SYED RAZA HUSSAIN SHAH

House # L** A Gulshan –e- Malir Karachi

Email: ac78fr@r.postjobfree.com

Mobile No. 030*-*******

NAME : Syed Raza Hussain Shah

DATE OF BIRTH: 18th January, 1974

NATIONALITY: Pakistani

DOMICILE: Karachi

C.N.I.C. NO.: 42201-2063104-3

MARITAL STATUS : Married

TOTAL EXPERIENCE: Twenty one years (21 years)

TOTAL QA-QC E X P: May 2003 to February2015 (Eleven Years and Five months) ACADEMIC QUALIFICATION

Intermediate (commerce)

Diploma of Associate Engineer (Civil), 1st Division from Government College of Technology, Karachi in 1994.

SOFT SKILLS MS Office, E-Mail, Net Browsing

PRESENT EMPLOYMENT

01March2018 Till to Date

EMPLOYER Exponent Engineers (Pvt.) Limited

PROJECT BTK-M-9 Interchange Project

POSITION HELD Site Inspector (Civil Works)

Working 03Under Pass & 01 New Bridge and Existing of bridge RESPONSIBILITES

Check the steel Cage Piles installation, Pile Poring cutting, Pile Cutting,Pile Cap Pier Shaft Inspect Structure Formwork, Rebar Work as per drawing

Structure Concreting

Under pass Bottom slab,wall,Deck slab and Ramps

PREVIOUS EMPLOYMENT RECORD

1) 01Feb2017 Till to Date

EMPLOYER Exponent Engineers (Pvt.) Limited

PROJECT Pakistan LNG Import Terminal, Port Qasim

POSITION HELD Site Supervisor (Civil Works)

RESPONSIBILITES

Supervision of steel tubular Piles installation, Pile cutting, Pile Reinforcement cage installation, Pile plug concreting

To inspect Structure Formwork, Rebar Work as per drawing

Structure Concreting

Block Masonry works & Plaster works

Paint works

2) 2016 to 01Feb 2017

EMPLOYER: M/S TUV Austria Bureau of Inspection & Certification (Pvt). Ltd. PROJECT: L P G Gas plant up grade project

POSITION HELD: Senior Surveyor /Site Inspector

RESPONSIBILITIES:

Checkingof Coordinates Elevation, Levelling, Verticality and alignment of all foundation and all pipe supports.

Executionof B.M.to TBM and CP Points center line leveling and elevation as per drawing; InternalRoads andas built Drawing and bill checking.

3) 08April 2015 to March 2016

EMPLOYER : M/S Izhar Construction Pvt. Ltd.

PROJECT: P&G (Shaheen Hair Care Project)

POSITION HELD: Senior Surveyor / Supervisor

RESPONSIBILITIES:

Marking of Elevation, Leveling and Center Line Roads & Pipe Lines. 4) 04February 2008 to 28th February 2015

EMPLOYER : M/S Tuwairqi Steel Mill Ltd.

PROJECT: Erection & Construction new steel mill

Department: QA & QC (Mechanical & Civil))

POSITION HELD: Surveyor Site Inspector

RESPONSIBILITIES:

Checking of Elevation, Leveling, Verticality and alignment of erection side in DRI Structure, Pipe rack, all equipment, material handling and pip.

Execution of B.M. center line leveling and elevation as per drawing of Track hopers, Material handling, Stacker Recamier, Ring road and Internal Roads and bill checking.

5) 20th April2006 to 29th February 2008

EMPLOYER: M/s Halcrow Pakistan.

CLIENT: EMAAR International

PROJECT: Karachi Water front Development Zone “E” Project) POSITION HELD: QC Surveyor /Site Inspector

RESPONSIBILITIES:

Checking and Verification of Setting out line, slope ratio, orientation levels of Protection Bund and crest wall. Checking and Verification of Earth filling levels and coordinates as per grading plan for reclamation work. Crest wall Layout Form work & Concrete and bill checking. 6) 1st February 2006 to 20th April 2006.

EMPLOYER : Mot Macdonald Pakistan Limited.

CLIENT: D.C.L

PROJECT: D.H.A (Desalination & Power Project)

POSITION HELD: QCSurveyor/ Site Inspector

RESPONSIBILITIES:

Layout and Checking of Sounding of Pile and Pouring of Pile Checking, Verification of all Structure Layout and bill checking. 7) 16th May 2003 to 31st January 2006

EMPLOYER: Techno Consult International.

CLIENT: Karachi Water & Sewerage Board.

