CURRICULUM VITAE
Proposed Position for project : Tunnel Inspector
Name : Aishwarya Singh (A P Singh)
Date of Birth : 14th November 1977
Nationality : Indian
E-mail Address : *****.***@*****.***, Mobile. 940-***-****
Education : Diploma in Civil, Year 2000, from RGPV.
: B.E (Civil) From Delhi Institute of Engineering Studies in 2013
Membership in Professional Societies : Nil
Countries of Work Experience : India
Employment Record
From Oct, 2011 : 01-Jan.-2018
Employer : PEMS Engineering Consultant Pvt Ltd.
Position Held : Tunnel Engineer
Project : Consultancy Services for performing Role of Engineer for Construction of 8.8 Km Highway Tunnel across Rohtang Pass near Manali in Himachal Pradesh, India.
Project Cost : INR 1400 Cr.
Client : BRO – Border Road Organisation Himachal Pradesh.
As a Tunnel Engineer involve the construction activities of Heading and benching of tunnel. Supervise the Contractor works and implement the methodology in bad tunnelling conditions. Preparing daily, weekly report and time cycle to look at loop hole of slow progress, and increase strength according to delay or slow progress. To achieve target work hard and day by day analysis to maintain progress as per schedule. Issuing of RESS, ATSS and signing of documents. Installation of Rock bolt, wiremesh, shotcrete, concrete and precast elements. Deciding the Tunnel support system according to the geology encountered as the tunnelling progresses. Checking blast and rock and tunnel behaviour etc.
From SEP, 2008 : SEP, 2011
Employer : Longjian Road & Bridge Co. Ltd.
Position Held : Field Engineer
Project : Himachal Pradesh State Road Project (HPSRP), Construction Supervision
for Phase II: Widening and Strengthening Theog – Kotkhai – Hatkoti – Rohru Road from Km. 0+000 to Km. 80+684, Total Length – 80.684 Km. Contract No.PW. SRP/RIDC/HP/5/ICB Funded By World Bank.
Project Cost : INR 228.26 Cr
Client : World Bank-HPRIDC
As Field Engineer, responsible for supervision & monitoring the progress of Road & Bridge works, supervision, scrutiny, approving the final setting out by the contractor, reviewing drawings, setting up quantity & quality control procedures & review of contractors methodology of construction, measurement of completed works & maintaining construction records, checking contractor’s Batching plant, Crusher, & other equipments. Responsibilities also included supervising survey related works in respect of execution of excavation, concrete works, culvert works, and bridges; Curve set out, OGL for L-section & Cross Section, GSB Level, Subgrade level, WBM Level; TBM Level, Centre line marking, Retaining wall marking, Layout of Junction etc.
From Nov, 2005 : Aug, 2007
Employer : Sunway Construction Ltd.
Position Held : Field Engineer
Project : East-West Corridor Project - Rehabilitation & Upgrading of KM 104.000 to M
170.000 Of NH-25 in the State of Uttar Pradesh - Package-EW-II (UP-4), ADB
Funded.
Project Cost : INR 411 Cr
Client : NHAI
As Field Engineer, responsible for supervision & monitoring the progress of Road & Bridge works, supervision, scrutiny, approving the final setting out by the contractor, reviewing drawings, setting up quantity & quality control procedures & review of contractors methodology of construction, measurement of completed works & maintaining construction records, checking contractor’s Batching plant, Crusher, & other equipment’s. Responsibilities also included supervising survey related works in respect of execution of excavation, concrete works, culvert works, and bridges; Curve set out, OGL for L-section & Cross Section, GSB Level, Subgrade level, WBM Level; TBM Level, Centre line marking, Retaining wall marking, Layout of Junction etc.
From Mach, 2003 : October, 2005
Employer : SMS Infrastructure Limited
Position Held : Site Engineer (Tunnel)
Project : Construction of 4/6 Lane Katrajghat bypass of Pune-Satara Section Including Twin Highways Tunnels each 1235m long of NH-4 in the state of Maharashtra
Project Cost : INR 155 Crores
Client : NHAI
Responsible for overall monitoring of E/w in excavation in Soil, Ordinary rock, hard rock, PQC/HPC. Two twin tube tunnels of 1223 m length having three connecting passages, Permanent steel support and 100 mm thick. Shot Crete with rock bolts, 50 dia. Shotcrete, concrete lining, Precast R.C.C. Lagging. Involve in drilling and Blasting, Lining, Drainage work
From Oct., 2000 : Feb., 2003
Employer : Scott Wilson (I) Pvt Ltd.
Position Held : Surveyor
Project : Construction Supervision of Andhra Pradesh State Highways Phase - II, funded by World Bank. Length of Road 427 Km
Client : World Bank
Project Cost : INR 217.99 Crores
Field surveying levelling using Total Station & Auto level.
Taking OGL, TBM marking, alignment fixing, L-Section, Cross-Section etc.
Monitoring the project as per schedule.
Procurement of Material, Men and Machinery.
Running bill preparation for clients.
Sub-contractor bill checking.
Management of labour.
Co-ordination with client and consultant.
Place : JABALPUR Signature
Date : (Aishgwarya singh Thakur)