Resume

Sign in

Engineer Electrical

Location:
Jaipur, Rajasthan, India
Posted:
November 10, 2018

Contact this candidate

Resume:

Rakesh gupta

Contact No: +91-908******* E-mail : ac7nsh@r.postjobfree.com

Objective

I am looking for to improve my skills further to my career growth and prospects to be

able to get an opportunity to be part of your esteemed organization.

Education

B.E., (Electrical Engineering) Under Rajasthan University,Jaipur, Rajasthan. Passed in year July 2003 with 67%.

Areas Of Exposure

Maintenance, Project management, Materials Management

Areas Of Interest

Maintenance of equipments, Installation & commissioning of machineries

Professional Experience

Organisation-III : M/s. ACC Concrete Limited

Duration : From Nov 07 to till date

Designation / Role : Area maintenance incharge

Organisation-II : M/s. Enercon India Limited

Duration : From Aug-2004 to Nov-07

Designation / Role : Engineer- Electrical/SAP

Organisation-I : M/s. Bhushan Steel & Strips ltd,Khopoli, Maharashtra

Duration : From Sep-2003 to fab-2004

Designation / Role : Tr. Engineer- Electrical

Professional Experiences-In Brief

M/s ACC Concrete Limited

Nov-2007 to till date

Mumbai. (www.accconcrete.com)

1).Incorporated on August 1, 1936 as the Associated Cement Companies Limited.

2).Started manufacturing of Portland Pozzolana Cement in 1965.

3).ACC starts the commercial manufacture of Ready Mixed Concrete at Mumbai in 1993.

4).Commissioned of the new plant of 2.6 MTPA capacity at Wadi, Karnataka plant, the largest in the country, and among the largest sized kilns in the world in 2001.

5).Holcim group of Switzerland enters strategic alliance with Ambuja Group by acquiring a majority stake in Ambuja Cements India Ltd. (ACIL) which at the time held 13.8 % of the total equity shares in ACC.

7).Ready mixed concrete business hived off to a new subsidiary called ACC Concrete Limited in 2008.

8) Acc concrete has been merged acc ltd now.

Roles and Responsibilities as an Area maintenance incharge:

1.Heading centralized maintenance team for 17 RMC plants in Mumbai region.

2.Execution of maintenance related to RMC Plant Make SCHWING STETTER (CP 30,M1,M2,H2N),SIMEM MSO 4500,MSO3000 using latest technology of Command alkon & IDS.

3.Schedule Planning day wise maintenance for DG, Plant & electrical panel.

4.Communication with plant in charges & batchers for daily checks for plant as well DG.

5.Follow ups from vendors for material requirements.

6.Preparing maintenance schedule for DG, transformer, LT switchgear, Air compressors, hydraulic systems etc.

7.Fault finding during commissioning of plant & rectifying these problems on priority.

8.Ability to instruct and implement drawings and wiring / circuit diagrams.

9.Understanding of various electrical drawings.

10.Man power planning for execution of plant maintenance activities.

11.Weekly & monthly report preparation.

12.Budget preparation for raw material and spares.

13.Preparing BOQ for Scheduled maintenances.

M/s Enercon India Limited

Aug-2004 to Nov-2007

Mumbai. (www.enerconindia.net)

1). ENERCON GmbH has its global slogan ENERGY FOR THE WORLD. It launched its operations in India in the year 1994 with the formation of its subsidiary ENERCON (INDIA) LIMITED.

2). EIL is an ISO 9001 - 2000, joint venture between foreign promoter Enercon GmbH, the German market leader in wind turbines & Mehra Group, India. With a share holding position of 56% and 44% respectively. Enercon GmbH the parent company established in 1984, a global technology leader in the wind energy sector has a wind turbine installations worldwide aggregate to 4600MW of installed capacity of wind energy converters in operation.

3). Enercon has been in India for the last ten years and has quickly established as the technology leader, installed over 1500 WECs all over India with total installed capacity exceeding 1600 MW.

4). Enercon India is ISO-9001-2000 Certified for manufacturing, installation and services. It is supported with the latest design and development from its Principals, Enercon GmbH.

Roles and Responsibilities as an Engineer-Electrical:

Co-ordination with Project Office for scheduling the Electrical activities.

Co-ordination with Project Office to get Field drawing & for surveying and for line works.

Co-ordination with Contractors to achieve the target in scheduled time.

Erection, testing and commissioning of 33 KV, 22 KV and 11 KV, 950 KVA, 700 KVA and 400 KVA Transformers for Wind electric generators.

Erection, testing and commissioning of 33 KV, 22 KV and 11 KV Over Head Lines.

Co-ordination with Electricity Board and Electrical inspectorate officials for commissioning of Wind electric generators.

Verification and certification of Electrical contractor materials & Bills

Inspection of materials on receipt at site.

Co-coordinating with project office, contractor and team members for completion of Wind Electric Generators with in the scheduled time.

Roles and Responsibilities as an Engineer-SAP:

Creation of service Masters for vendors (Cranes & Trailers)

Issue of materials to Network /Reservation.

Activity Confirmation/Updating Remarks for Customers/Milestone Confirmation.

Monitoring Stock Transfer.

Outbound Delivery creation. Post Goods Issue and Serial Number checking.

Creation Of Defect Reports and their follow-ups.

Physical Inventory

Coordinating and supporting end users to solve the errors in SAP-MM transactions who are located in different Installation sites.

Coordinating with various departments, viz: FI/CO, QM and PS for all SAP related queries.

M/s Bhushan Steels & strips ltd.

Sep2003 to fab-2004

Khopoli, Maharashtra.

Bhushan steels & strips is steel manufacturing company. Company is dealing in manufacturing of both hot and cold types of steel coils for different types of customers.

It is also setting a hot rolled plant. It has a turn over more than 1600 cores.

Roles and Responsibilities as an Tr. Engineer-Electrical:

Daily Planning for Production Vs Maintenance to achieve the target with our co-employees.

Operation and Maintenance of Hot rolled slitter & pickling line.

Personal.

Father’s Name LATE SHRI GIRRAJ PRASAD GUPTA

Date of Birth 05th JANURAY 1980

Sex Male

Language Known English, Hindi,

Marital Status Married

Permanent Address Rakesh Gupta

Flat no 715, Tower no 1

Apna ghar shamimar ext.

Apna ghar shalimar

Alwar( Rajasthan) 301001

Correspondence address Flat no 702, Building no 4,

Parijat garden housing society, Behind

Prashavanath Engg collage,

Kasarvadavali,Thane(w) -600015

Current location Mumbai

Notice period 60days

Current CTC 14.20 lacs

All the above-furnished details are correct and true to the best of my Knowledge & belief.

Date: Yours Sincerely,

Place: Thane Rakesh gupta



Contact this candidate