OBJECTIVE

Highly-experienced construction supervision professional with more than 26 years of experience in pipe trades, project supervision and project management seeking employment with an industry-leading company. Skilled in all aspects of the piping construction trades.

EMPLOYMENT HISTORY

Piping Superintendent

07/2018 – 09/2018 Enerfab Troy Alabama (Lead Unit) Union Workers

Came on to an ongoing project that was behind schedule, over budget and unproductive.

Created work packages for the field and set goals and priorities for the employees.

Updated schedule daily for weekly schedule meeting.

Increased productivity from 0.55 to 1.33 in a matter of weeks.

Piping Superintendent/ Site Manager

06/2017 – 04/2018 Corval Group Various (Mid-Stream)

$7 Mil. project installing 12” to 42” piping and coolers.

$3.7 Mil dollar expansion to add 8” to 30” piping and components.

Responsible for recruiting, hiring, on-boarding and all areas of multi-craft supervision.

Created P6 schedule for project at Magellan and maintained the schedule with updates.

Coordinated Sub contractors and mitigated work to best suit project.

Had weekly meetings with client and upper management on schedule.

Piping Superintendent

11/2016 – 01/2017 SNC Lavalin Brandywine, MD (Keys Energy)

Oversaw pipe, carpenters, operators, boilermakers and laborers on a two on one combined cycle power plant.

Responsible for ensuring correct measurements of pipe rack to turbines, field accuracy and welding procedures.

Performed QC on cleanliness and visual on weld before installation.

Attended schedule meetings and updated the night shift piping portion of the schedule.

Job Rep

04/2016 – 048/2016 Fishbone Energy (Texas)

Performed quality audits and ensured that work was being performed to industry standards.

Liaison between client and contractor.

Worked closely with operations to ensure that the unit was safe to work in.

Managed JSA procedure for work to be completed.

Attended daily schedule meetings and updated schedule.

QC Manager

04/2015 – 04/2016 GISY (Various)

Performed quality audits and ensured that work was being performed to industry standards.

Put together job closeout books.

Set up NDE as needed for proper completion rates.

Put together test packages and performed the test. These were large nitrogen tests.

Used construction software to manage cost, schedule and productivity.

Coordinated with other contractors on site and sub-contractors.

Attended weekly schedule meetings.

Pipe Superintendent

11/2014-12/2014 WFS (a Wyatt company) Orange TX (Invista)

Installed piping in accordance with drawings and specifications.

Made field changes on piping to ensure proper fitment.

Performed hydrostatic testing on new piping.

Piping Superintendent

09/2014 - 11/2014 Wyatt Field Service (Multiple Locations)

Planned and sketched drawings for new piping and estimated hours and materials.

Ordered materials for new pipe and oversaw fabrication in onsite fab shop.

Hired crews and supervision.

Updated schedule with percent complete.

Area Superintendent

11/2013 – 10/2014 PCL Construction Louisville, Kentucky Area

Water treatment, Cooling tower, and Fuel Gas area superintendent.

Oversaw the setting of all pump skids and tanks.

Worked closely with scheduling to create a workable and smooth flowing schedule.

Used construction management software to track quantities, manpower, cost, productivity and schedule.

Attended weekly schedule meetings with client and management.

Updated schedule with scheduler on site.

Attended daily construction meetings to coordinate work across the job site.

Hydro/Systems Coordinator

05/2013-08/2013 Mundy Co. Aransas Pass TX (Chevron)

Built hydro test packages.

Created a systems P&ID book for client color-coding each system.

General Superintendent/ Pipe Superintendent/QA/QC

01/2012-04/2013 KBR Multiple locations

Oversaw the night activities.

Ensured employees had proper MSHA certifications.

Walked Packages for pre-hydro, post hydro, and mechanically complete.

Monitored hydrostatic testing.

Assisted schedulers in creating an understandable and useable schedule.

Managed Union employees.

Updated schedule weekly

EDUCATION

2009-2011 Colorado Technical University Colorado Springs, CO

Associates in Business Administration Management

Bachelors of Science in Project Management

SKILLS

Capable of handling multiple projects.

Proven commitment to safety.

An advanced knowledge of hydrostatic testing and systems.

Microsoft Excel and word

Intermediate Knowledge of Primavera P6

Microsoft Project

CERTIFICATIONS

OSHA 10- hour Safety Training

MSHA - Supervisor Training

Certified Scuba Diver

NCCER Certified Plus Pipefitter

Behavioral Based Safety Observation Process Training

REFERENCES AVAILABLE UPON REQUEST

Rene Deleon Construction Coordinator 361-***-**** Years known 20+

Monica Garza Material Coordinator 361-***-**** Years Known 20+

Lora Quick Project Manager 435-***-**** Years Known 11



Contact this candidate