Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Jeddah, Makkah Region, Saudi Arabia
Posted:
November 24, 2018

Contact this candidate

Resume:

SAJID ALI

PERSONAL INFO

Father’s Name : Mukhtar Ali Siddiqi (Late)

Date of Birth : 20th May, 1988

Mobile No : +966-***-***-***

E mail : ac7r7x@r.postjobfree.com

: ac7r7x@r.postjobfree.com

Nationality : Pakistani

Driving License : Valid KSA

IQAMA : Transferable

ACADEMIC QUALIFICATION

B. Sc Electrical Engineering – 2011 (1st Division) Institution: CECOS University of IT & Emerging Sciences, Peshawar KPK, Pakistan. PROFESSIONAL AFFILIATION

Pakistan Engineering Council (PEC) as a Registered Electrical Engineer having Registration # ELECT/ 34898.

Saudi Council of Engineers (SCE) Registration with Saudi council of Engineers as an Electrical Engineer Registration # 395529.

PROFESSIONAL WORK EXPERIENCE (6+ Years):

SUMMARY

Have an experience for the installation of switchgear & substation construction. Having knowledge of power utilities standards, practices and technical requirements for preparation of scope of work, conceptual drawings and documents along with project key milestones. Establishment of project control procedures, work scheduling and progress evaluation. Summarized professional experience over the last 6 years, in reverse chronological order Indicating particular technical experience.

Kingdom of Saudi Arabia Experience [From 10 5 2012 to till date]

(YMAAZE)

As an Electrical Testing Commissioning & Protection Engineer Responsibilities: Testing and commissioning & Installation of Transformers 33 KV & 13.8 KV Switch gears of SIEMENS & All Protection, Control, Communication, & Alarms Panels installations

Project Name : Construction of 33/13.8 KV Substation JADLAN AL-BAHA.

(22, Nov -2017 Till date)

: Client: SEC Main Contractor: SIEMENS

Project position : Project Engineer (Electrical)

Responsibilities :

Supervision of Construction/Installation of Substation as Per Project Requirements and client standard.

Supervision of installation of switch gears & protection as per drawing.

Project scheduling and management.

Preparing daily & monthly progress reports for electrical works.

Documentation controlling and dealing with client personals i.e RFI, NCR etc PTW/LOA.

Equipments Installation and testing.

Installation and complete testing, commissioning of 30MVA 3 Power Transformers.

Installation, Testing & commissioning of 33kV SWGR 8DA10 SIEMENS.

Installation, Testing & commissioning of 13.8 kV SWGR NX PLUS C SIEMENS.

Installation supervision of control and power cable ladder.

Installation, Testing of complete station earthling.

Installation, Testing & Commissioning of Battery Chargers & Battery Banks.

Installation Testing & Commissioning of ACDB & DCDB panels.

All Switchgear Testing including CB, CT,VT, Aux & Protection Relays, Bus bars, Hi-pot.

Protection Relays Testing of SIEMENS, ABB, ALSTOM, Schneider.

Medium voltage Cable Hi-Pot Testing & Termination.

Supervision & Installation of Power Transformers & Auxiliary Transformers.

SAS System Panels Installation & Fiber Optic Cable Pulling & Testing.

Installation Testing Commissioning of AVR /RTCC, ABTS Scheme Testing.

Installation Testing Commissioning of Metering Panels. Project Name : Construction of Waad Al – Shammal ISCC Power Plant.

: Client: SEC Main Contractor: GE & ABENER

Project position : Testing Engineer (Electrical)

Responsibilities :

All testing as per Client and Contractor Requirements.

Testing of MV Distribution Transformers

Ratio Test

Winding Resistance Test

Insulation Resistance Test.

Gauge & Alarms Test.

TF CT Testing

Testing of MV Circuit Breakers of ABB VD4.

Contact Resistance Test

Insulation Resistance Test

Integrity Test

Testing Of CT’s

Ratio Test

Polarity Test

Winding resistance Test

Saturation voltage (knee point) Test.

Burden Test.

Insulation Resistance Test.

Testing of VTs

Ratio Test

Polarity Test

Winding resistance Test

Insulation Resistance Test.

Testing of Isolation Transformers & Excitation Transformers.

Testing of Main GCB CTs & VTs.

Project Name : Construction of New Qarah 33/13.8 kV Substation (SEC) Sakaka AL-Jouf. (14-08-2016 to 20.08.2017)

: Client: SEC Main Contractor: SIEMENS

Project position : Site Engineer (Electrical)

Responsibilities:

Supervision of Construction/Installation of Substation as Per Project Requirements and client standard.

Supervision of installation of switch gears & protection as per drawing.

Project scheduling and management.

Preparing daily & monthly progress reports for electrical works.

Documentation controlling and dealing with client personals i.e RFI, NCR etc PTW/LOA.

Equipments Installation and testing.

Installation and complete testing, commissioning of 30MVA 3 Power Transformers.

Installation, Testing & commissioning of 33kV SWGR 8DA10.

Installation, Testing & commissioning of 13.8 kV SWGR 8BK20.

