Post Job Free

Resume

Sign in

Construction Manager

Location:
Miami, FL
Posted:
January 09, 2019

Contact this candidate

Resume:

To: Potential Employer

Attn: Human Resources

RESUME:

Thomas Holmes

**** ***** ** **** *********

Coral Gables, Florida 33134

Cell Phone 305-***-****

e- mail ac75sx@r.postjobfree.com

Summary Of Qualifications

Current Responsibilities:

Construction Company owner and president with over 35 years managing multi million dollar construction projects. Was responsible for business development with Owners, Architects, General Contractors and Sub Contractors, project estimates and budgets, preparation of conceptual bids, project schedules, coordinating and scheduling in house work force team of 30 and subcontractors. Other duties include setting up bank financing, meeting with engineers and architects on design build projects and working with company attorney regarding legal matters.

Certification:

Licensed Florida Building Contractor

Professional Experience:

Mello Development ( From 1978 to 1984 )

Supervision of projects, coordinating and scheduling contractors, overseeing all phases of construction and an in-house carpentry crew.

After completion of a project I was responsible for customer relations, unit walk throughs with owners and correcting any issues customers had with their units.

Building inspection and certificate of occupancy

Projects included office buildings, hotel renovations, construction of single family residential and high rise condominiums projects ranged from 4 to 54 units.

Holmes Builders Inc. ( From 1984 to 2017 )

Business development, estimating, project scheduling, owner, general contractor and subcontractor contract negotiations.

Hiring staff and contractors, material and equipment procurement, preconstruction ensure the project team understand aspects of the contract, schedule and job responsibilities.

As subcontractors Holmes self-performed carpentry work, concrete formwork, some jobs reinforcing steel placement and slab finish, hung doors, windows, set cabinets, erected roof trusses, timber roofs, framed hung and finished drywall, installed tile flooring.

As general contractors we did remodeling, additions, office interiors, new buildings residential and commercial.

Education:

Graduate Maple Shade High School, Maple Shade N.J. 4 year trade school. Studied mechanical drawing and architecture. Program had metal shop and building carpentry. Senior year mechanical drawing we had to design a part for a machine, draw it then build it, architecture design and draw a small version of a house and build it.

Miami Dade Collage Construction management 1 year .

Proficient with Microsoft Office, Microsoft Project, Adobe, Maxwell electronic estimating program and Primavera P3.

(1)

RESUME:

Thomas Holmes

3631 Ponce De Leon Bullard

Coral Gables, Florida 33134

Ph. 305-***-****

e- mail ac75sx@r.postjobfree.com

References:

Russell Anderson Moss Construction ph. 954-***-****

Eric Can Moss Construction ph. 954-***-****

Bret Levin Turner Construction ph. 786-***-****

Chris Gondalfo Swire Properties 786-***-****

Ron Ladone Teitelbaum Concrete 954-***-****

Maurice Weiner HMG Holdings 305-***-****

Tom Mello Mello Development 1-813-***-****

Project History

Project mix includes: Additions and renovations all sizes, office build-out, doctors office build-out, hotel renovation and addition, cast in place concrete and masonry, roof framing, rough carpentry and design build.

1.University Inn, Coral Gables, Florida

Work Description: Seven four-story buildings self-perform cast in place concrete form

work, place reinforcing steel and set structural steel.

Value Of Work: $1,868,400.

2.Grove Isle Club & Hotel Coconut Grove, Florida

Work Description: Perform as General Contractor for Construction Manager.

Renovation of rooms 6 story hotel, 3 story lobby addition, and bar

and restaurant addition. Self-perform concrete formwork,

demolition, partition framing, hang dry wall, install doors, windows

and wood moldings.

Value Of Work: $2,880, 235.

3.Florida International University, Library Addition Miami, Florida

Work Description: 3 story addition above existing library. Cast in place concrete form work, place reinforcing steel, place and finish concrete.

Value Of Work: $890,720.

4.Toscana Beach Club, Highland Beach, Florida

Work Description: 1 four story building. Cast in place concrete form.

Value Of Work: $554,245.

5.Mandarin Hotel, Brickle Key, Miami, Florida

Work Description: Cast in place concrete formwork for foundations. Included one mass

pour of 2000 cubic yards.

Value Of Work: $1,489,720.

