Professional Summary
Skills
Work History
R W
**** ****** ******, *******, ** 77016 • 979-***-**** • **.*********@*****.*** Dynamic Construction Laborer who has worked as part of a union and as an independent contractor. Skilled in collaborating smoothly with a diverse range of management styles. Works in a timely and efficient manner to see tough jods through to completion.
Power and hand tools
Safety procedures knowledge
Efficient with all painting tools
Works well independently
Basic math and measuring aptitude
Start to finish home construction
Capable of heavy lifting
Self-motivated
Forklift and HAZMAT certified
Machine servicing
Stucko Specialist, 08/2012 to 02/2015
Golden West Plastering Co. – 35411 Aldine Westfield Handle material and perform general labor. Cement plaster ceilings, walls and additional spaces. Mixed porridge of catch basins and poured and sawed off concrete and asphalt. Consistently assumed additional responsibilities and worked extended hours to meet project deadlines. Prepared and cleaned construction sites by removing debris. Loaded and unloaded building materials used for construction. Forklift operator, 10/2010 to 07/2012
O.E.M Components – 15231 Aldine Wetfield
Unload materials such as pipe using forklift and pallet jack. Load machines using forklift such as band saws, lath and mills.
Operated forklifts and other heavy machinery safely. Maintained accurate stock records and schedules.
Supervised material flow, storage and global order fulfillment. Picked up incoming stock and delivered materials to designated locations. Divided cargo received by account number and intended location. Estimated weights, heights and centers of balance to make precise placements. Floor Tech/ Installer, 05/2003 to 09/2010
Elite Refinishing – 6639 Hartwick
Installed drywall, ceilings, trim and fabricated replacement trim and moldings. Aligned and squared frames and forms for installation. Built and hung custom doors and frames.
Constructed residential decks, carports, garages and sunrooms. Constructed safety provisions, including scaffolding, gang ladders, perimeter railings, fall protection and temporary covers.
Installed interior finish items, including wall protection, doors and hardware, toilet accessories, cubicle curtain tracks and TV brackets.
Followed established job site safety regulations and maintained a safe and clean work area. Planned and executed work with the proper tools and materials to maximize efficiency. H-Vac installer, 06/1998 to 04/2003
C.F.M Sales & Services – 5910 Fontenelle
Installed airconditioning equipment (residential and commercial), Handled materials, Trouble shooting, and Education
Certifications
performed general labor.
Accurately estimated time and materials costs for projects. Consistently assumed additional responsibilities and worked extended hours to meet project deadlines. Monitored inventory and reported items to be restocked for each job. High School Diploma: 2002
Westbury High School - 6700 Chimney Rock
[3.7] GPA
Continuing Education in History
Coursework in Algebra, Geometry, Physics and Technology Coursework in Mechanical Drawing and Computer Aided Drafting and Design Coursework in Materials and Tools Used in the Trade