KEN. HARDY. C. V. ELECTRICAL ****
Full Name: KENNETH.GEORGE. HARDY
Address: **, ******** ***, ****
THORNABY-ON-TEES, CAGAYAN DE ORO CITY
STOCKTON-ON-TEES, PHILPINNES
CLEVELAND, UK 9000
TS17 OLS
Home Phone: +44 (0-164*-******
Mobile Phone: UK+44 (0) 7-715-******
Skype Address Kenneth George Hardy
E-mail: k_ g ******@*******.***
Date of Birth: 17/04/53
Passport No: British.
Expiry Date: 03-11-2021
Transport: U.K. full and clean, Philippines, Korean
Qualifications: NORTHERN COUNTIES TECHNICAL COUNCIL
Electrical Installation Craft Principles.1969-70
Electrical and Craft Principles 1970-71
Electrical/Electronics Craft Principles II 1971-72
OLF Norwegian Basic Safety and Emergency/ Helicopter Escape
UKOOA Certificate of Medical Fitness .2011
MOXI Hazardous Area 8-day Attainment course 2012
Discipline: E+I SUPERINTENDANT / INSPECTION / COMPLETIONS
Summary: 40 + years comprehensive background in Heavy Industrial Construction Projects including Power Generation, Oil and Gas Facilities Onshore, Offshore, Fabrication Yard, Modules, Topsides, Integrated, Decks,, FPSO new Builds and Conversions, Construction, Engineering and Inspection activities as designed in the project approved Quality plans, surveillance of Construction workforce to ensure Specification requirements are maintained and achieved in accordance with Approved procedures, Codes and Standards.
-- EMPLOYMENT HISTORY –
2017 GE/Alstom (Shanahan Engineering)
Position Electrical Construction Engineer
Project Ashalim Solar Thermal Power Station. Israel
Duties Electrical Inspection Walk downs TOP completion.
2011 -2015 KBR Korea Gorgon Project ( Chevron )
Position: QA QC Lead Electrical Inspection Supervisor
Projects: Gorgon LNG Project, Barrow Island, WA
Module Construction HHI Ulsan Korea.
Duties: Hazardous Area Inspection of Installation,
EEHA and Standard Equipment
2009 - 2011 GENERAL ELECTRIC Russia (Shanahan Engineering)
Position: Electrical Coordinator
Projects: 400 MW GE 9FA Power Plant. Shatura, Moscow, Russian Federation
2 x 400 MW GE 9FA Units Surgut, Siberia, Russian Federation.
Duties: Project Management and Engineering, Completions,
Project E+I Installation Coordination for Construction completions of
Centre Line, BOP, HRSG and Offsite Gas Compressor Facility.
2007-2009 SNC-LAVALIN…. Saudi Aramco
Position: Electrical Construction Engineer
Project: GOSP-4 Shaybah, Saudi Arabia. Oil and Gas Process Facility.
Duties: Project Management and Engineering, Completions,
Construction activities from underground Ducts, Pipe rack Cable
Ways, Installation of HV, LV Transformers, Substation
Construction, HV, LV, Switchgear and MCC, UPS, PCS, DCS Control
Mechanical Completion.
2007 KUWAIT OIL CORPORATION ( AMEC-PMT )
Position: Electrical Construction engineer
Project: KOC Oil Fields Up-grades to Gathering Centers, Booster Stations
Facilities and Sub stations. Kuwait
Duties: Project Management Team
Construction activities from underground Ducts, Pipe rack Cable
Ways, Installation of HV,LV Transformers, Substation Construction
HV, LV, Switchgear and MCC,UPS, PCS,DCS Control
Systems including Cable Installations and Terminations and
Mechanical Completion.
2005-2006 MITSUBISHI CORPORATION (Shanahan Engineering)
Position: E+I Manager
Project: Hunts Town -Power Project II, Dublin Ireland.
Duties: Management of Electrical Installation from Ground Works
to Turbine Hall, Buildings and BOP of 400MW Combined Cycle
Power Generation Plant Designed And Built by MHI.
Construction activities from underground Ducts, Pipe rack Cable
ways, Installation of HV,LV Transformers, Substation
Construction, HV, LV, Switchgear and MCC,UPS,PCS,DCS Control
Systems including Cable Installations and Terminations.
