Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Riyadh, Saudi Arabia
Salary:
10000 SR
Posted:
August 08, 2018

Contact this candidate

Resume:

MUHAMMAD ASIF

ELECTRICAL ENGINEER

POSTAL ADDRESS: Morjan Mall Exit 6 Riyadh Saudi Arabia

Cell: 009**-*********

E-mail: ac6lnw@r.postjobfree.com

Iqama: Transferable

CAREER OBJECTIVE

Looking for Employment with an EPC organization in a challenging environment where I use myself education, experience and interpersonal skills to advance in a professional growth towards mutual benefits of the organization and myself own.

PROFESSIONAL QUALIFICATION

B.Sc Electrical Engineering (2005 to April 2009) CGPA 3.14/4

Federal Urdu University of Arts Science and Technology Islamabad.

slamabad.

SAUDI COUNCIL OF ENGINEERS:

Registration No. 345629

PAKISTAN ENGINEERING COUNCIL:

Registration Number: Elect/28044

SKILLS:

AutoCAD, MS Office (Word, Excel, Power Point), Internet and Email., Dialux for lighting.

International and local codes Familiarity:

NEC

ANSI/NEMA

NFPA

SASO

BS 7671

TECHNICAL EXPERIENCE AND SKILLS

More than 9 years of extensive hand on experience in design, detailed Engineering, Site management & project execution of Electrical (MV LV & Low Current) Systems in Construction Industry.

Company : ARABIAN McROMAN CONSTRUCTION AND SUPPORT EST. SAUDI ARABIA

Client : Ministry of Labor - Kingdom of Saudi Arabia

Consultant : Cooperative Office for Civil Engineering Consulting.

Position : Electrical Engineer

Project : MOL AND HRDF ZULFI & SHAQRA

Duration : From March 2017 to June 2018

JOB RESPONSIBILITIES

Inspecting work execution, installation, quality, testing & commissioning in accordance with project specs/drawings

Monitoring detailed engineering drawing reviews and follow up with project team progress to monitor that construction progress is aligned with technical drawings

Ensure coordination between Mechanical, Electrical, Civil, and Architecture to carry out required modifications and change orders

Exterior lighting system (lighting poles, fence wall lights)

Interior lighting system and lighting control system (KNX protocol and Presensors.)

Interior lighting system, emergency lights and exit lights on DALI lighting ballast network, Dimming.

Interacting & coordinating with client, vendors & other departments for the construction/completion activities.

Attending progress review meetings to resolve constraints and site-conflicts.

Create man power scheduling based on the volume of work assigned for each area and record the daily progress report on works completed.

Daily work monitoring on areas assigned, checked and review Issue for Construction drawings as per latest revision to ensure correct installation works will be done.

Raised RFI (Request for Inspection) for completed works.

Responsible for the Installation of RMU, 3000 KVA transformers, 2200KVA Generators, 800KVA UPS, Battery Bank and Panels

Responsible for the Installation of lighting system, power system(MDP,SDP,DP) underground and above ground conduits,EMT, cable trays, duct banks, Power for FCU & ACCU, Package Units,VAV's,Firefighting system power and data cables for Electrical system, communication and IT system.

Supervision and installation of low current systems as per low current designer and their recommendations. Fire Alarm system (simplex), IP CCTV system, Public Address, A/V system, Access control system, BMS, DATA and IT system

Project execution, monitoring, testing and commissioning like, HVAC, Plumbing (Drainage, water supply, Pumps & Firefighting),FM200 as per Compliance with the plan, Shop drawing, Specification Standard and Schedule.

Project reporting, Site Co-ordination, Client meeting and team Supervision.

Company : FAMCO RIYADH SAUDI ARABIA

Client : Alfanar Company

Consultant : Dar Engineering

Position : Electrical Engineer

Project : Alfanar Warehouse & Regional Office Building Khamis Mushait.

Duration : From Oct 2015 to March 2017.

JOB RESPONSIBILITIES

Study technical drawings (IFC/Tender drawing) and document (BOQ) and ensure that it is properly implemented in the project.

