Post Job Free
Sign in

Engineer Assistant

Location:
Selangor, Malaysia
Salary:
3,500
Posted:
January 10, 2019

Contact this candidate

Resume:

MOHAMMAD

ADJRUN AZZEEM

AZHAR

Taman Sri Putra, Banting

MS Office Word

MS Office Excel AutoCAD

Bahasa

Matlab

Bachelor of Engineering (Hons.)

Electrical & Electronic Engineering

Diploma of Electrical Engineering

(Power)

Mohamad Al-Amin Bin Zaini Yah

Selangor

Softwares

Language

Dean’s List Award

Taekwondo

Dean’s List Award (Diploma, Mar ‘11)

Dean’s List Award

(Bachelor Degree, Sep ‘14 - Jan ‘15)

2 Gold Medals

2 Silver Medals

1 Bronze Medal

Represents UiTM Pulau Pinang (2010-2016)

2013-2016

2010-2013

CGPA 3.25

CGPA 3.16

UNIVERSITI TEKNOLOGI MARA

UNIVERSITI TEKNOLOGI MARA

Project Manager

for Engineering Department

HOME

SUMMARY

SKILLS

TRAINING/COURSES/PROJECTS

DISSERTATION

EDUCATION

ACHIEVEMENTS

CONTACT

REFEREE

013-*******

012*******

*********@*****.***

http://www.linkedin.com/in/adjrunazm

******@******.***.**

Z. Saad, A.J. Nur Hazirah, A. Suziana, M.A.A. Azhar, Z. Yaacob, F. Ahmad & M.A. Yusnita., “Short-term load forecasting of 415V, 11kV and 33kV electrical systems using MLP network,” in IEEE International Conference on Robotics, Automation and Sciences (ICORAS) 2017, Melaka, 2017. and teamwork quality in an assessment. Familiar in installation andwiring an equipment, but being able to understand how the equipment works and operates is another thing I am looking for. Is able to contribute effort and communicate with other respective to achieve company goals. As a pro-active staff, one must know how to manage An enthusiastic electrical engineering bachelor degree graduated at Universiti Teknologi MARA (UiTM), currently working at rolling stock manufacturing center. As a technical executive, he know his responsibility to ensure all technical documents are reliable and consistent with the process and meet the understanding of BS EN 50343:2014 requirement. Defined as a person who hungerventure in improving own skill their time effectively. Wheneber during critical period, flexibility is the key to overcome such matter and keep thing on priority track. He strongly believe, a self-motivated individual can easily molded to coordinate tasks if given a better platform that help to exploit his technical skills and abilities professionally in the future. WORKING EXPERIENCES

Experiences :

1. Assembly and complete connection process for interior system train such as, passenger CRRC Rolling Stock Center (MALAYSIA) Sdn. Bhd. August 2016 - Present Kuala Langat Power Plant Sdn. Bhd. July - September 2015 information system, lightning system, power supply system, signaling, emergency system etc. Project : Semi-overhaul Guangfo Metro

Project : Air Condition Blower Wind Power Generating Using Induction Motor 2. Process involved from wiring, protecting cable, connection termination and connecting cable. 3. Proper handle technical and quality document regarding the process involved 4. Implement a proper control of waste, quality and safety during perform process. Project : i. KTMB’s Electric Train Service II ( ETS II) (August 2017 - Present) ii.KTMB's Diesel Multiple Unit (DMU) (September 2018 - Present) Maintenance, Repair & Overhaul (MRO)

at Guangzhou, China 16th April – 14th May 2017

Objective : To generate electricity as renewable energy source by means of conditional wind blower system. To provide clean electricity from wind system applications concept at low cost of induction motor

Penang Invention, Innovation Design 2015 (PIID 2015) 26th October 2015 Objective : Training maintenance routine for Variable Voltage Variable Frequency (VVVF) module. There are traction box, traction module, traction fan, circuit breaker and line reactor assembled in a VVVF module. This train set as references training for actual KTMB’s Six Car Set (SCS). Mandarin

English

Experiences :

1. Assist engineer to commit railway manufacturing as applied in BS EN 50343:2014. 2. Assist engineer in preparing technical document for electrical assembly process (Process card, installation/wiring drawing, wiring/connection list, BOM list etc) 3. Supervise and monitor production process firmly reliable (man-power, man-hours) 4. Provide technical training and knowledge regarding rolling stock manufacturing 5. Analyze root cause regarding regular fault in production and rectify as well Project : Prasarana’s Ampang Light Rail Vehicle (AMGLRV) (August 2016 – March 2017) Position: Technician (Electrician)

Experiences : Utilize knowledge and get familiar with power generation technology. Understand the common daily operation, maintenance and faulty routine commonly occurred in 720 MW combined cycle power generation. Familiar with programmable logic controller (PLC), type of motor starters, valves, generator operation, transformer, converter and even water treatment. Position: Internship

Position: Assistant Engineer/Technical Assistant



Contact this candidate