Resume

Sign in

Quality Project

Location:
Villupuram, Tamil Nadu, India
Salary:
KD:900.000+food& accommodation)
Posted:
November 11, 2018

Contact this candidate

Resume:

ARUMUGAM.VE VELLAMUTHU Job Function: Quality control & Other,

QA/QC-Lead Inspector Mechanical Engineering,

+91-949******* Manufacturing & Production,

+91-948******* Oil & Gas, Pipe line, & Storage Tanks

Career Summary

I am Seeking for an exciting job in the field of Engineering where my knowledge and experience in the Oil & Gas, Petrochemical industry will be best utilized. through To seek a challenging position as a quality Inspector and construction Supervisor in a dynamic environment and desires to progress further in the same field and like to grow with the organization and prove to be an asset for its effective functioning and be a team player for the achievement of organizational Goal and Success. I am looking to work in an intellectual, friendly environment where I can augment my knowledge by learning new technologies and serve better.

SUMMARY: Overall Experience of 19 years 2 months in Fabrication & Erection of Steel piping/ pipe line At Oil & gas Field and I am Holding Diploma in Mechanical Engineering. I am having 16.4 Years abroad extensive experience in Engineering QA/QC, Construction in various oil & gas field. My last Experience with GS E&C Oman LPIC-3 Fahud and Adco Rumaith Shnayel facility Ph-III NEB location Refinary Externtion project. Kuwait Oil Company Pressure maintance plant (Effluent water plant).WPMP. Aramco gas plant Khursaniya.(Plant Processing Piping) Ruwais refinery to Habshan OGD II, 24"pipe line. (ADNOC) And Tank job. OGD II Habshan to Dubai Jabal Ali Port Export terminal (via Abu Dhabi) Pipe line. And Storage Tanks project Sudan pipe line Khartoum refinery to Port Sudan Export terminal 741 KM With Pump stations & Storage Tanks Project Chennai to Trichy-Madurai (CTMPL) India. Pipe line & Multi Oil Storage Tanks project And Oman, Dubai Fabrication & erection Job. Since May-1989. Comprehensive experience includes quality management information system (QMIS). I would like to improve my career in your esteemed organization.my ability to coordinate with available resources in innovative methodical way, Good communication skills with disciplined outlook and confidence that will provide value in any task assigned to me individually or in a team. Well Knowledge on QA/QC activities as a Lead Quality Control Inspection Team. Well knowledge of All Fabrication and Erection jobs.

Presently I am Hold of Welding Inspector Certified By TWI- CSWIP 3.1,and ASNT-Level-II.in RT, UT, MPT, DPT.with ISO-9001(2015) Lead adidtor.

Work Experience(India)

1.)Sr.Quality Inspector

ODHISA, Hyderabad India

Mar '12 - Feb '13 (11 Months)

C/O Bharath Quality Engineers Hyderabad. Designation: Sr.Quality Inspector Project: IOCL Refinery Project ODHISA –India

Clint: (ESSAR PROJECT Ltd) & Punj-Lloyd India Ltd IOCL Refinery (FOSTER WHEELER).

Responsibilities: Responsible for all inspections at site inclusive of witnessing, recording, reporting the results and resolving any problems arising. Review & Monitor detailed records/reports at all the pipe rack location. Witnessing, Monitoring and assuring the construction activities as per IOCL Approved code, IS standard international standards. Day to day reporting to unit supervisor for status of Job Progress. Witnessing of Calibrating testing Equipment. Issue non-conformance reports Implement FOSTER WHEELER approved Inspection and Test Plans, In-process Quality Control Checklists, Test Certificates, Reports & other Documents. Performing surveillance and entering proactive and violation after the fact in QMIS. Attending weekly progress and quality meetings. Reviewing and approving work procedures and quality plans.

