Er. Nitin Baliram Lahane.
***, ***** *********, *-****-**************@*****.***.
Narayan nagar road, **************@*****.***.
Titwala (E)
Mobile: +91-810*******, 720-***-****)
Objective:
With technical knowledge and creativity, I aspire to render quality services keeping my goals in tandem with those of organization. In time I aim to reach a position of responsibility and challenge.
Professional Synopsis
Responsibilities
A Civil Engineer with 6 years of experience in Mivan and Convectional Shuttering and finishing work working in 25 Floor Building of civil engineering projects.
Site execution of civil work in remote area.
Studying various building plans and project specification.
Handling Contractor, laboure contractor.
Ensure quality of civil construction as per design / drawing.
Scrap control.
Preparing BBS of all R.C.C. works.
Study of BOQ and estimate /analysis of civil work.
Weekly Site Planning discus with PM.
Coordination RMC Plant at time of concrete.
Coordination between Project Manager, Contractor, Sub-Contractor and H.O.
Professional Synopsis
Working Project
A)RCC Work
1) (G+20) Mivan Shuttering Building.
2) (G+25) Conventional Shuttering.
3) OHWT.
4) UG TANK. 5) Pile Footing.
B) FINISHING WORK
1)Mivan Building
Wall tie removing and hole filling.
Grinding and cheeping work.
Wall putty applying on surface.
2)Conventional Building
Brick Work.
Plastering.
3)Finishing(Quantity Calculated)
Flooring
Skirting.
Dado.
Kitchen platform.
Door and window opening.
Track details.
Brick Work.
Plastering
Painting.
BBS.
4) Plumbing.
Sleeve fixing in OHWT and UGT
C) INFRASTRUCTURE WORK
Working in Paver Block Road.
Sewer line, Manhole, Chamber.
Footpath and Cable trance.
Career Contour
1. NIRMAL NCCCL CONSTRUCTION PVT. LTD. ( 4 year,5 month)
Duration: July 2012 to till date
Designation: Tr engineer to Site engineer.
Project:-
Nirmal Lifestyle City, Kalyan (Mega Township project 15 to 25 floor,35 Tower)
Client: - Nirmal Lifestyle
Project Cost:-525 Crores.
Built up Area-3500000 Sqft.
(J V Project - New Consolidated Construction Co. & Nirmal Lifestyle kalyan Pvt. Ltd)
Scope:-
Overall co-ordination with Client & Contractors.
All Site Required Material Quantity Calculated and Estimations.
Preparing Overall BBS.
Work in Mivan and Convetional Shuttering and finishing Item.
Work in OHWT, LMR, UGWT, Pile Foundation And Hilty Work.
Participate in schedule driven weekly review meetings and highlights all type of issues.
2. NIRMAL LIFE STYLE,KALYAN (1 Year, 7 month)
Duration: November 2016 to till date
Designation: Site Engineer
Project:-
Nirmal Lifestyle City, Kalyan (Mega Township project 15 to 25 floor,35 Tower)
Rcc consultant:- Jw
Architech: Hafeej contractor
Project Cost:-525 Crores.
Built up Area-3500000 Sqft.
Education
B.E.Civil:
Secured First Class (61%) in final year examination conducted by Pune University through Amarutvahani COE in 2011.
Diploma in Civil Engg.
Secured First Class (65%) in final year examination conducted by Maharashtra State Board of Technical Education through Govt. Polytechnic, Thane 2007.
Projects Completed:
B.E. Final Year
Low Cost Material used to water purification
Seminar:
Admixture used in concrete
Diploma:
.Planning Building Complex, Rain water hard wasting.
IT Skills
Well versed with AutoCAD 2008, and MS-Office & Internet.
Reference Person:-
Notice period :- 30 days
Current CTC :-3.75 Lacks
Expected CTC :- 5.00Lacks
Date:-
Place: - Mumbai, Kalyan
(NITIN BALIRAM LAHANE)