Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Dallas, TX
Salary:
12.00
Posted:
January 11, 2019

Contact this candidate

Resume:

Felquir R. Jacob

***** ***** ***** ***. ****, Dallas, Texas 75251 USA 956-***-**** ac76ma@r.postjobfree.com Objective

A project management position in any area of construction that requires comprehensive total quality management knowledge, capability and expertise.

Experience

PROJECT SUPERVISOR MODERN CONSTRUCTION, INC. USA OCT. 27, 2016-JAN. 11,2017

• Supervise and perform Quality Assurance on site to ensure that contractual obligation is met.

• Monitor subcontractors and ensure adherence to schedules and specifications.

• Able to make decisions regarding safety and quality on the spot to make improvements, without further approval. Will resolve issues and act on behalf of management.

• Help maintain a current set of red line as-built drawings. Correlate and update construction documents as they are reviewed.

• Meeting with the customer and has the authority to implement changes bases on their conversation.

• Working with city officials, OSHA, and inspectors throughout the duration of the project. ARCHITECTURAL INSPECTOR AECOM MIDDLE EAST-DUBAI, UAE MAR 2013-JUN 2015

• Monitoring conformance to quality, performance, and/or code requirements by performing inspection duties

• Performs daily field inspections

• Maintains inspection records

• Participates in punch list, testing, and commissioning

• Tracks quality assurance progress

• Provides input to documentation for area equipment turnovers

• Inspects construction progress which may include ensuring procedures and materials comply with specification

• Observes work in progress to assure conformance with requirements and acceptable workmanship

• Reviews contract plans and specifications for compliance with appropriate building codes and project requirements

• Coordinate all aspect of submittals, review and approvals against contract requirements and when applicable report and advice on deviation

• Coordinate as may be required with client on all specialist participation related to the final acceptance of the work in readiness for the fit-out and operation of the project.

• Scheduling updates and contractor payment

• Observe testing and review test results for conformance with technical specifications

• Confirming quantities for pay applications

• Assist client in all aspects of the final acceptance of the work and close-out of all applicable Page 2

contracts in the project

• Coordinate with the team on site to ensure that contractual obligation is met. PROJECT SUPERVISOR MURRAY & ROBERT CONT.-DUBAI-UAE MAY 2007- DEC 2012

• Report to the Project Manager/Construction Manager. Collaborate with BIM modelling & MEP teams to prepare structural general arrangement plans and architectural plans – dry wall partition ceiling & fit out plans. Study interface clashes, coordinate with the BIM team to integrate connection details and make recommendations.

• Supervise the overall activities of the architectural design team, assuring harmony in the team, excellence in service delivery and quality of work.

• Use computer assisted software and tools to produce project designs & plans.

• Administer building projects ensuring compliance with design & construction procedures, zoning regulations, building codes and quality of building materials.

• Coordinate design matters with the engineering department and supervise production of execution drawings for building contractors.

• Monitor subcontractors and ensure adherence to schedules and specifications.

• Administer contracts and ensure compliance with plans through periodic site inspections.

• P r epare operating & maintenance manuals, studies & reports for client submission.

• Supervise the preparation of the general arrangement p l a n and the setting out plan for architectural, structural and MEP coordination.

• Assure on time delivery of high quality designs that fulfil specifications & budget requirements.

• Initiate and track RFIs with other departments.

• Attend project coordination meetings and resolve technical coordination issues.

• Supervise, monitor and report progress of the project through the project li fecycle ensuring on time completion.

SUPERVISOR KOCACHE INTERIORS-DUBAI, UAE SEP 2006-APR 2007

• Reported to the Project Manager. Led a team of 3 site engineers + 2 draftsmen in preparing

& executing detailed architectural designs for various projects.

• Coordinated with MEP contractors and prepared deliberations report before commencement of interior works. Reviewed plans and FF&E materials and ensured compliance with design & construction procedures, zoning regulations, building codes and material quality.