PROJECT: 2nd 100 MGD K-III Project’s Contract WN-5, Dhabeji to High Point Rising Mains.

POSITION HELD: QC Surveyor

RESPONSIBILITIES:

Layout and Alignment, Joint X-Sections, Control Points, Center Line, Bedding, Bedding, Coating Laying and Jointing and bill checking.

8) 16th February 2003 to 10th May 2003

CLIENT: National Logistic Cell.

PROJECT: Northern Bypass – Hub Road (Erecting for Asphalt Plant). POSITION HELD: Surveyor / Site Engineer

RESPONSIBILITIES:

Layout and Foundation Concreting.

9) 25th July 2002 to 15th February 2003

EMPLOYER: Indus man Corporation.

CLIENT: Karachi Water & Sewerage Board.

PROJECT: KWSB’s Contract WN-14. Syphon 19 & 20 link Pipeline of 84” dia. PRCC (Total Length 1.75 Km)

POSITION HELD: Surveyor / Site Engineer

RESPONSIBILITIES:

Layout and Alignment, Joint X-Section, Control Points/Center Line, Excavation, Bedding, Coating, Laying and Jointing of 84” dia. PRCC Pipeline

10) 1st January, 2001 to 24th July, 2002

EMPLOYER: Indus man Corporation.

CLIENT: Public Health Engineering Department (Hyderabad) PROJECT: 12” Dia. M.S. Pipeline - Nookot to Mitti (Total length 48 Km) POSITION HELD: Surveyor / Site Engineer

RESPONSIBILITIES:

Layout and Alignment, Joint X-Section, Control Points/Center Line, Excavation, Bedding, Sand Blasting, Coating, Laying and Jointing of 12” dia. M.S. Pipeline.

11) 29th March 2000 to 20th December 2000

EMPLOYER: Indus man Corporation.

CLIENT: Hyderabad Development Authority

PROJECT: 20” Dia. M.S. Pipeline for Jail Site Pumping Station to Qasim Chowk.

POSITION HELD: Surveyor / Site Engineer

RESPONSIBILITIES:

Layout and Alignment, Joint X-Section, Control Points/Center Line, Excavation, Bedding, Sand Blasting, Coating, Laying and Jointing of 20” dia. M.S. Pipeline.

12) 26th June 1999 to 28th March 2000

EMPLOYER: Indus man Corporation.

CLIENT: Port Qasim

PROJECT: 28 MGD Water Supply - PQA

POSITION HELD: Surveyor / Site Engineer

RESPONSIBILITIES:

Layout and Alignment, Joint X-Section, Control Points/Center Line, Excavation, Bedding, Sand Blasting, Coating, Laying and Jointing of 33” dia. PRCC Pipeline.

13) 19th June 1998 to 25th June 1999

EMPLOYER: Indus man Corporation.

CLIENT: Karachi Water & Sewerage Board

PROJECT: 40 MGD Extra Water Supply of 84” & 66” dia. M.S. & PRCC Pipeline (Total Length 2.75 Km)

POSITION HELD: Surveyor / Site Engineer

RESPONSIBILITIES:

Layout and Alignment, Joint X-Section, Control Points/Center Line, Excavation, Bedding, Sand Blasting, Coating, Laying and Jointing of 84” & 66” dia. M.S. & PRCC Pipeline.

14) 15th March 1998 to 18th June 1998

EMPLOYER: Indus man Corporation.

CLIENT: Karachi Water & Sewerage Board

PROJECT: Board of Secondary Education Pumping Station POSITION HELD: Surveyor / Site Engineer

RESPONSIBILITIES:

Layout, Construction and Finishing.

15) 26th November, 1997 to 15th March, 1998

EMPLOYER: Indus man Corporation.

CLIENT: Karachi Water & Sewerage Board

PROJECT: Khawaja Ajmair Nagri Pumping Station (Civil Work) POSITION HELD: Surveyor / Site Engineer

RESPONSIBILITIES:

Layout, Construction and Finishing.

16) 1st June 1995 to 25th November 1997

EMPLOYER: Indus man Corporation.

CLIENT: Karachi Water & Sewerage Board

PROJECT: Contract-4, 100 MGD 84”, 66”, 54” & 33” dia. PRCC Pipeline (Total Length 19.5 Km)

POSITION HELD: Surveyor / Site Engineer

RESPONSIBILITIES:

Layout and Alignment, Joint X-Section, Control Points/Center Line, Bedding, Coating, Laying and Join ting of PRCC Pipeline



Contact this candidate