Post Job Free

Resume

Sign in

Service Engineer

Location:
Riyadh, Saudi Arabia
Salary:
15000SR
Posted:
August 17, 2018

Contact this candidate

Resume:

TAHA ABDEL-SATTAR ALI

TESTING AND COMMISSIONING TEAM LEADER.

Mobile: +966*********

+002***********

E-Mail: ac6pdf@r.postjobfree.com

Personal Profile:

Religion : Islam.

Nationality : Egyptian.

Date of birth : 16-9-1989.

Marital Status : Married.

Domicile : Beni-suef (Egypt).

Education

May 2011 Helwan University (Cairo - Egypt)

B.Sc. of Engineering

Department of Electrical power and Machine

Total Service Period:

Five years one year in Egypt( on track corporation) and four years in Saudi Arabia (AL-GIHAZ

HOLDING)

1: Employment Record in Saudi Arabia:

Period Position Company Country

24 November 2013-till to date. Testing & Commissioning ALGIHAZ, GESCO SAUDI ARABIA

Engineer

Job Description:

Since 24-11-2013 till-to-date, working as protection testing and commissioning Engineer for 380-132-110/33-13.8 KV Electrical Power substation in GeSCO. Sub Division of AL GIHAZ contracting and trading Co. for Substation Testing and Commissioning. I have successfully completed the following job responsibilities.

Gas Insulated Switch Gears Testing (GIS).

1- (110–132-380KV) complete function and scheme check (ABB & HYUNDAI).

2-Isolator and E/S contact resistance measurement and timing test.

3-Circuit Breaker Timing test.

4-CT and VT Testing

5-Auxiliary component, Energy meters.

6-SF6 gauge calibration test.

7-SF6 Gas leakage test.

8-Secondary injection for VT loops.

9- Arrange synchronization loop with required scheme modifications, condition for synch. And BCU settings.

10-Secondary injection for CT loops.

11-Closed loop check.

12-Bus bar stability.

SWITSHGEAR 13.8 KV.

1-Switchgear 13.8kv and 33kv Scheme and function check.

2-CT'S tests.

3-Contact resistance for Earth Disconnector switch.

4-CT loop secondary injection.

5-VT loop secondary injection.

6-Primary injection.

7-Arrange synchronization loop with required scheme modifications, condition for synch. And relay settings.

All type of Testing for power Transformer.

1- Tan delta testing.

2-Insulation resistance and polarization index test.

3-Winding resistance test.

4-Short circuit test (impedance measurements)

5-Magnetizing current test (no load test)

6-Turns ratio test.

7-Temperature gradient for gauges.

8-Scheme and function check for TMK and MDU

9-Stability and diff. check.

All type of Testing for Current Transformer.

1- Polarity test.

2- Ratio test.

3- Winding resistance test.

4- VA Burden Test

2-Meager/Insulation resistance test

3-Saturation/Excitation/Magnetization test Using CT Analyzer and CBC 100.

Protection and control testing.

Scheme and control checking:

1-Line feeder Protection panel’s scheme and function check.

2-Transformer protection panel's scheme and function check FOR 110KV AND 380KV.

3-Low impedance bus bar protection panel's scheme and function check.

4-Capacitor protection panel scheme and function check.

5-Automatic capacitor control (ACCS) scheme and function check.

6-Automatic bus transfer (ABTS) FOR SEL451.

7-Automatic voltage regulator (AVR) Scheme and function check.

8-Mosaic panel.

9-ACDB Scheme and function check.

10-DCDB Scheme and function check.

Protection relays Settings/Testing:

Complete test for bus bar protection function (REB 500 & SIEMENSE 7SS522):-

1- Bus bar differential protection.

2- Breaker fail protection.

3- End fault protection.

4- Low current mode.

Complete test for transformer protection function (SEL487E & SIEMENSE 7UT) :-

1- Differential protection function.

2- Restricted earth fault.

3- Over current Protection for H.V.S and L.V.S.

4- Neutral over Current Protection.

5- Sensitive Earth Fault Protection.

Complete test for line feeder protection function for both (double Bus Single Breaker) and ( Breaker and Half) Bus bar (SEL411L & SIEMSNSE 7SD):-

1.Line DIFF, Distance PROT,

2.Distance Scheme(POR,PUR,BLOCKING SCHEME),

3.SOTF.

4.VT Fuse fail.

5.Directional earth fault.

6.Directional earth fault scheme.

7.Synchro check.

8.Auto reclosure.

9.End to end test.

13.8KV Complete switchgear protection (ZIV, ABB REF615,GE F650, MICOM P139)

1-O/C

2-E/F

3-A/R

4-SYNCH- CHECK

5-Bus bar protection.