Preparing the shop drawings of Electrical system, Fire Alarm system, Data and IT system, CCTV system and Access control system and submitted to consultant for approval.

Preparing of Panel load Schedule and Single line Diagram (SLD) and submitting to Consultant for approval.

Preparing all technical Submittal for electrical material to be used or installed at the project as per consultant/client approval

Control all Site Observation report (SOR), and Non conformance reports (NCR) and undertake remedial action.

Monitor and Inspect all material/ Equipment received on site and check with them approved submittal.

Preparation of Material Inspection Report MIR (Material delivered at site) and getting approval from Consultant.

Internal inspection of all electrical work and raised the Request for Inspection (RFI) to Consultant for executed work at site

Review of Client Site Instruction (SI) and incorporating in shop drawing.

Coordinate with the site construction manager on all quality issues and weekly site meeting with Consultant.

Complete site quality control instructions and action remedial responses.

Prepare Daily and weekly report and submitted to consultant.

Supervision of Concrete encasement duct bank for underground power cable as per standard and specification..

Perform electrical wiring system testing such as continuity test, Ring continuity test and Insulation resistance (IR) test.

Testing of Grounding and Lightening Protection system as per standard and specification.

Inspecting the Fiber optic cable testing (OTDR), Fluke testing for CAT6

Perform Electrical Test such as Insulation Resistance (IR) Test, Phase rotation test, and for 13.8KV& 4.16KV High, Medium and Low Voltage, Switchgear, Power cables, and Transformer.

Monitoring and Inspection of the following activities at site:

•.Installation and testing of all electrical system

•.Installation of switchgear, transformer, MDB, DB,s Socket Outlet and switches

•.Installation of Safety Disconnect Switches for Roof Ventilators,Pressurerization Fan, Air Package Units, HVAC,Fire Fighting and Split AC,s

•.Installation and testing of power cables and wires, lighting, Emergency lighting, Telephone and Data, Access control System (KABA), Fire Alarm system (Gent Vigilon by Honeywell) and Raymax, Ray lux, IP CCTV system (Arecont Vision)

•.Installation and testing of grounding and lightning protection system

•.Installation of PVC conduits, EMT conduits, cable tray and cable trucking.

•.Installation of Floor Boxes, Service Box, Weatherproof boxes,WP sockets and switches.

•.Take remedial action against Snag list of Electrical work from consultant and deficiencies noted and take corrective measure against facility mentioned in snag list.

Receives and maintained all controlled documents such as Site instruction, method statements, site quality plan, quantity take-off (QTO) plan and inspection test plan (ITP).

Ensure that appropriate instruction derived from the documents is given to the personnel who will execute the job.

Co-ordination with Consultant for queries of electrical system as per site condition (Modification/Changes).

Ensure that all safety precaution was given while executing the job.

Preparing the As Built drawings of Electrical system, Fire Alarm system, Data and IT system, CCTV system and Access control system and submitted to consultant for approval.

Submitting the Project Handover documents, testing and commissioning reports, Operation and maintenance manuals and Spare part list to Consultant.

Implementation of the safety activities and safety plan at site.

Company : Power Solution Company Lahore Pakistan

Client : Coca Cola Beverages Pvt. Ltd. Pakistan

Position : Project Engineer

Projects : 36K Pet Line CCBPL Lahore

36K Pet Line CCBPL Gujranwala

24 K Pet Line CCBPL Rahim Yar Khan

Duration : From April 2013 to August 2015

JOB RESPONSIBILITIES

To represent and lead the project team at site.

To coordinate with team and subcontractors for delivery of project within the time.

Prepare progress report on daily and monthly bases.

Technical Discussions with customer & End User.

Interaction with Head office for Additional Support (Technical as well as Commercial)

Develop and executes business plans to increase revenue and maximize margin in line with organization goals.,

Experience in developing project scope (budgets, timelines and delivery dates)

Experience in identifying the project risks as early as possible in project execution, and mitigate those risks in conjunction with Line Manager

Experience in preparing project plan/schedule using tools and processes adopted by the company and manage it during the execution of project

Leading the project team at execution side Erection and Installation of automated production line involving PET Bottles line, RGB line ( Blow molding machine, Filler, Labeler, shrink wrapping, Palletizer, dating and coding machine, Caps feeding machine, Conveyer ) Utilities ( 10bar, 40bar compressors, NH3 compressor, water treatment, )

Perform and supervision the Erection, installation and Commissioning of LT Panels, transformers, LVR, Industrial UPS (500KVA, 800KVA), ATS System.

