Post Job Free

Resume

Sign in

Maintenance Technician Project

Location:
Gilbert, AZ
Posted:
October 08, 2018

Contact this candidate

Resume:

Michael A. Bilyeu

**** * ******** ****** ac7bmy@r.postjobfree.com

Gilbert AZ 85295

602-***-****

Career Objective:

To secure a position as an Install Project Leader that will utilize my experience and skills in project management, planning, execution, team building, improving efficiency of operations, and effective reporting methods.

Employment:

ASML 5-97-Present

Positions held:

Project leader – June 97 to Dec 16

Group leader for PLs – April 08 to Aug 12

US install manager – Oct 15 to Dec 16

Group leader for install engineers – Dec 16 - present

Led the planning and execution of pre-installation, construction, installations and relocation of photolithography systems to ensure that customer expectations are met.

Crate and delivery time line and manage they are met, using MS Project.

Work with customers on site surveys, facilities reviews, design packages, and layout drawings using AutoCad.

Ordering of peripheral equipment, materials, system move-in scenarios, and organizing third party manpower using project management skills.

Manage customer delivery of high purity piping, water, gases, ducting, electrical, and special equipment.

Managed delivery of complex photolithography systems. Ensured correct assembly, power up, and installation.

Resourced and contracted third party labor support.

On US team to roll out a company wide craftsmanship quality initiative

Drive install engineers team growth, development, quality, safety and training.

Created and managed company wide relocation quote calculator. Determine cost related to moves, labor rates, and margins.

Managed and coordinate manpower for the US install and relocation team. Insured all projects where staffed correctly and daily coordination.

Managed multiple customer install ramps and coordinated the largest of these delivering 25 systems over a 4 month period. Have been part of managing over 500 system installs or re-locations.

Hired and trained multiple install project leads.

Involved with design of special tooling and procedures needed to deliver/re-locations of systems

Intel – Chandler AZ 3/97-5/97

Equipment Technician

Work with Engineering on upgrades and qualifications of new and existing equipment

Experience working with multiple types of photolithography systems.

Motorola – Mesa AZ 3/93-3/97

Maintenance Technician II

Repair and maintain Photolithography and Metrology equipment.

Work with engineering, contractors, and vendors on running facilities and installation of new equipment during start up phase at Com1.

Author equipment maintenance specs.

Train and assist new technicians on all related equipment.

Experience working & training on GCA, Ultratech, Canon, Opal SEMs, KLA, SVG tracks, Prometrix, Atcor, and Tencor systems.

GCA Corporation – Orlando FL and Phoenix AZ 8/88-1/93

Field Service Engineer

Install, upgrade, troubleshoot, repair and maintain Photolithography equipment.

Responsible for customer relations.

Participate in two fab ramps.

Work on a team to integrate maintenance manuals into an interactive computer format.

Education:

DeVry Institute of Technology Kansas City, MO

Associate of Applied Science in Electronics 3.64/400

Presidential Honor Society (all terms)



Contact this candidate