2004-20005 EXXON MOBIL (Brunel Energy PTE )
Position: E+I Inspector / Snr Topsides Superintendent.
Project: ERHA FPSO S.M.O.E. Singapore, MSE Malaysia
YOHO Project SSE Shipyard Malaysia
Duties: Fabrication and Installation of Topside Modules, Including
12 Switchrooms,3 Control Rooms, Generation, and Process
Modules, Inspection and Preservation of Equipment and
Materials. Verification of Installation to Project
Specifications and I.F.C. Drawings …… WINPCS.
2000-2004 KAYMAS ELECTRICAL ENGINEERING LTD
Position: Electrical Superintendent
Projects: Prosafe, Safe Caledonia, Upgrade
Rolls Royce, Croydon Power Energy Project
Transocean; Sedco Forex; Nordic; Jack, Bates; Wildcat,
Sedco 711, 712, 714,Paul. B.Lloyd .Toisa Pisces Well Test.
Duties: Ex. Survey / Engineering / Inspection / Mechanical
Completions / Installations and Modifications to existing Platforms
And Module Fabrication.
1999-2000 RAYTHEON ENGINEERS & CONSTRUCTORS
Position: Senior Construction Superintendent
Project: Saltend Co-Generation Project – Hull, UK 3 x 1200MW Turbines/BOP.
Duties: Engineering / Inspection / Mechanical Completion.
Management of Electrical Installation from Ground Works
to Turbine Hall, Buildings and BOP of 400MW Combined Cycle
Power Generation Plant Designed And Built by MHI.
Construction activities from underground Ducts, Pipe rack Cable
Ways, Installation of HV,LV Transformers, Substation
Construction, HV, LV, Switchgear and MCC, UPS, PCS,DCS Control
Systems including Cable Installations and Terminations.
1998-1999 KVAERNER OIL & GAS-AMERADA HESS
Position: Senior E & I Inspector /Construction Superintendant.
Project: Triton 1 (FPSO)
Duties: Stage 3 of conversion of D.W.T. FPSO.
Location: Samsung Heavy Industries, Geoje Island, Republic of Korea
Duties: Stage 1 completion of D.T.W. Cargo Tanker Triton 1 and
Provision of conversion work to future FPSO
Location: Sembawang Shipyard, Singapore
Duties: Stage 2 of conversion of D.W.T. Cargo Tanker Triton 1 to FPSO
Location: Kvaerner Fabrication Yard UK.
Duties: Stage 3 Fabrication and Installation of Topside Modules
1997 AKER MARITIME
Position: E & I Inspection Supervisor
Project: Glas -Dowr (FPSO) Blue water - Heerema Hook-up North Sea UK
1996-1997 R & H (UK) LTD
Position: Mechanical Completion Co-coordinator
Project: Glas Dowr (FPSO) Blue water – Heerema UK
1996 CAXIOS
Position: Mechanical Completion Co-coordinator
Project: Melinar 5 - ICI Wilton UK
1994-1995 JAMES SCOTT-AMEC
Position: E & I Inspector
Project: Liverpool Bay Project - Hamilton Oil (BHP) UK
1989-1994 REDPATH ENGINEERING-CJB
Position: Test Inspection Supervisor
Projects: BP Bruce, BP Miller. Ravenspurn North (Hamilton Bros)
Piper Bravo Occidental / EEC, Marathon Brae B,ELF Petroland K5
1988-1989 AGS NORWAY
Position: Electrical Technician
Project: Statoil, Mongstad Refinery Norway
1987-1988 EMS – Redpath Dorman Long.
Position: Inspection / Pre-Commissioning Supervisor.
Project: Shell Tern / Shell Eider - Accommodation and Generation
Modules UK
Previous History and Referees available .
Names;- Harry Henderson Project Manager hsquarednca@ yahoo.com
Mike Sunderland M.D. ***********@******.***
Kirk Douglas Project Manager ****.*.*******@**********.***
Samih. Musharrafiyyah Const. Manager *****.**************@**********.***
Norman Runge QA QC Manager norman .*****@*******.***