Perform insulation resistance test, Continuity test, earthing test and prepare the all test reports.

Ensuring the safety standards at site to achive ZERO downtime accident.

Company : Flowtronix Pvt. Ltd. Lahore Pakistan

Client : Ibrahim Fiber Ltd. Pakistan

Position : Project Engineer

Project : IFL Polyester Plant Walcott III (600 Ton)

Duration : From June 2012 to March 2013

Responsibilities:

Planning-Staffing-Leading-Organizing.

Interpret Electrical details of Shop drawing and relate them to Supervisors.

Mobilizing staff, manpower and material.

Analyzing the material stock and Order the material in proper time.

Installation of Electrical and Instrumentation work at site as per design, specification and Schedule.

Cables 11KV/0.44KV including testing, jointing and Termination.

Insulation resistance test and continuity test of LV Cable

Phase sequence test of LV and MV cable and High Potential test of MV Cables

Prepare daily progress report and discuss it with project manager and Client.

Experienced in the Erection and Installation of LT Panels, Ring Main of MV,Simocode Pro Panels, Rectifier and Inverter Panels, MCC Panels, Breaking Resistors, Transformers, Cable Ladder,Perforated tray, Earthling/Grounding, cables Laying and Termination of LT, HT and Indoor and Outdoor termination Kits.

Supervision of the Erection and Installation of Instrument Panels and Field Instruments, Conduits, Air Headers, Pneumatic Piping, Control Valves, Isolating Valves, RTD,Pressure transmitter, Pressure Gauges, Bimetallic temperature indicator Level switches, Level Transmitters, Temperature switches, Flow Indicator, Heat controller,etc.

Supervision of laying and termination of SS and Copper Tubing, Fieldbus,Devicebus,DeviceNet, Control cables, Heat tracing cable, fiber optic cables.

Company : Power Solution Company Lahore Pakistan

Client : Coca Cola Beverages Pvt. Ltd. Pakistan

Position : Site Engineer

Projects : Hot Fill Pulpy Juice Line CCBPL Lahore

AL MATY 36K Pet line and RGB 60K Krones Line CCBPL Lahore Pakistan

Husky Hypet (200) and Hypet (300) Machines, HVAC (300 Ton) Unit, 400KVA,500KVA,800KVA UPS in CCBPL Lahore Pakistan.

Duration : From 15 January 2010 to 31 May 2012

Responsibilities:

Responsible for the Erection and installation of Switchgear, LT Panels, Lighting System, Lightening Protection System, Step down transformers,11kv Regulators, Cable Ladder Installation, Conduits Installation, Panels Installation, Instrument Installation, Cable Laying, Termination, Testing and commissioning.

Installation and maintenance work of lights at plant and other sales centers

Perform and supervision of insulation resistance test, Polarity test, Continuity test, Earth resistance test.

Prepare and forward accurate reports concerning conditions, actions taken or required, result obtained.

Company : Hydro Electric Board Muzaffrabad Govt. of AJ&K

Position : Assistant Electrical Engineer

Project : 1.7MW Hydro Power Plant Kotli AJ&K.

Duration : From 14 April 2009 to October 2009

Responsibilities:

Prepare and forward accurate reports concerning conditions, actions taken or required, result obtained.

To Lead, Plan Supervise, Perform all the Installation of the Projects.

Supervising all operation activities of project.

Create and maintain project documents and reports.

Collect update information from field staff and reporting to Project Director.

PERSONAL INFORMATION

Father's Name : Rangbaz Khan

Date of Birth : 25 December, 1987

Nationality : Pakistani

CNIC No : 81202-4767836-5

Passport No : BS1888362

PEC No : Elect/28044

Marital Status : Married



Contact this candidate