
• Pipe line alignment and slope
• Kerb laying
Strengths
Can use RTK GPS item Trimble SPS750 Max (base) with SPS780 (Rover) System. And GeoTac RTK GPS System
Making traverse and fly the level for new control point.
Preparing levels contours from topographic Survey.
Preparing As built drawing and coordinate sheet.
Preparing Shop Drawing and Proposed Level.
Already used total stations
• Nikon,
• Trimble,
• Laica,
• Sokkia
• Topcon
• Geomax
Can use automatic level, laser level and Digital level (Trimble Dini).
Can work independently for full range of survey tasks carried out based on the design and target.
Can prepare and process own survey data, from drawing by using AutoCAD and other applications
Experience on working on live road in the by maintaining safety rules.
Omani Driving License Holder (GCC)
Computer knowledge-
• MS Office package
• Autodesk AutoCad & Civil 3D
• Trimble geometric office (TGO)
• Internet Communication
• Adobe and Graphics
Declaration
I am hardworking, confident and looking forward to more challenging opportunities. Hereby I declare that all the above mentioned information is true to the best of my knowledge.
(Riyazul Islam)