2.) Name of company: JAIHIND PROJECTS PVT Ltd Ahmadabad- India (Via Bharath Quality Engineers Hyderabad) Designation: Lead QA/QC Inspector for (CAIRN projects)

Project: MANGALA PROCESSING UNIT Extension Tr-4

Period: March - 2010 to March-2012

Clint: CAIRN INDIA LTD

Responsibilities: Witnessing, Monitoring and assuring the construction activities as per CAIRN Approved code, & International standards. Performing surveillance and entering proactive and violation after the fact in QMIS. Attending weekly progress and quality meetings. Reviewing and approving work procedures and quality plans. Contractors works site. Testing & calibration of all type of instruments at calibration shop. Follow- up with Construction team to close out the NCRs issued by client.

3 .) Name of company: GERMANISCHER LLOYD Pvt Mumbai (Via Bharath quality Engineers - Hyderabad)

Designation: 3rd party Sr.QA/QC Inspector (L&T- CAIRN Pipe Line Projects)

Project: Barmer Salaya L&T CAIRN Pipeline.

Period: Oct-2008 to February-2010

Clint: CAIRN India Ltd. CAIRN INDIA LTD Laying first time in India SELF Heating Coil with 24 Inch dia Crude oil transportation by pipe line Oil transportation Status Controlled & Monitor by the OFC Cable-laid Controlled Each Pump station. 8 Gas line with Same Trench Controlled by Above ground station Installed Each 30 KM.

Responsibilities: Read the All Documents to under stand the Scope of Work, material, For the Cross Country Pipe line. Follow the Work project Specification, WPS, welding, & Method of statement For the Line Laying. Daily Meet with the Welder for Discussing To Improve the Welding status All Above documents CAIRN India must Approve for construction movements. Inspection As per RFI Date and Time Wise / Work Priority, Survey of ROW.As per Approved Drawing. Stringing As per the Approved Plan & Site Condition. Trenching As per the Approved Trenching Method Main line Weld joints inspection at the Time of welding. Daily Review the Welding Reports And Sign off. Proper RT Film interpretation To Know the Joints welding Status, with L&T Inspector. Witnessing the activity of Lower-in / Holyday testing at time of Lower-in, Tie-in Welding Inspection As per the Tie-in WPS. Reporting to Next process up to Hydro test Activity. Attend the Meeting For Inspectors, planning Team Leader & Other Higher Official. All Daily Activity Report Review & Sing off as per ITP.

ABROD WORK EXPERIENCE

4.) Name of company:GS E&C (Korea).

Designation: QA/QC Inspector Mechanical, Welding, Fire water Storage Tanks and NDT Activities.

Project: WPMP-WARA PROJECT-BURGAN OIL- FIELD – KUWAIT,ADCO Abudhabi -project, LPIC -3 Project-Fahud Oman

Period:May-2013 to July-2018

Clint: KUWAIT OIL COMPANY Kuwait,

ADCO Abudhabi-UAE,LPIC-3 OMAN,

GS E&C MNC Contractor Given The Responsible for me Toolbox Meeting with other Staff and Sub contractors Team members. Daily meet with the Welding foreman of subcontractor Discussing About Improve the Welding & Repair status. Instructing welders for improving welding Quality. Reporting Daily Shop Activity & Progress to Higher Authority. Requesting to Clint (Aram co/ Repetitive) daily inspection for the shop welding. Radiography/ NDT requesting for the Completed weld joint as per ITP. Co-ordinate with the RTFI For daily joints RT Film Status for further Movement. Monitor the Repair Status / Repair Welding As per Approved WPS. Daily Monitor PWHT Activity as per ITP. Reporting to Higher Authority Daily, Weekly, Monthly, Welders, progress, and Repair status. Co-ordinate with Talisman Inventory Up to Hydro teat Witnessing With KOC/Adco/Orpic Team members Inspector for the Spools, Tanks fabrication & Erection Spot Hydro Test at Shop Area & pipe rack location. To Release the spools for Painting / Erection and Final Commission.