(2)

RESUME:

Thomas Holmes

3631 Ponce De Leon Bullard

Coral Gables, Florida 33134

Ph. 305-***-****

e- mail ac75sx@r.postjobfree.com

Project History

6.Ocean Side 5 Fisher Island Florida

Work Description: Cast in place concrete formwork for foundations, place reinforcing

steel, place and finish concrete.

Value Of Work: $643,741.

7.Ocean Side 5 Fisher Island Florida

Work Description: Rough carpentry, roof trusses.

Value Of Work: $201,139.

8.Ocean Side 6 Fisher Island Florida

Work Description: Rough carpentry, roof trusses and install doors and hardware.

Value Of Work: $576,545.

9.Ocean Side 7 Fisher Island, Florida

Work Description: Rough carpentry, roof trusses.

Value Of Work: $224,151.

10.University Of Miami Ryder Center Goral Gables, Florida

Work Description: Install Doors and trim.

Value Of Work: $489,720.

11.Miami Dade Community College, Miami, Florida

Work Description: Cast in place concrete formwork and installation of doors and trim.

Value Of Work: $437,021.

12.Palm Beach International Airport, West Palm Beach, Florida

Work Description: Perform as general contractor for construction manager.

Furnish labor and material to build baggage handling facility. Self

perform demolition and cast in place concrete.

Value Of Work: $3,178,246.

13.Carrabelle Thompson Airport, Carrabelle, Florida

Work Description: Perform as General Contractor

Furnish labor and material to build one aircraft hanger. Self

perform cast in place concrete.

Value Of Work: $558, 339.

14.Grand Flamingo, Miami Beach, Florida

Work Description: Cast in place concrete formwork for 25000 sf. architectural concrete

common area. Included geometric recessed designs in slab.

Value Of Work: $288,701.

(3)

RESUME:

Thomas Holmes

3631 Ponce De Leon Bullard

Coral Gables, Florida 33134

Ph. 305-***-****

e- mail ac75sx@r.postjobfree.com

Project History

15.Continuum on South Beach, Miami Beach, Florida

Work Description: Cast in place concrete formwork for the tower foundations,

tower verticals

Value Of Work: $843,973.

16.Continuum Cabañas on South Beach, Miami Beach, Florida

Work Description: Cast in place concrete formwork and roof framing.

Value Of Work: $269,803.

17.Akoya, Miami Beach, Florida

Work Description: Install doors and hardware

Value Of Work: $372,846.

18.Las Olas Grand, Fort Lauderdale, Florida

Work Description: Installation of doors and hardware.

Value Of Work: $789,750.

19.Williams Island, Miami, Florida

Work Description: Rough carpentry, roof trusses and timber roofs.

Value Of Work: $239,800.

20.Swire Properties Sea Wall, Brickell Key, Miami, Florida

Work Description: Cast in place concrete for sea wall around island.

Value Of Work: $615,761.

21.Beacon Tradeport Telefonica, Miami, Florida

Work Description: Cast in place concrete formwork for internet server.

Value Of Work: $409,186.

22.Temple Bet Breia, Miami, Florida

Work Description: Perform as General Contractor.

Renovate office interior, perform demolition and cast in place

concrete.

Value Of Work: $607,905.

23.Hialeah Expressway, Hialeah, Florida

Work Description: Formwork for cast in place concrete retaining wall 2300 lf.

Value Of Work: $1,150,000.

(4)

RESUME:

Thomas Holmes

3631 Ponce De Leon Bullard

Coral Gables, Florida 33134

Ph. 305-***-****

e- mail ac75sx@r.postjobfree.com

24.. Snug Harbor Condominium Miami, Florida

Work Description: Cast in place concrete formwork for building shell, install doors

and trim.

Value Of Work: $1,134,572.

25.Courts I Parking And Retail, Brickell Key, Florida

Work Description: Parking garage and retail shops concrete formwork, cast in place concrete. Performed as subcontractors

Value of Work: $910,790.

26.Courts II Foundation, Brickell Key, Florida

Work Description: Cast in place concrete

Value of Work: $850,000.

27. Wakshlag Residence, Pinecrest Florida

Work Description: Perform as general contractor.

Addition and renovation of old house.

Value of Work: $350,000.

28. Saade Residence, Coconut Grove, Florida

Work Description: Performed as general contractor demolition of old house and

construction of a 3 story house.

Value of Work: $395,000.

29. Cordis, Miami, Florida

Work Description: Exterior and interior demolition, cast in place concrete, masonry

work, concrete structure for electrical room, cafeteria, build

temporary employee access/egress corridor.

