B.Tech (Civil Engineering) Graduated, June ****
Beehive college of engineering & technology (UTU) Marks 71%
AICTE approved Division 1
Dehradun, Uttarakhand
12th December 2011
Govt. Boys Higher Secondary, Batamaloo Marks 62%
J&K state Board of School Education Division 1
Srinagar, J&K
10th December 2009 Govt. Boys High School, Takanwaripora Marks 55% J&K Board of School Education Division 2 Srinagar,J&K
To work in liberal and professional environment where I will be offered the opportunity to apply problem solving and leadership skills. Able to work as an individual as a part of team. I am capable of handling pressure and seeks to work in an environment with right kind of pressure to allow the full development of already learnt skills.
May 2016 – Current
Site Engineer /quality and maintance engineer working in organization in our KRCL Tunnel project sangaldan Dist. Ramban J and K was supervising the works like construction of Roads Retaining /Brest walls . Earth cuttings etc..
AFCONS Infrastructure Ltd
Andheri(W), Mumbai
Construction of Roads and tunnel project. Jammu and Kashmir railwaylink in tunnel 47P which 10km long
Under the client of konkon railways corporation limited. under the pack afcon infrastructure limted.
Construction of Retaining walls
Railways tunnel works in T 47 Park under the client of Northern railways and kon konkon railways corporation limited
V Construction
Testing of soil
To check the maintenance and control of material
To check the consistency. And compressive strength of material
Progress of construction creating a generally sometimes
Perform and coordinate inspection and determine quality assurance testing model of raw material and finished products
Worked as civil engineer In gammon engineers and contract. Limited in Jammu and Kashmir Railway link which connects Jammu Srinagar under the client of ircon international ltd. Working as a site engineer in gammon which was 10.30 km from dharam sangaldan Jammu and Kashmir which open at sumboor dharam khund… this railway link connect the two section ramban banihal section… which is based upon NATM ( New Australian tunnel method)
Word 2010
Excel 2010
Power Point 2010
Auto CAD
Web Designing
Stad pro
English
Hindi
Urdu
Kashmiri
Reading
Playing cricket
Playing carrom
Listening music
Father’s Name: Mr. Nazir Ahmad Dar Marital Status: Single
Birthday: September 16, 1992 Nationality: Indian
Gender: Male
Declaration
I, Adil Nazir, hereby declare that the information contained here in is true and correct to the best of my knowledge and belief.
Adil Nazir Srinagar, J&K
January 1, 2018
ADIL NAZIR
Civil Engineer
WORK EXPERIENCE
2 & Years
ABOUT ME
I am a simple guy with good attitude. I always try my level best to achieve the goals in earliest possible time. I am having good team spirit and workmanship skills. Being a good listener is my strength.
AGE
25 years