5.) Name of company: Consolidated Contracting Company LLC (SAUDI Arabia)

Designation: QA/QC Inspector Mechanical, Welding, Ndt

Project: Khursaniya Gas plant SAUDI ARAMCO. Period: June-2006 to sept-2008

Clint: SAUDI ARAMCO LTD,The CCC Given the

Responsibilities: Daily attend the Safety Tool box Meeting with other Staff and Welding Team. Daily meet with the Welder for Discussing to Improve the Welding status. Monitor & Witnessing the Weld joints as per the Approved Drawing, Welding Procedure. Instructing welders for improving welding Quality. Reporting Daily Shop Activity & Progress to Higher Authority. Requesting to Clint (Aram co/ Repetitive) daily inspection for the shop welding. Radiography/ NDT requesting for the Completed weld joint as per ITP. Co-ordinate with the RTFI For daily joints RT Film Status for further Movement. Monitor the Repair Status / Repair Welding As per Approved WPS. Daily Monitor PWHT Activity as per ITP. Reporting to Higher Authority Daily, Weekly, Monthly, Welders, progress, and Repair status. Co-ordinate with Talisman Inventory Up to Hydro teat Witnessing With Aram co Inspector for the Spools, Spot Hydro Test at Shop Area. To Release the spools for Painting / Erection.

6.) Name of company: DODSAL GROUP DUBAI LLC (Sudan project)

Designation: QA/QC Inspector Welding & Ndt

Project: KHARTUM PORT SUDAN Pipe line .

Period: Jan 2005 to Nov 2005

Clint: SPPC - OVL- INDIA Ltd CEIL(3rd party) The Dodsal Company Given the Responsible to control the Whole document for Pipeline inspection reports until The Dozier document to SPPC-Sudan.My Duty started from Monitor the Transportation Status By OFC Cable / Sub-station / pump station. Total 842 KM. Responsibilities Daily attend the Safety Tool box Meeting with other Staff and site Welding Team. Co-coordinating Survey of ROW.As per SPPC / CEIL Approved Drawing. Monitor & Witnessing the Weld joints as per the SPPC Approved Drawing, Welding Procedure. Instructing welders for improving welding Quality. Reporting Daily SITE Activity & Progress to Higher Authority. Requesting to Clint SPPC / CEIL (OVL) daily inspection For the Site welding. Radiography/ NDT requesting for the Completed weld joint as per ITP. Co-ordinate with the RTFI For daily joints RT Film Status for further Movement. Monitor the Repair Status / Repair Welding As per Approved WPS. Witnessing the activity of Lower-in / Holyday testing at time of Lower-in. Tie-in Welding Inspection as per the Tie-in WPS. Reporting to Higher Authority Daily, Weekly, Monthly, Welders, progress, and Repair status. Co-ordinate with Pipe book Inventory Up to Hydro teat Achieved the Repair rate 2.2 % By Quality team in this Pipe line Total 842 KM

7.) Name of company: N.R.PATELL. Pvt. Ltd

Designation: QA/QC Co-Coordinator, Welding, Ndt

Project: CTMPL Pipe line ESSAR Period: Sep 2004 to Dec 2004

Clint: IOCL- EIL ESSAR

The ESSAR Pvt Ltd Company responsible for me 10 dia pipe line Transport the Multiple Oil .All Control & Monitor the Transportation Status by OFC Cable / Substation / pump station. N.R Patell Performed At Asanur Area to Trichy. SPREAD-B Responsibilities: Instructing welders for improving welding Quality. Reporting Daily SITE Activity & Progress to Higher Authority. Requesting to Clint ESSAR / EIL daily inspection For the Site welding. Radiography/ NDT requesting for the Completed weld joint as per ITP. Co-ordinate with the RTFI For daily joints RT Film Status for further Movement. Reporting to Higher Authority Daily.

8.) Name of company: NATIONAL STEEL FAB-LLC

Designation: QC-Co-coordinator & Fabrication Foreman Mud tank

Location: Ghala Work Fabrication shop. Muscat Oman Period: July- 2002 to Sept- 2004