Installation/ supervision of control and power cable ladder.

Installation, Testing of complete station earthling.

Installation, Testing & commissioning of 5.208 MVAR Capacitor Banks.

Installation, Testing & Commissioning of Battery Chargers & Battery Banks.

Installation, Testing & commissioning of DFR, SOE, SCADA, Line Protection, Transformer Protection, Bus Bar protection, Alarm Panel (Annunciater), ABTS, ACCS and Control Panels.

Installation Testing & Commissioning of ACDB & DCDB panels.

All Switchgear Testing including CB, CT,VT, Aux & Protection Relays, Bus bars, Hi-pot.

Relay Testing Siemens, Areva, SEL, ABB etc.

Medium voltage Cable Hi-Pot Testing & Termination.

Supervision & Installation of Power Transformers & Auxiliary Transformers. Project Name : Construction of 33/13.8 kv Substation Lajwan (Abha).

(22-02-2016 to 29-07-2016)

: Client: SEC Main Contractor: SIEMENS

Project position : Site Electrical Engineer

Responsibilities

Construction/Installation of Substation as Per Project Requirements and client standard.

Supervision of installation of switch gears & protection as per drawing.

Project scheduling and management.

Preparing Daily & Monthly Progress Reports for Electrical works.

Documentation Controlling and Dealing with Clients Personals.

Equipments Installation and testing.

Installation and testing of power Transformers.

Installation/ supervision of control and power cable ladder.

Installation supervision of complete station earthling. Project Name : 110/13.8 KV S.S replacement of University -1 MAKKAH

: Client: SEC Main Contractor: SIEMENS

Project position : Electrical Engineer

Responsibilities:

Supervision of installation of switch gears & protection as per drawing.

Project scheduling and management.

Preparing Daily & Monthly Progress Reports for Electrical Works.

Documentation Controlling and Dealing with Clients Personals.

Testing of Circuit Breakers of 8BK20 SWGR.

Complete Testing Switch gear

Components as CTs, CBs, Auxiliary relays and Protection relays.

Insulation Testing of Bus bars, CBs, CTs,

Bus bar stability Tests.

Contact Resistance Test of CBs and Bus bars

High Voltage Tests of Bus bars.

Transformer Installation and testing

Manage Control cable scheduling and Termination

Project Name : 33 /13.8 KV S.S HHR RABIGH.

: Client: SEC Main Contractor: SIEMENS

Project position : Electrical Engineer

Responsibilities:

Supervision of Construction/Installation of Substation as Per Project Requirements and client standard.

Supervision of installation of switch gears & protection as per drawing.

Project scheduling and management.

Testing of Circuit Breakers of 8DA10 & 8BK20 SWGR.

Complete Testing Switch gear

Components as CTs, CBs, Auxiliary relays and protection relays.

Insulation Testing of Bus bars, CBs, CTs,

Transformer Installation and testing

Manage Control cable scheduling and Termination. Project Name : 110/33KV S.S Extension of UMLUG.

: Client: SEC Main Contractor: SIEMENS

Project position : Electrical Engineer

Responsibilities:

Supervision of Installation of Substation as Per Project Requirements and client standard.

Supervision of installation of switch gears & protection as per drawing.

Project scheduling and management.

Testing of Circuit Breakers of 8DA10 33 kv.

Components as CTs, CBs, Auxiliary relays and protection relays.

Contact Resistance Test of CBs and Bus bars

High Voltage Tests of Bus bars.

Manage Control cable scheduling and Termination. Project Name : 33 KV Switchgear Installation Al-Quz Project position : Electrical Engineer

Supervision and installation of 33 kv 8DA10 switchgear.

Installation of Busduct.

Vacuuming and SF6 filling.

Contact resistance testing of switchgear.

WAPDA (Hydel Power Station Warsak ), Peshawar Pakistan [From 10 01 2012 to 09 03 2012]

Electrical system of Warsak Power station.

AC Generator, DC Generator & Permanent Magnet Generator (PMG).

Detailed study of 132kV Switch Yard.

Detailed study of / observation of Electrical equipments and related accessories(i.e. Power T/F,CTs, PTs, Circuit Breakers & switches ) installed in Warsak Hydel Power Station .

Protection of all electrical accessories.

Operation & Maintenance.

Internship Pakistan Telecommunication Company Limited (PTCL), Peshawar Pakistan

[21 08 2011 to 03 01 2012]

Training on Various Communication Equipments & Cables Installed in the Switching Station & WLL, OMC & Operation i.e. Microwave Transmission & Power Systems. FIELD OF INTEREST

Power System Protection.

Power Cable Lying, Jointing & Terminations, Testing & Commissioning. COMPUTER SKILLS

Micro Soft Office (Word, Excel, Power Point)

Auto CAD (Basics).

Internet Use.

Presentation Skills, Team work management and Good communication skills. EXTRA CURRICULAR ACTIVITIES / SPORTS

Reading Books of Literature & Newspaper etc.

Playing Cricket, Football.

REFERENCES/TRANSCRIPTS

Will be furnished upon request.



Contact this candidate