Resume

Sign in

Engineer Civil

Location:
Karachi, Sindh, Pakistan
Posted:
October 12, 2018

Contact this candidate

Resume:

Personal Information:

Name: Abdullah Qadir S/O Ghulam Qadir

Address: R/68 gulzar-e-ibrahim malir halt karachi

Mobile: +92-336*******/031********

E-Mail Address: ac7c04@r.postjobfree.com

CAREER OBJECTIVE:

To get a growth oriented, competitive and challenging position in a leading and dynamic environment to enhance my Skills with prospects of better career and personal development in the field of Software developer/Telecom/Civil & power Engineering, Quality, Project Monitoring, and Implementation.

KEY SKILLS:

Coordinating the performance of Construction Works and Site Design and to ensure that the sites. are built as per roll-out plan and in accordance with the Project specifications and Quality .Standards.

Good Technical aptitude and excellent Civil Engineering Skills.

Ability to work independently in a fast paced and challenging environment.

Knowledge in Cell Sites Construction (GSM Project, Engineering and Project iplementation).

Knowledge in Outside Plant Construction.(Forecasting, Design of fiber optic projects).

Knowledge about E&M like Site configuration,Ip address config check site in on air on Netco and checked alarms cleared, A/C,Rectifier,battery charger troubleshooting.

Using ADO.NET, ASP.NET, C# etc as front end and Access, SQL Server as back end website development.

.

EDUCATIONAL BACKGROUND:

B.Tech (Electrical)

Institute of Higher Education Karachi (1st Div).

D.A.E (Electrical)

Government Technical Institute Hyderabad (1st Div).

(ACCP) Software engineering Program

Aptech Institute worldwide sharah-e-faisal center Karachi.

EMPLOYMENT RECORD:

Company & Position:

Huawei Technologies

Project (USF khuzdar )

Balouchistan, Pakistan

Site service Engineer

Dec-2016 to march-2018

Responsibilities:

Preparation of Technical Site Surveys

Supervision and Checking of Construction Drawings

Interfacing and Coordinating with the Client and Subcontractor regarding construction matters i.e. scheduling and specifications.

Preparation of Site Folders (Documents/ Test Results) for Site Acceptance.

Coordinating with soil testing and detailed design consulting companies.

Coordinating with Telecom Deployment department on ready for telecom installation sites and other extra works which needed civil works action.

Preparing the Civil works reports for the weekly

Coordinating with RAN (Radio Access Network) for the issuance of SAF (Site Acceptance Form).

Participating in solving problematic sites in site acquisition and civil works aspects in order to deliver the project to the customer on time and ATP pre ATP Audit with customer.

Company & Position:

Huawei Technologies

Mobily Project (USF 7/8) Buraidah Al-Qasim KSA

Civil Engineer

May-2014 to Dec-2015

Responsibilities:

• Coordinate with SAQ team to acquire new sites.

• Conduct technical site survey (including structural, engineering and power surveys).

• Prepare the Technical Site Survey Report (TSSR) including engineering drawings.

•Propose the suitable structure to be used in each site depend on site conditions.

•Reviewing and approving the design drawings before submitting to the client.

•Preparing Project Implementation Plan (PIP).

•Preparing Method of Statement and coordinate with HSE team to prepare Risk .

Assessment.

•Prepare and approve material requisition form for any material request.

•Supervision of all implementation works for both Rooftop and Greenfield sites (RDS, Monopoles,.

•Self-Support Towers, COW and Camouflage Solutions).

•Leading a team of engineering design, civil implementation, electricians, riggers and supervisors.

•Solving problems that may happen during the implementation of sites.

•Perform tower verticality & torque inspection and concrete tests.

•Perform site inspection for existing sites that having problems and prepare report.

•Preparation of work progress reports and attending all meetings with operator's.

•representatives to discuss work progress & project implementation schedule.

•Preparation of SNAG Clearance Report after completion of SNAG rectification.

•Prepare Site Folder including site As-built to submit it to the client.

