RESUME
POSTAPPLIEEFOR :: MECHANICALENGINER
NAME :: SKMUDASSARRAHAMAN
MOB. :: +919*********
PERSONALDETAILS
FATHER’SNAME :: SKSAHANSHA
DATEOFBIRTH :: 27/04/1988
NATIONALITY :: INDIAN
LANGUAGEKNOWN :: BENGALI,HINDI,ENGLISH
RELIGION :: ISLAM
MARITALSTATUS :: SINGLE
CATEGORY :: GENERAL
SEX :: MALE
COMMUNICATIONADDRESS
:: VILL-SARADABASAN,P.O.-SAGARBARH,P.S-
KOLAGHAT,
DIST.-PURBAMEDINIPUR,PIN-721151,
E-MAILID :: ****************@*****.***
PASSPORTDETAILS
PASSPORTNO. :: J7585639
DATEOFISSUE :: 06/07/2011
DATEOFEXPIRE :: 05/07/2021
PLACEOFISSUE :: KOLKATA
GENERALQUALIFICATION :-
EXAM PASSES YEAROFPASSING INSTITUTE/BOARD %OBTAINED MADHYAMIK
(W .B.B.S.E)
2 0 0 5 SAGARBARHB.S.VIDYABHAWAN 75.50 %
HIGHERSECONDARY
(W.B.C.H.S.E)
2 0 0 7 BHOGPURK.M.HIGHSCHOOL
69.60 %
TECHNICALQUALIFICATION :-
C O U R S E YEAROFPASSING INSTITUTE PERSENTILE
B.TECHINMECHANICAL
ENGINEERING
(W .B .U .T )
2008 -2012
DR.B.CROYENGINEERINGCOLLEGE
(DURGAPUR)
OVERALL-8.0
TRAINING-1 :- STUDYOFVARIOUSOPERATIONOFASTEEL
PRODUCTION PLANTINDURGAPURSTEEL
PLANT(DGP)
TRAININGINATDURGAPURSTEELPLANT
DURATIONOFTRAININGIS12DAYS(2
WEEKS)
TRAINING-2 :- STUDYOFMANUFACTURINGOFGEARBOXIN
SIEMENS(KGP)
TRAININGINATSIEMENS,KHARAGPUR.
DURATIONOFTRAININGIS21
DAYS(3WEEKS)
PROJECT-1 :- PROJECT ON “RESCUE ROBOT IN HUMAN
WELFARE.
UNDERTHEPROFDIPANKARBHANJA,DEPT.
OFMECHANICALENGINEERING
USEOFROBOTSINHUMANWELFARE.
DURATIONOFPROJECTIS1YEAR.
PROJECT-2 ● PROJECTONSPACESHUTTLETHERMAL
PROTECTIONSYSTEM(TPS)
UNDERTHEPROF.DIPANKARBHANJA,DEPT.
MECHANICALENGINEERING.
THERMALPROTECTINGPLATE,PLATE
MATERIAL.
DURATIONOFPROJECT1YEAR.
EXPERIENCEOFINDIA
COMPANYNAME DESIGNATION PERIOD
UTKARSHTUBES&PIPESLTD. QUALITYCONTROL
MECHANICAL
ENGINEER
02YEARS07MONTH
(11/01/2016TO
CONTINUE)
RESPONSIBILITIES- ●ALLASSINGMENTWHEREVERTHEREISA
REQUIREMENTOFANENGINEER
FORPRODUCTION,WILLCOME.
DIRECTLYWITHINTHEAMBITOFMYDUTY
●INPROCESSESANDFINALINSPECTIONOF
HIGHMAST.
●TOMAINTAINALLRECORDSOFINSPECTION
WORKS.
●INSPECTIONOFRAWMATERIALS,PURCHASED
ITEMSANDREPORTTOCONCERNEDHIGHER
AUTHORITYANDDIRECTOR.
●TOASSISTSATTHETIMEOFPRODUCTIONAND
DISPATCH.
●TOSUPERVISETHEACTIVITIESATPLANT.
●TOATTAINEDNTHETHIRDPARTYINSPECTION.
●TOMAINTAINISODOCUMENTATION.
●TOPERFORMVARIOUSOTHERWORKSOR
DUTIESASPERDEMANDOFTHESITUATION.
●ATTENDMONTHLYPROJECTREVIEWMETING
ANDALERTTHEPROJECTTEAMOFPOTENTIAL
PROBLEM.
●PROVIDETECHNICALSUPPORTTOTHE
PROJECTMANAGERANDGUIDENCETOSITE
STAFFINSUBMISSIONOFMATERIALSFOR
APROVAL.
ACIVEMENT- ●WINBESTEMPLOYEAWARDSFORTEAM
WORKPERFORMECE.
●WINMANYMOREPRIZESINACADEMICCAREAR
FORGOODPERFORMENCE.
HOBIES- ●FISHING
REGARDS
SKMUDASSARRAHAMAN
PLACE:-SARADABASAN(INDIA,W.B)
DATE:-
SIGNATURE