Clint: NDSC - PDO / GPS Oman. Other The NSF LLC Company is one of the Leading Contracting Company in Oman, Fabrication & Erection of At Facility process RIG Facility located Area For NDSC, ESSAR (OMAN) MAIN PRODECT OF THIS COMPANY is SKID Fabrication, Elliptic TANK Fabrication & Erection for Transportation of oil/ Liquidation Material Tankers lorry, MUD TANKS with Skid mounted Fabrication & Erection at Skid, For Suitable to Transport the MUD Tanks Various Location of Rigs points, Storage tanks fabrication & Erection, Fabrication Cooling (cillers) Tower, Structural Works. Responsibilities Daily Reading the Approved Fabrication Drawing and Plan For the Collect the Raw material for fabrication, Instruct & Monitor the Fabricator For the Each Movements of Concern Drawing, Instructing welders for improving welding Quality. As per Quality Requirement. Reporting Daily Shop Activity & Progress to Higher Authority. Requesting to Quality Deportment daily inspection Stage wise. As per ITP Monitor the All Activity as per Drawing with Safe Mode, Co-ordinate the All Inventory daily updated For Next Process & Inspection Reports. Self-Driving With Shop Workers/ Site Worker for Daily Duty.

9.) Name of company: CCC- Abudhabi-UAE WLL

Designation: QC-Co-coordinator Pipe line

Project: Ruwais Habshan Pipe line (24dia): Abudhabi Dubai Port- Pipe line Project (24dia)

Period: January- 2000 to June- 2002

Clint: NPCC ADNOC - Bectol The NPCC- UAE Company Is the Main Contractor of the pipe line From Ruwais refinery to Habshan OGD II Refinery. And Same Line Reach to Dubai Jabal Ali

Port via Abudhabi Through 24dia crosses Country pipe line. The pipe line performed By Automatic Welding (Pay welding Machine) Controlled by Welder. Responsibilities: Daily Check the Front availability for the Welding. (Stringing status). Daily Self Driving With welder Team for the Main line welding. Tie in Welders. Follow the Welder to Complete the Joints as per Schedule/daily Plan. Approximately 65 to 80 Joints Completion as per Company plan.Wih 10 welder ( 5 set) Daily Progress Reporting To Higher Authority. Co-Ordinate with NDT- Team for Complete Radiography Activity as per daily Requested joints. Collect the welded Joints NDT Report daily from NDT Contractor to know the joints status.

10.) Name of company: EMIRATES TRADING AGENCY -WLL

Designation: Fabrication Foreman.Cum Quality coordinator.

Location: Dubai - UAE Period: May 1989 to May 1995

ETA- Company is a Leading Sub-Contracting company For Fabrication & Erection around the UAE. The Company Able to do the all type of Fabrication job. Like Storage Sheds, Petrol pumps with all Facilities, piping spools For Maintance. As per the Clint Requirements. Responsibilities: Daily Reading the Drawing and Explain to Fabricator. Instruct the Welder to perform as per Wps & Explain the Welding Position & Electrode detail. Also Control the Following Teams. Fabrication Of Piping, & Erection Tank structural type jobs, All type of Petrol pumps structural fabrication & Erection, Fabrication of Storage shed & Erection, Highway height limits Gantry. & all type of Sing Board Fabrication. Lift & Elevator ‘Frame support bracket Fabrication.

Education

Diploma Mechanical Engineering (passed out 1988).

Government Polytechnic institute, Calicut-Kerala-India

Jul '85 - Jun '88

Diploma in Mechanical Engineering.

Certifications & Licenses

TWI-UK-CSWIP 3.1 Certified Welding Inspector (Certificate Number: 68553)

Expiry date: 23-02-2022

IRTCA- ISO-9001(2015) Lead Auditor.

ASNT-Level-II Radiography Test

Magnetic Partical Test

Penetration Test

Ultrasonic Test

Advanced 7 to 8 Years7

I am Familiar with GTAW,SMAW,SAW,MIG Welding Technology & Radiography film interpretation.

And assembly technology for process plant piping, Storage Tanks & Pipe line crosses country.

Personnel detail:- Passport details:-

Name: ARUMUGAM VELLAMUTHU

Father's Name: K.Vellamuthu.

Mother’s Name: Menakshi Ammal

Nationality: Indian

Date of Birth: 05-May-1967.

Marital status: Married

Passport No.-P-5846790

Date of issue: 14th-DEC-2016-

Issued at: Chennai

Date of expire: 13rd-DEC-2026

UAE driving license:, 268406 valid up to 12-01-2018(Renewable)

Oman Licence : 110109191 until 07-08-2022

Indian LMV driving license. Until -2022.



Contact this candidate