•Ensure site readiness for acceptance and attending site acceptance visit.

Company & Position:

B.I.H. CONTRACTING ORGANISATION,

Al-Khobar, KSA.

Project Engineer

April-2013 to may-2014

Responseblities:

•Site supervision and quality control for implementation of GSM turnkey green field and rooftop sites.

•Leading site acquisition teams, conduct RF initial & final surveys, prepare the SSR

including all AutoCAD drawings.

•Calculation of Steel Rebar for each site as per foundation generic drawing.

•Responsible for all project records, documentation filing & retrieval and preparation of all documents (e.g., PAT, PAC, OCC).

•Attending of civil & telecom PAT and ensure the readiness of the site.

•Reviewing civil & electrical drawings (Design) and checking the BOQ quantities.

•Putting the project implementation schedule, review plan & specification before site

implementation and arranging material mobilization.

•Implementation of overall engineering plan and perform site inspection (Civil, electrical and electromechanical).

•Ensure that all work stages are done according to the approved drawing design.

•Conduct Slump test and check concrete temperature on site.

•Preparation of all requested achievement reports and attending all meetings with

operator's representatives to discuss work progress and project implementation

schedule.

•Implementation and supervision of all electrical works (e.g., configuration &

troubleshooting of generators & ATS panels, provide sites with permanent power, etc.).

•Follow up all technical and onsite support requests coming from both operators and

vendors and steer them through the right process to guarantee operator’s

satisfaction and obtain service acceptance.

•Overseeing telecom works including installation of antennas and feeders.

•I have completed more than 75 GSM sites (New Implementation, Dismantling and

permanent power connection) & successfully HO to operators.

Company & Position:

Junior Software Engineer Chiniot General Hospital

Korangi, Karachi, Pakistan

Aug 2012 To Feb 2013

Responsibilities:

•Using ADO.NET, ASP.NET, C# etc as front end and Access, SQL Server as back end

Software analysis, code analysis, requirements analysis, software review,

Identification of code metrics, system risk analysis, software reliability analysis.

•Object-oriented Design and Analysis Software modeling and simulation.

•Front end graphical user interface design.

•Software testing and quality assurance.

•Performance tuning, improvement, balancing, usability, automation.

Support, maintain and document software functionality.

•Integrate software with existing systems.

•Evaluate and identify new technologies for implementation.

•Implement localization or globalization of software.

Company & Position:

Assistant Programmer Al_Abbas Fabrics Site area

Karachi Pakistan

2012 To Aug 2012

Responsibilities:

•Using ASP.NET, C# etc as front end and MS Access, SQL Server as back end.

•Analyzed, Designed and Developed " Ship Breaking Inventory Control System."

•Analyzed, Designed and Developed " Integrated GLS Of Ship Breaking Inventory

control System"

•Analyzed, Designed and Developing "Complete Web Base HRM System"

•Analyzed, Designed and Developing "Integrated Payroll Of Web Base HRM System"

•Developing Systems For Al-Abbas Fabrics (ERP), Al-Abbas Export (MIS), Al-Abbas

Garments(MIS)

Company & Position:

Industrial Panel Winder Arriva T&D Switchgear Company

Shershah, Karachi, Pakistan

July 2005 To Dec 2009

Responsibilities:

•Installing and testing all sized power/control pannels

•KWH meters,Terminals,Breakers,Earth fault relays,Current/Potential Transformers

Bus-bars etc

•Assembled all sized power/control pannels and switch gear pannel for small/large

size of Two or three door industries pannels followed by drawing

Company & Position:

Sub. Engineer Karachi Electric Supply Corporation

Karachi, Pakistan.

Feb 2004 to July 2005

Responsibilities:

•Routed high voltage from mainline (11KV to 440volts) to consumer

•Shifted Energy meters

•Proper storage of supplied material

•Issued material to outdoor teams

•Proper filing of all items

•Created new connections for new customers

•Prepared detailed site reports

•Coordinated with other teams

•Attended to faults reported

REFERENCE:

•Will be provided on request.



Contact this candidate