Resume

Sign in

Engineer Electrical

Location:
Lahore, Punjab, Pakistan
Salary:
9000
Posted:
December 24, 2018

Contact this candidate

Resume:

Tanveer Hussain

Lahore Punjab Pakistan

ac71g1@r.postjobfree.com

+92-321-*******

Professional Summery

"Electrical Engineer with exceptional problem solving and troubleshooting skills seeking a position in which these skills can be utilized and enhanced for the betterment of the company Capable reading or writing of diagram and instructions for electrical panel or equipment Excellent knowledge of the installation and maintenance system of electrical & equipment Designed and maintained major electrical systems Manufacturing & Installation of electrical equipment components, and system Commercial, Industrial, Military projects Able to run engineering projects from inspection to success Designed and maintained major electrical systems

Work Experience

Industrial Maintenance Automation commissioning & troubleshooting

VFD,Pressure Transmitters, PLC - Analog I/O module, Proximity switches

Pneumatic Hydraulic operation installation commissioning troubleshooting

Power distribution LV 480 / 3P & Domestic & Commercial

AutoCAD 2D, Electrical Symbols, Single line Drawing, Power, Control & Schematic

Control Circuit designing 24-400V, AC / DC

Automation of Asphalt Plant, Concrete Plant with SCADA or mTV-100

Textile Machinery, Steam Boilers, Hydraulic Pump, Installation & Troubleshooting

Food Industry, Metal Printing Press, Food Industry, Generators

PLC Mitsubishi, Analog Module 4AD, 4DA, PT & Load cell Module, PLC Delta, PLC Omron, PLC Fatek, Weintek HMI, mTV-100,PLC Siemens S7 200, WinCC SCADA & Communication remote Cables RS232 port

Electrical Standard BS 7671 and NEC Code 2008

Sub Station, Switchgear, MDP, SMDP, 3P Motor Power & Control design .25 - 200 Kw,

LV Cable Installation Termination testing inspection

Fire Alarm System. Fire Pump and Water Pump etc

Battery charging system fork lifter etc

Education

Diploma Sindh Board of Technical Education Karachi 1989

Secondary School Certificate: Sindh Board of Secondary Education Karachi 1985

Computer Skill

PLC & SCADA: Mitsubishi,Fatek,Delta & Siemens S7 200, WinCC Flexible

AutoCAD: Single Line Drawing & shop drawing

Ms Office: MS 2007 Excel,Word, Power Point

MS Project: Planning.

Window : Installation of Window7, Office2007, Pdf, Cad software etc.

Internet: Professional in Internet and other related software

Employment History

Project Engineer ANHAM FZCO Bagram Afghanistan

June 2012 to Jan 2015

Project Consists:

Industrial Refrigeration GEA Grasso Compressor Ammonia Gas Plant,

Cold & Dry Store for Food Supply, covered area (200 x 154meter) 500 meter external area

PLC Siemens S7-400, DCS, WinCC SCADA, Analog I/O, Pressure Transmitter, Level Sensor

Sub Station 3 MW, Switchgear, MDP, SMDP, Lighting, UPS, Battery charging Room, Fire Alarm, Fire Pump, PA System, DFAC, ECP, Water filtration Plant, Laundry, Accommodation, Guard Tower, Officer Barracks, Lift Station & Electromechanical System .Auto sliding doors Installation testing inspection & Troubleshooting

Major Duties:

To look after all kind of Electrical construction work of the project

Installation of GEA Grasso ammonia Compressor and other components

Installation of Hi Bay Lighting system in Cold Store

Installation of Hi Bay Lighting system in Dry Store

Installation of Auto Sliding door & motion control with FRABA safety

Preparation of Drawing for sub contractors

New Designing testing, inspection for all kind of Electrical Panel,

Preparation of Material Submittals

Installation of new Lift Station Automatic.

Security System, Fire alarm, Sprinkling system & Fire Pump installation

Power distribution system for Battery Charging room

Site Engineer IECC Construction and Engineering Afghanistan

Dec 2011 to May 2012

Project Consists:

New Designing and installation of Electrical Sub Station, Switchgear,Load Bank, MDP,External Power Distribution,Internal Power distribution System,Sub Panels for Living Accommodation, Kitchen, DFAC, Laundry, Guard Tower Officer Barracks,, HVAC and New Lift Station.

Major Duties:

To look after all kind of Electrical work of the project.

Preparation of Shop Drawings.

New Designing scheduled of Electrical Panel,

Preparation of Material Submittals.

Installation of new Lift Station Automatic.

Security System & Fire alarm.

Electrical Engineer Asia Construction & Logistics Kandahar Air Field

Aug 2011 to Nov 2011 Afghanistan

Project Consists:

New Designing and installation of Electrical Switchgear,Load Bank, MDP,Sub Panels for Living Accommodation, Kitchen, DFAC, Laundry, Guard Tower and HVAC and New Lift Station.

Project Engineer Istanbul Construction Camp Little Bear USTC

Dec 2010 to July 2011 Mazar shareef Afghanistan

Project Consists:

New Designing and installation of 2 Generator 1500Kva,SWGR,MDP,Armored and Unarmored Cables,Sub Panels for Warehouse, MWR, Kitchen, DFAC, Laundry, Armory Room, Guard Tower and HVAC and New Lift Station and CCTV.

