HARSH PATEL *********@****.***.*** 312-***-**** Chicago, IL

Summary

Around 2 years of experience in Construction as an Assistant Construction Inspector, Field Technician and assisted Site-Supervisor with skills in Cost Estimation, Planning and Scheduling, Quality Control and Management. Master of Engineering, Construction Management & Engineering. Aug 2018- May 2020 (Expected) Illinois Institute of Technology, Chicago, IL

Courses: Cost Estimation, Lean Construction, Economic Decision Analysis, Construction Planning & Scheduling, Contract Admin, Equipment management

Bachelor of Engineering, Civil Engineering June 2013- May-2017 Gujarat Technological University, Gujarat, India

Courses: Infrastructure Management, Professional Practice & Valuation, Building & Town Planning, Design of Concrete & Steel Structure, Structural Analysis

Professional Experience

Assistant Construction Inspector June 2017-July 2018 Green Design & Engineering Services PVT. LTD, India

• Inspected construction method, construction material and documentation for the project.

• Examined reinforcement of structure according to drawings and specification.

• Monitored usage of materials on daily basis for five construction unit of sewage treatment plant.

• Coordinated with Surat Municipal Corporation staff, subcontractor and GC and keep them updated about the project.

• Examined work done, according to line item and submitting for payment. Assistant Civil Engineer Intern

BLU Group Construction PVT. LTD, India May 2016-January 2017

• Managed, monitored and interpreted the contract design documents supplied by the client.

• Liaised with consultants, contractors, supervisors, surveyors and the general work force involved.

• Acted as a technical adviser on a construction site for contractors, labors and operators.

• Supervised and monitored the site labor force and the work of sub-contractors.

• Communicated with clients organized the project works and site facilities to meet the deadlines Site-Supervisor Intern January 2016-March 2016

Sarthak Developers PVT.LTD, India

• Performed quantity take-offs for construction work.

• Prepared Project Planning, Scheduling and Change Order Management.

• Integrated Field Operations on the site and inspected safety conditions at workplace.

• Ordered post-required material and maintained relation with all engaged stakeholders. Academic Projects

Cost Estimation of Medical clinic, Tennessee September 2018- December 2018

• Quantity Take-off was performed using RS Means and Blue-beam Software.

• Project has four phase such as mechanical estimation, electrical estimation, site work and civil work.

• Total estimated cost of project was around $6M

Construction Scheduling of 53rd and Cornell Residential using Primavera P6 September 2018- December 2018

• Worked in a team of two people to create Work Breakdown Structure for building construction.

• Developed sequence of activities for pre-construction phase, mobilization, sub-structure and super-structure.

• Derived schedule duration based on estimated quantity of work. Technical Skills

Estimating Software: Blue- Beam, REVU, RS Means construction cost estimating data. Project Management Software: Primavera P6, Microsoft Project ON screen take- off.