Value of Work: $1,293,861. Performed as subcontractor

30. Continuum on South Beach, Miami Beach, Florida

Work Description: Foundation formwork and verticals, cast in place concrete.

Value of Work: $843,846. Performed as subcontractor.

31. Univision, Miami, Florida

Work Description: Concrete work

Value of Work: $110,000. Performed as subcontractor

32.The Village of Merrick Park, Coral Gables, Florida

Work Description: Cast in place concrete, rough carpentry

Value of Work: $680,448. Performed as subcontractors

(5)

RESUME:

Thomas Holmes

3631 Ponce De Leon Bullard

Coral Gables, Florida 33134

Ph. 305-***-****

e- mail ac75sx@r.postjobfree.com

33. The Bath Club, Miami Beach, Florida

Work Description: Concrete formwork, rough carpentry.

Value of Work: $4,700,000. Performed as subcontractors

34. Courts Parking, Brickell Key, Florida

Work Description: Parking Garage and retail shops concrete formwork, cast in place concrete. Performed as subcontractors

Value of Work: $910,790.

35. Miami Intermodal Center, Miami, Florida

Work Description: Cast in place concrete tunnels.

Value of Work: $2,200,000. Performed as subcontractors

36. Aqua on Allison Island, Miami Beach, Florida

Work Description: Stucco repair, caulking.

Value of Work: $193,250. Performed as subcontractors

37. Boca Beach Club Sales Center, Boca Raton, Florida

Work Description: Concrete and rough carpentry.

Value of Work: $915,000. Performed as subcontractors

38. Commerce Bank, Deerfield Beach, Florida Renovation

Work Description: Cast in place concrete.

Value of Work: $59,500. Performed as subcontractors.

39. F.C. Martin School, Miami, Florida

Work Description: Doors and windows hardware.

Value of Work: $57,400. Performed as subcontractors

40. The Mondrian Hotel, Miami Beach, Florida

Work Description: Doors and windows hardware.

Value of Work: $785,000. Performed as subcontractors

41. MIC Rental Car Facility GMP 4A, Miami, Florida

Work Description: Rough carpentry, steel doors and

frames, finish hardware, install hollow metal

door frames in concrete, furnish and installing,

roof blocking, restroom baby changing stations,

restroom benches, bird netting in the QTA area and

wheelstops at all parking spaces on 4th level.

Value of work: $1,264,126. Perform as subcontractor

(6)

RESUME:

Thomas Holmes

3631 Ponce De Leon Bullard

Coral Gables, Florida 33134

Ph. 305-***-****

e- mail ac75sx@r.postjobfree.com

42. Sonesta Beach Resort, Key Biscayne, Florida

Work Description: Concrete work, west perimeter seawall.

Value of work: $45,444. Performed as subcontractor

43. Brickell Key Round About Repairs

Work Description: Cast in place concrete formwork, pavers

Value of work: $41,600. Performed as subcontractor

44. Grove Isle Hotel Pool Paver Replacement. Grove Isle, Florida

Work Description: Removal and replacing of the concrete pavers

Value of work: $226,009. Performed as general contractor

45. Fairwind Hotel, Miami Beach, Florida

Work Description: Concrete formwork, concrete and masonry reinforcing,

concrete placing and finishing.

Value of work: $1,965,514.

46. Commodore Plaza Sky Light

Work Description: Design build timber roof framing and sky lights

Value of work: $98,000. Design build performed as general contractor.

47. Brickell City Center Perineter Masonry Wall

Work Description: Design build cast in place concrete, block, stucco and painting.

Value of work: $88,000. Design build performed as general contractor.

48. Brickell Seawall Cap Extension

Work Description: Seawall repair around island

Value of work: $79,000. Performed as general contractor

49. FIU Parking Garage 5 Retail Mall, Southwest Campus

Work Description: Concrete slab on grade and floor protection for parking garage

and retail shops rough carpentry

Value of work: $326,736. Performed as subcontractor

50. TSA Task Order 006 East, Ft Lauderdale-Hollywood Int’l Airport

Work Description: Flooring work

Value of work: $29,434. Performed as subcontractor

51. Doubletree Hotel Miami International Mart, Miami, Florida

Work Description: Structural repair X-bracing foundation concrete

Value of Work: $205,429. Performed as subcontractor

52. MCH Elevator & Encapsulation, Miami, Florida

Work Description: Rough carpentry and concrete work

Value of work: $38,950. Performed as subcontractor

(7)



Contact this candidate