Post Job Free

Resume

Sign in

Power Plant Electrical Engineer

Location:
Aundh, Maharashtra, India
Salary:
35000 per Month
Posted:
January 05, 2019

Contact this candidate

Resume:

SATISH H. KARANJEKAR

E-mail: ac74nz@r.postjobfree.com

Contacte No-093********,967-***-****

An experienced Electrical Engineer with a gratifying career span of over one decade predominantly in the areas of Greenfield Project Management, Value-Engineering, Continuous Improvement, Erection, Commissioning and Operation & Maintenance of a variety of Electrical Equipments of Power, Cement & Steel Plants.

Professional experience:

Around 9.6 years of professional experience including Power plant, Steel Industry, Cement and power distribution industry.

1. MVNL (Maharashtra Vidhut Nigam Pvt Ltd.) (As Senior Engineer Electrical)

I am working with MVNL (Maharashtra Vidhut Nigam Pvt Ltd. At Deoli) as Senior Engineer Electrical. For its 10 MW power plant. I involve electrical maintenance and looking running plant activities.

Preventive maintenance of motors.

Routine test of motor Generator transformer, Auxiliary transformer.

Attend breakdown and it’s solve.

Maintenance of PMCC pane, MCC panel, Drive panel.

Also involve on the Preparation of shutdown schedules and preventive maintenance schedules.

Arrange require material for maintenance.

Preventive maintenance of 132 KV/11 KV Switchyard, HT Panel.

Period: Nov 2018 to till now

2.Rishi Engineering Urjankur at M/S Urjankur Shree Tatyasaheb Kore Warana Power Co. Ltd. Warana nagar Dist- Kolhapur

I had working with Rishi Engineering. As electrical Electrical for its Sugar and 44 MW Power plant.

Key Activities:

TG Synchronising with grid

Break down work attend

To ready Shift report

In Shift, To check Parameter of Generator, Power transformer, Aux. Transformer.

To Check Motor Vibrations, Drive panel

Maintenance of Motor, LT-HT Panel as per given schedule.

Period: August 2017 to 31 Oct 2018

3. M. Electricals & Enterprises at M/S Ultra Tech Cement Grinding Unit

I had working with M. Electricals & Enterprises at M/S Ultra Tech Ltd., Cement Grinding Unit, Navegaon. As an Electrical Engineer For its 250 TPH Grinding Unit

Key Activities:

Preventive maintenance of LT & HT Motors

Routine test of 15 MVA, 2.5 MVA X 4 nos. transformer, Auxiliary transformer.

Maintenance of PMCC panel, MCC panel, Drive panel.

Also involve on the Preparation of shutdown schedules and preventive maintenance schedules.

Trouble shooting of H.T and L.T Panel by study of drawings.

Prepare daily, weekly and monthly schedule of the field execution for all maintenance and modification works.

Actively involved in preparing & establishing of electrical safety system such as Implementation of Energy Isolation System (LOTOTO), permit to work (PTW) procedure, conducting training session.

Period: January 2017 to July 2017

4. B.S. Ispat, Warora. (As an Electrical Engineer)

I had workingwith BS Ispat LTD. Situated atWarora (Chandrapur) as an

Electrical Engineer. For its 25 MW power plant project & commissioning. After commissioning involved electricalmaintenance and looking after running plant activities.

Key Activities in Power plant project:

Installation and commissioning of 33/11KV substation with 15 MVA Transformer & 2.5 MVA transformers.

RTCC panel and Relay metering panel & all MCC, PMCC, HT panel erection and control wiring testing.

AVR, Relay metering panel, Synchronizing panel, NGR panel erection and

Commissioning.

Motors installation, its cable laying, termination and taken No load trial/load

Trial of cooling tower, CHP area.

Preventive maintenance of motors.

Routine test of motor Generator transformer, Auxiliary transformer.

Attend breakdown and it’s solve.

Maintenance of PMCC pane, MCC panel, Drive panel.

Also involve on the Preparation of shutdown schedules and preventive maintenance schedules.

Arrange require material for maintenance.

To made power report day, month wise.

Period: March 2013 to September 2016

5. Top Worth Urja& Metal LTD Umred, Nagpur (As an Electrical Engineer)

I hadworking with Top worth Urja& Metal LTD., Situated at Umred (Nagpur) as an Electrical Engineer. For its 30 MW power plant & Work start 2 X 35 MW power plant project. I involved electricalmaintenance and looking after running plant activities.

Period: March 2012 to March 2013

Key Activities:

Preventive maintenance of motors.

Routine test of motor Generator transformer, Auxiliary transformer.

Attend breakdown and it’s solve.

Maintenance of PMCC pane, MCC panel, Drive panel.

Also involveon the Preparation of shutdown schedules and preventive maintenance schedules.

Arrange require material for maintenance.

6. SidhabaliIspat Ltd Chandrapur ( As a project Engineer)

I had working at Shree SidhabaliIspat Ltd. in Chandrapuras Project Engineer. I was assigned to 1 X 20 MW power plant project. I am engaged on Sponge Iron 100 TPH Pre-Heater Kiln from July 2008.

Period: Aug 2008 to Feb.2012

Key Activities in Power plant project:

Installation and commissioning of 33/11KV substation with 15 MVA Transformer& 2.5 MVA transformers.

RTCC panel and Relay metering panel& all MCC, PMCC, HT panel erection and control wiring testing.

AVR, Relay metering panel, Synchronizing panel, NGR panel erection and commissioning.

Erection & commissioning of DCS make ABB &Danfoss Drive

1010 KVA DG set maintenance.

Sponge Iron 100 TPH Pre-Heater Kiln involved PCC panel, VFD panel, PLC and all MCC panel erection and testing of control wiring.

Parallel to this job looking after running plant activities

KEY RESPONSBILITIES:

Maintenance of HT and LT Switch Gears.

Maintenance of POWER Transformers.

Maintenance of AC Drives.

Maintenance of Power Control Centre and Motor Control Centres.

Maintenance of Motors.

Maintenance of Variable frequency drives of ABB Drives and Donfoss Drives.

Operation and Maintenance of 33 / 11 KV Substation.

Maintenance of 1010 KVA DG Set

Maintenance of 15 MVAV & 2 X 2.5 MVA transformer

Duration: - around 3.6 years

I was also worked in Sponge Iron industry with the capacity of 100 TPH pre- heater kiln.

PCC, MCC panel erection & commissioning.

PLC & drive panel erection & commissioning.

Parallel to this job looking after running plant activities.

Duration: -1 year

Educational Qualification:

Diploma in Electrical Engineering with 66.24%

SSC with 56.85 %

Bachelor of Art

Computer Skills:

Microsoft Office – 2000 (MS–Word, MS–Excel, MS–PowerPoint, Microsoft Excel)

Personal Details:

Name : Satish H. Karanjekar

Father's Name : Hiraman M. Karanjekar

Mother's Name : Suhasini H. Karanjekar

Date of Birth : 02-October-1979

Mobile No : 093********/096********

Sex : Male

Marital status : Married

Prof. Languages : English, Marathi & Hindi

Address : Gram seva Vasahat,

Behind Koche Gas, Godown, Bhandara - 441904



Contact this candidate