Site Engineer Specific Engineering & Construction

June 09 to Jan 2010 Mazar Shareef Afghanistan

Project Consists:

SOW, Fire Alarm, Water Pump Control System for all Storage (Port Hairatan) Nearby Uzbekistan.

Site Engineer Encorp-International Camp Phoenix Phase II Kabul

May 08 to June 09

Project Consists:

Client: US Army Corp of Engineering

Main Contractor: CH2m Hill (USA)

Designing and Construction for 5 Billets, Gymnasium, Auditorium & Transbillet.

Electrical Engineer Perfect Range Zipper Industry Pakistan

Nov 03 to Apr 08

Project Consist:

Zipper Injection molding Machinery

General Shift: 8am to 6pm

Responsibilities:

To look after all kind of Electrical work of the project to the utmost requirement.

Maintenance and troubleshooting of hydraulic machinery

Implemented power lighting, Security System & Fire alarm

Installation of Fixtures including Lights, Fans, Sockets, Switches, Water Heater, Telephone panel and light pool etc.

Installation and Termination of cables at distribution panel

Maintenance Engineer Sarah Textile Lahore Pakistan

July 1998 to Oct 2003 Fabric Dyeing & Finishing Machinery

Steam Boilers

Stenter Machine Pringting Machinery

Fongs Machinery

Terrot Knitting Machinery

Van Ganguard Knitting Machinery

Duty Timing Details:

Gen shift 9am to 5pm

1st Shift: 7am to 3pm

2nd Shift: 3pm to 11pm

3rd Shift: 11pm to 7am

Responsibilities:

General Maintenance,

Inspection, Testing, Troubleshooting of power and control panels.

Safety system

Electric Motors 0.25 to 200kw Overhauling.

New Control Circuit designing all kind.

Implemented power lighting, Fire alarm system.

Installation and Termination of cables at distribution panel

Lying of main duct bank, Low Voltage Cable and its Termination at Main Switch Board.

Installation and Termination of cables at distribution panel

Maintenance Supervisor Sunshine Textile Sheikhupura Pakistan

Feb 94 to July 98 Spinning Textile Machinery

Marzoli spinning frames

Trutzschler Blow Room Line

mesin kartu crosrol MK4

RITER Spinning Machinery

Murata Machconer

Duty Timing Details:

Gen shift 8am to 4pm

1st Shift: 6am to 2pm

2nd Shift: 2pm to 10pm

3rd Shift: 10pm to 6am

Responsibilities:

General Maintenance, Inspection, Testing, Troubleshooting of power & control panels, VFD, Pressure transmitter, PLC I/O Analog, Water Pump, Water Turbine, Treatment filtration Plant, Overhead Crain, Fire alarm safety system

Substation Breakers inspection testing and replacement

MDP, SMDP, Panels inspection testing and troubleshooting

LV Unarmored cables installation testing troubleshooting and replacement

Water Pump, Water Turbine

Maintenance Supervisor Mehmood Textile Mills Pakistan

May 92 to Feb 94 Spinning Textile Machinery

Toyota Spinning machinery mesin kartu crosrol MK4

Trutzschler Blow Room Line

Murata Machconer

Duty Timing Details:

Gen shift 8am to 4pm

1st Shift: 6am to 2pm

2nd Shift: 2pm to 10pm

3rd Shift: 10pm to 6am

Responsibilities:

General Maintenance, Inspection, Testing, Troubleshooting of power & control panels, VFD, Pressure transmitter, PLC I/O,

Substation Breakers inspection testing and replacement

MDP, SMDP, Panels inspection testing and troubleshooting

LV Unarmored cables installation testing troubleshooting and replacement

Electrical Technician Nishat Group of Company (Textile Industry)

Dec 90 to June 92 Spinning Textile Machinery

mesin kartu crosrol MK4

Toyota Spinning machinery Trutzschler Blow Room Line

Murata Machconer

Duty Timing Details:

Gen shift 8am to 4pm

1st Shift: 6am to 2pm

2nd Shift: 2pm to 10pm

3rd Shift: 10pm to 6am

Responsibilities:

General Maintenance, Inspection, Testing, Troubleshooting of power & control panels, VFD, Pressure transmitter, PLC I/O Analog, Water Turbine, Treatment filtration Plant

Substation Breakers inspection testing and replacement

MDP, SMDP, Panels inspection testing and troubleshooting

LV Unarmored cables installation testing troubleshooting and replacement

Electric Motors 0.25 to 200kw Overhauling.

Control Circuit designing 24V – 480V

Language

English: Good command in both spoken and written

Dari: Normal

Pusto: Normal

Urdu: (Mother Tongue).

Personal

Name: Tanveer Hussain

Nick: Hussain

Passport No: MY6892601 (Computerized Readable)

Date of issue: 10 Jul 2018

Date of expire: 10 Jul 2024

Pak No: +92-321-******* (24Hrs)

+92-333-*******

Email: ac71g1@r.postjobfree.com

Address: 106B Tajpura Scheme Cantt Lahore

City: Lahore (Pakistan)

Province: Punjab

Country: Pakistan

Marital Status: Single

Availability: Subject to Provision

LinkdIn Profile web address

http://www.linkedin.com/profile/public-profile-settings?trk=prof-0-ovw-public_profile-secondary

Thanks for Giving Me This Precious Time of Yours.

ACCEPT MY REAGARDS“

REFERENCES CAN BE NOMINATED UPON REQUEST”



Contact this candidate