Post Job Free

Resume

Sign in

Power Plant Electrical

Location:
Cebu City, Central Visayas, Philippines
Posted:
February 06, 2019

Contact this candidate

Resume:

JOVITO LEOPARDAS CAJUELAN

Colveta * Basak San Nicholas,Mambaling,

Cebu,City 6000

Mobile Numbers:+639*********/+639*********

Email: ac8ext@r.postjobfree.com

PROFESSIONAL PROFILE:

-Experienced in power plant and refinery

-Equipped with experienced in installation of building wiring and fitting

-Handling the installation of cable duct and cable tray support and grounding conductor connection

-Able to install fire alarm system,telephone and communication and cctv’s

-Installation of sound system and an audio-video technician

-A highly versatile for a challenging work environment

-With excellent interpersonal skills

-Enjoys being part of a successful and productive team

PERSONAL INFORMATION:

Age: 45

Date of birth:July 9,1973

Sex: Male

Status: Married

Citizenship: Filipino

Religion: Roman Catholic

Height and Weight: 152.4cm,55 kg

Languages spoken: Filipino,English, Arabic, Hindi

EDUCATIONAL BACKGROUND:

TERTIARY LEVEL Associate in Marine Engineering

University of Cebu

Sanciangko Street Cebu,City

SECONDARY Don Carlos Ledesma National High School

San Carlos City, Negros Occidental

PRIMARY La Mesa Elementary School

San Carlos City, Negros Occidental

SEMINARS AND TRAININGS ATTENDED:

National Certificate 2 Building Wiring Installation

February 8,2008

Technical Education and Skills Development Authority(TESDA)

Kalahuan Minglanilla,Cebu City

WORK EXPERIENCES:

June 2016 up to present-

Foreman Electrician- SAMYOUNG COMPANY SAUDI ARABIA LTD

JIZAN SAUDI ARABIA ARAMCO PROJECT AND REFINERY TERMINAL

-handling 25 persons in my team and divided into five groups,each group has different task assignment; first group is for installation support, second group is for conduit pipe, third group is for installation of lighting, fourth group is for installation of CCTV’s and fifth group is termination of lights and sockets.

-giving exact instructions to each group of men in my team and give assigned drawings for locations

-check drawings on which area assigned

-lay out and support conduit pipe, cable pulling,installation of lights,termination

-at the end of the day, gets progress in every assigned groups and submit daily reports

April 4,2013- July 31,2014

Industrial Electrician /Foreman –JONGHAP ELECTRICAL AND MECHANICAL CONSTRUCTION

CO.LTD Shuweihat S3 IPP, Independent Power Plant, Jebel

Dhana, Ruwais Abu Dhabi,UAE

-Pipe installation and cable tray

-Installation of terminator switch gear LV and MV cable,panel cabinet control,programmer logic control,local control panel,distribution control,motor operated value,small power lighting and socket power,motor control circuit, and building management system

-Installation of overload relay,safety switches,magnetic switches,circuit breakers,electric wiring and equipments using the approved methods

-Handling punch list team for clearing together with the QC and consultants

August 6,2008-September 15,2012

Electrician- AKTOR ALDARWISH ENGINEERING,JOINT VENTURE ADCCJV NDIA

NEW DOHA INTERNATIONAL AIRPORT,QATAR

-Installation of the following low current units such as:

a)access control panel for sensor card reader

b)fire alarm panel,smoke detector and module device

c)communication signaling devise and remote control system on auxlliary equipment

d)telephone communication

e)UPS panel board and substation setting panel and cable pulling

f)ducting sensor,dumper and temperature gauge

-installation of the following High Current units such as:

a)transfer primary power from one power to another

b)dismantling and assembling electrical installation

c)installation of building wiring and fitting,repair of lighting fixtures andelectrical panel outlets

d)lays underground conduit for electrical line and low voltage electrical line

e)lighting pole lay out and connection

f)cad weld cable grounding for earth rod

g)electrical protection system for lighting and grounding

-Installation of trunking and ladder to substation electrical room

March 4,2000-July 28,2008

Electrician/Building maintenance/Technician- A.SABAS SUAREZ REALTY/PIONEER SERVICE

CENTER,Galleria Fuente General Maxilom Ave.

Cebu, City,Phils.

-Building wiring

-Perform roughing-in activities for communication and distribution system

-Installation of signages

-Installation of sound system, an audio-video technician and other given tasks

-Serves as salesman for Pioneer appliances during mall exhibit

January 5,1995-March 4,2000

Electrician -CSD Electrical and Installation,Phase 3B Camella Homes,Talisay City

-Installation of wiring for buildings,lighting fixtures,sound systems,fire alarm,and cell sites

-Maintenance and repair of electrical machinery

-Troubleshooting and others

CHARACTER REFERENCES:

1)Erwin Apas

School Administrator

Yati Liloan Cebu

Contact number:094******** /094********

2)Sulpicio Leopardas

Contractor-Electrical

Sanchez Compound,Pandayan,Basak San Nicolas,Cebu,City

Contact number:+639********

3)Rev.Father Emeterio Bunao

Vice-President

San Sebastian College-Recoletos Manila

C.M Recto Ave.Quiapo Manila

(02)7348931

+639*********



Contact this candidate