David West Strachan
* ****** ******** ****: 013**-****** Elgin Mob: 079**-****** Moray Email: ***********@*****.***
IV30 5PY.
Rigging Supervisor
I am a dedicated, honest, enthusiastic professional with extensive offshore experience; quick to grasp new ideas, concepts and technologies when working in demanding environments. I can develop creative, innovative solutions to complex problems and demonstrate excellent understanding of Regulations and Procedures appropriate to the offshore industry. I possess excellent interpersonal and communication skills with the ability to assume responsibility as well as being an effective team player. I enjoy being successful in my field of work and thrive on passing on my knowledge and experience to others with whom I work. I am experienced in all aspects of Working at Height in conjunction with my profession as a Rigger.
I have over 16 years’ experience working in the Oil and Gas Industry, the Central and Northern North Sea on the UK Continental Shelf.
● Staff Supervision ● Construction Management ● Interpersonal
Communication ● Team Collaboration ● Administrative Controls ● Organisation and Planning ● Resource Allocation ● Troubleshooting ● Problem Solving
PROFESSIONAL EXPERIENCE AND SIGNIFICANT ACHIEVEMENTS
2018-Present
PDMS Energy Group
Offshore Rigging Supervisor/LOLER Focal Point
Brent Alpha Platform - Shell Decommissioning
Installation of new waste water bypass lines, Destruct of valves, actuators and any associated pipework, pipe supports
North Everest Platform-Chrysaor Load test Lifting beams and the removal of C8 seawater caisson, pipework, Valves and pipe supports
Enermech
Beryl Alpha-Apache
Change out of ropes on East and West Cranes
PDMS Energy Group
Offshore Rigging Supervisor/LOLER Focal Point
Rowan Viking - Jack up/Golden Eye Platform
Pre-works and Installation of bridge link between Rowan Viking and the Goldeneye Platform
Armada Platform - Chrysaor
Carried out swaging repairs/cleaning on Seawater caisson
Lomond Platform - Chrysaor
Removal of seawater caisson and other shutdown work scopes
2017-2018
Ninian North Platform - CNR Decommissioning
Initial survey for all rigging work scopes associated with the top sides removal preparations as part of the Ninian Northern platform decommissioning.
Responsible for the ordering of all rigging equipment required for the destruct work scopes and the compilation of all Lift plans for the removal of Risers, Caissons, SWLPs, Firewater pumps, Access Platforms, escape to sea ladders, Pipework, Valves, Actuators and Installation of dead weight supports, Leg stiffener supports and the installation of Shear plates on each of the eight legs of the jacket/MSF to interface with the heavy lift vessel. - Pioneering Spirit
2017
Amec Foster Wheeler
Scott Platform-Nexon
Various Shutdown Rigging Operations
KBM Resourcing
LOLER REP
EnQuest Producer (FPSO)- EnQuest
Did all lift plans and rigging work for Whittaker Engineering’s annual inspection and maintenance of the slip ring assemblies on the Turret MV.
Safe Boreas (Accommodation barge)
Assisted SALZER with the baring change out on the main thrusters
PDMS Energy Group
Offshore Rigging Supervisor/ LOLER Focal Point
Solan Platform-Premier Oil
Responsible for the compilation of all Lift plans, Risk Assessments and Method Statements and rigging permitry for both Platform and Construction Rigging Work scopes.
Tern Alpha-Taqa
Various Shutdown Rigging Operations
Amec Foster Wheeler
Gryphon Alpha (FPSO)-Maersk
Assisted the core crew construction team with the Installation of new components and re-routing of pipework on the Gas Compression Upgrade Package
2016-2017
Offshore Rigging Foreman
Montrose Platform, MAR Project (Hook Up)- Repsol Sinopec
●Attend daily planning and close out meetings with all other supervisors to discuss and organise planning issues, manning levels and productivity of the work force.
●Set out organizing permits and making up WCCs, TRAs etc.
●Liaising closely with other departments and teams to complete work scopes safely and on-time.
●Ensure that all activities are carried out in a safe and efficient manner to comply with statutory and client requirement and in compliance with company matrices.
Petrofac
2014 - 2016
Core Crew LOLER Focal Point/ Rigging supervisor
Britannia Platform- Conoco Phillips
Responsible for all platform rigging work scopes, and the compilation of all Lifting Plans, Method statements and drawings for complex, Standard and basic lifts, Task Risk Assessment, TRIC, Rigging Loft Management, Colour Coding and Certification of all Lifting Gear and keeping all records up to date. Regular loft audits and the ordering of all rigging gear for Platform work scopes
Amec Foster Wheeler
2012 – 2014
Core Crew Construction Rigging Charge Hand
Britannia Platform- Conoco Phillips Worked as part of the Core Construction Team, did all the construction lift plans, Construction rigging work scopes and ordered all the rigging gear for all construction work scopes on the platform,
Bis Salamis
2005 – 2012
BIS Salamis OPITO stage 4 Charge Hand Rigger 2009 – 2012
Rope access rigger OPITO stages 3 / 4 2005 – 2009
(Various Platforms)
Brae Alpha PGU Project Installation of new 350-ton power generator
East Brae Devenick Project New 800-ton chemical injection module
Britannia Platform Brit stats Project (2005, 2006, 2007 phases)
Beryl Alpha Removal of runway beams and heat shield on Flare Bridge
Piper Bravo Worked on John Brown engine
Janice Jacking and removal of hatches in ballast tanks
Brent Charlie Installation of Piggyback clamps on Risers
Brent Bravo Installation of new exhaust for HVAC system
North Cormorant Caisson inspection work scope
Brae Alpha Installing of new escape to sea ladders
BP Claire Assisting Q-Serve Rigging Operations
East Brae Installation of new heat shields on the Derrick
Claymore/ETAP/Andrew/Forties Charlie/ Brae Bravo - Various Shutdown Rigging Operations
John Gibbins and Sons
2002 – 2005
Construction Rigger
St Fergus Gas Terminal- Goldeneye Project
Working as a part of a team on the Construction and Civil work scopes
Deep Sea Trawlerman
1988 -2002
Prior to moving to the Offshore Oil and Gas Environment, I served aboard various deep-sea trawlers in the fishing industry, where i learned to splice wires and ropes; it also gave me a lot of experience in rigging prior to going offshore
PROFESSIONAL DEVELOPMENT
LOLER Competent Person Assessment Faulk Training Centre
Expiry - 20/12/20
LOLER Supervisor Training EnerMech Training Centre
03/06/13 > 04/06/13
OPITO Rigger Competence Stage 4 EnerMech Training Centre
Expiry - 11/10/19
Rigging Loft Management Sparrows training centre
26/11/12 > 27/11/12
Working at height for Supervisors Unit 4 Aqua-Terra Training Centre
Expiry - 21/04/19
Confined Space Entry Aqua-terra Training Centre
Expiry - 13/04/20
Further offshore emergency training Petrofac Training Centre
Expiry - 24/02/22
MIST (Minimum Industry Safety Training)
Expiry - 07/04/22
REFERENCES AVAILABLE UPON REQUEST