6-Bus bar stability

7-R.E.F.

Complete Testing For Load Shedding Protection (SEL451) (GE F650) (MICOM P142).

1- UVP (UNDER VOLTAGE).

2- UFP (UNDER VOLTAGE).

Complete Testing For AVR Control Relay (ZIV).

1-Bandwidth checking.

2-Runback voltage.

3-Regulation time checking.

4-O/C blocking.

5-Under voltage and voltage out of range blocking.

6-CID Configuration file according to scheme.

Complete Testing For Capacitor Protection Function (SEL487V, GE C70).

1-OCEF (over current and earth fault).

2-OV/UV (over voltage and under voltage).

3-Voltage deferential for grounded and ungrounded capacitor bank.

4-Current Unbalance

Relay programing and testing

RELAY TYPE

FUNCTION

MANUF.

REB500

BUS BAR PROTECTION

ABB

Siemens 7ss

BUS BAR PROTECTION

SIEMENSE

Siemens 7SD

LINE PROTECTION

SIEMENSE

Siemens 7VK61

AUTO RECLOSURE

SIEMENSE

SEL411L

LINE PROTECTION

SEL

SEL487E

TRANSFORMER DIFF. PROTECTION

SEL

SEL487V

CAPACITOR PROTECTION

SEL

SEL451

OCEF PROTECTION / BCU

SEL

ZIV

OCEF & AVR

ZIVERCOM

MICOM P142

OCEF, UV, AND UF

ALSTOM

GE C70

CABACITOR PROTECTION

GENERAL ELECTRIC

GE G60

GENERATOR PROTECTION

GENERAL ELECTRIC

ABB REF615

BCU / PROTN. OCEF

ABB

GE F650

BCU / PROTN. OCEF

GE

SIEMENSE 7UT

TR. DIFF PROTECTION

SIEMENS

RED670

LINE PROTECTION

ABB

MICOMP546

LINE PROTECTION

ALSTOM

Meters Calibration/Testing :

1-Ampere meter

2-KWH meter

3-Energy meters

4-Volt meter

Power Cables Testing :

1-Insulation Resistance Test

2-DC Hi pot Test

3-Power Frequency Withstand test

Employment Record and projects in Egypt:

Major Testing and Service Projects

Client: Giza North Generation Plant

Location: Giza North Cairo

Work description: - Testing and commissioning of Contract 101 combined cycle system

Included but not limited to

Generator terminal enclosure (CT’s,VT’s,NGT,NGR,…etc)

Excitation transformers

Isolation Transformers

Generator windings(stator and rotor)

All substation auxiliaries

G60 (generator protection Functions)

Employment Record and projects in Saudi Arabia:

1-Major testing and service projects

Client: Saudi electricity company (SEC)

Location: 132/13.8 Kv daubba-2 substation

2-Major testing and service projects

Client: Saudi electricity company (SEC)

Location: 132/13.8 Kv tabuk-4 existing substation.

3-Major testing and service projects

Client: Saudi electricity company (SEC)

Location: tabuk-2 existing substation.

4-Major testing and service projects

Client: Saudi electricity company (SEC)

Location: 110/13.8 kv Al-Barakah substation.

4-Major testing and service projects

Client: Saudi electricity company (SEC)

Location: 380/110/33/13.8 KV AL-MADINA MIC BSP S/S.

5-Major testing and service projects

Client: Saudi electricity company (SEC)

Location: 110/13.8 KV AL-RAWDA-2 S/S, JEDDAH.

5-Major testing and service projects

Client: Saudi electricity company (SEC)

Location: 110/13.8 KV AL-HADDA CENTER S/S, MAKKAH.

5-Major testing and service projects

Client: Saudi electricity company (SEC)

Location: 110/13.8 KV AL-GAYA (110/33KV) S/S, AL-TAIF.

5-Major testing and service projects

Client: Saudi electricity company (SEC)

Location: 110/13.8 KV AL-AZIZIAH-4 (110/13.8KV) S/S, MAKKAH.

Special Skills:

MS Office(WORD, EXCEL, POWER POINT)

ETAP.

AUTOCAD.

Adept in the computerized testing sets and their software used for different testing.

Trainings:

1- ELKORYMAT generation plant.

2- EGEMAC Company.

These courses were taken in Egypt:

1- Distribution systems level (1). (jelecom Egypt)

2- Distribution systems level (2). (jelecom Egypt)

3-programable logic control PLC level (1). (jelecom Egypt).

4-AutoCAD 2D. (Helwan University)

5- English conversation Course in Helwan University.



Contact this candidate