• Consulted with clients to determine functional & spatial requirements of new constructions

& renovations. Prepared reports on design, specifications, materials, color schemes, equipment, estimated costs and scheduled construction time for client approval.

• Used design software – AutoCAD & Photoshop and equipment to produce project designs Page 3

and plans.

• Prepared scale drawings & contract documents for building contractors. Represented clients in obtaining bids and awarding contracts. Administered contracts ensuring compliance with plans through site inspections.

• Coordinated with contractors & the project team to resolve technical issues. SUPERVISOR ALMANA GROUP OF HOSPITAL-ALKHOBAR, KSA JUN 2002-AUG 2006

• Reported to the Project Manager. Coordinated with team leaders of other disciplines and resolve architectural queries.

• Coordinated the production of designs & drawing, material requirement plans and material selection as per project specifications, cost, budget & quality requirements.

• Ensured adherence to the requirements of Infection Control Risk Assessment (ICRA) policies & procedures, completion of ICRA before start of each phase of construction and mitigation of risks.

• Coordinated MEP design and implementation minimizing disruptions to hospital operations.

• Instructed the architectural detailer on modifications/changes and reviewed revisions ensuring fulfilment of requirements.

• Prepared architectural submittals according to relevant standards meeting the requirement of authorities.

• Planned interior environments in close coordination with the client to determine architectural preferences, purpose & function of the environment, budget, type of construction and equipment to be installed.

• Maintained client focus throughout the project which ensured t hat the final product e x ceeded client expectations.

QA/QC INSPECTOR NAJRAN COMPANY-RAHIMA, KSA OCT 1991 TO MAR 2002

• Reported to the Project Manager and led all QA/QC activities related to critical painting/coating works of various projects.

• Developed, implemented, maintained, reviewed and updated the company Quality Management Systems, policies, procedures and practices aligned to ISO standards. Established cost effective quality & reliability requirements meeting project specifications and ensured compliance.

• Directed quality assurance programs to improve processes, r educe costs and implemented c o n t r o l s for effective mitigation of deviations through corrective & preventive actions.

• Monitored all QA/QC & safety activities at site related to critical coating works of above ground/underground piping, structural and allied items at oil & gas plant projects. Undertook troubleshooting and resolved technical problems on site.

• Represented QA/QC and coordinated with clients, consultants, suppliers & subcontractors.

• Developed project q uality p lans, inspection & test plans (ITP) and method statements and ensured adherence to approved documents. Implemented inspection & testing standards, methods & procedures assuring consistent precision, accuracy and reliability.

Page 4

• Developed checklists and conducted Internal Quality Audits, identified non- conformances and coordinated the implementation of corrective & preventive actions.

• Prepared QA/QC operation plans, operating & equipment maintenance budgets and training calendars to provide consistently high quality support to project operations.

• Monitored QA/QC performance a n d implemented measures to deliver customer satisfaction with zero customer complaints.

• Conducted stage wise inspections of all critical painting jobs for structurals, pipelines, buildings including new construction and repair works. Controlled surface preparation & painting works based on weather conditions. Ensured the quality of a l l painting/coating works i n c l u d i n g hot dip g a l v anizing. Ensured compliance with company procedures and international codes to deliver customer requirements. Coordinated with the technical representative of the paint manufacturer on a daily basis.

• Enforced all HSE rules & procedures for ensuring safety of all personnel and assets on the site.

Education

BACHELOR OF SCIENCE IN ARCHITECTURE 1983-1988 BICOL UNIVERSITY, PHILIPPINES Professional Memberships

• Philippine Society of Safety Engineers – Middle East Chapter KSA

• Safety Organization of the Philippines Inc

• Society of Filipino Engineers & Architects, International Training

• Reinforced Thermosetting Resin (RTR) Pipe System – Handling & Assembly

• Basic & Advanced CAD courses

• Cathodic Protection of Reinforced Concrete Structures

• Workshop on Computer Graphics – Adobe Photoshop

• Computer Aided Construction Project Management

• Basic & Advanced Revit Architecture



Contact this candidate