Post Job Free
Sign in

Engineer Design Engineer

Location:
Bowie, MD
Salary:
85,000.00
Posted:
August 07, 2018

Contact this candidate

Resume:

Moruph Kennedy Nimney

Electrical Design Engineer

**** *******-*** *****, *****, MD., 20721

Cell – 240-***-****

*****-********@*****.***

OBJECTIVES: To design lighting, power, telecommunications and security systems for new, renovated or remodel government buildings, facilities, high rises, schools and residential buildings in accordance with all applicable codes such as National Electrical Code (NEC), International Building Code (IBC), International Energy Conservation Code (IECC), NFPA Standards, GSA Standards (P-100 Design Guideline) as well as (AHJ) local authority having jurisdiction. Work with local utility companies to coordinate new power and telecommunications service or minimize downtime on existing service during construction. Review electrical specifications, contractor submittal including value engineering studies.

(CADD) computer aided design and drafting projects using latest versions of Autocad, Microstation and Revit BIM. Perform lighting calculations using latest version of Visual lighting program.

EMPLOYMENT HISTORY:

SETTY & Associates International, PLLC - Feb. 2016 – June 2018

3040 Williams Drive, Suite 600, Fairfax, VA. 22030

URS Corporation (AECOM), Washington, DC. Nov. 1995 – May 2015

2020 K Street. N.W. Suite 300, Washington, DC, 20006

Elect. Dept. Supervisor, Ashok Maheshwari P.E. 202-***-****, may be contacted.

Project Specific Experience:

Arlington Fire Station #10, Arlington, VA.

Electrical designer Engineer for the new 3 story 100,000 square feet Arlington Fire Station #10. The new fire station was designed as part of residential 26 story luxury apartment building in Arlington Virginia. Developer allocated fire station space for Arlington County Government. Date: 08/2017- 2018 Permit Phase

Bread for the City, Washington, DC.

Electrical designer Engineer for the new 6 story 600,000 square feet Social Services building for the nonprofit organization and Government of the District of Columbia. Date: 02/2016 - 2017 CD Phase

Walter Reed, Washington, DC.

Electrical designer Engineer for the renovation of the 4 story 20,000 square feet building for private developer. Date: 05/2016

Georgetown Visitation Preparatory School, Washington, DC.

Electrical designer Engineer for the renovation of Berchmans Hall and St. Joseph Library totaling 60,000 square feet . Date: 06/2016

American University, Anderson Hall, Washington, DC.

Electrical designer Engineer for the renovation of over 800,000 square feet student dormitory and administrative building. Date: 09/2016 Ongoing (Phase 1&2)

American University, Katzen and Kreeger, Washington, DC.

Electrical designer Engineer for the renovation of both buildings with combine squre footage of over 100,000 square feet. Date: 09/2016

Stethem Elementary School, Pompeii, Charles County, MD.

Electrical designer Engineer for the new school pump station. Project entails demolition of existing pump station, design new on generator emergency power

Date: 01/2017

World Bank, Washington, DC.

Electrical designer Engineer for several World Bank office buildings renovation.

Date: 02/2017- On Going Projects

United States Air force Base, (AFCEC) Hanger Fire Evaluation.

US Air force retained URS to perform facility condition assessment of all aircraft hangers all over the world to determine reason for the false activation of the fire suppression system inside the aircraft hangers. The scope of work includes documentation of all fire suppression and electrical systems within the aircraft hangers and adjoining buildings. Produce new construction document per NEC, UFC, and Air force Standards. Site visited are Andrews AFB, MD., Dover AFB, DE., Cannon AFB, NM., JAB AK., King Salmon AFB AK, Shemya Island AFB, AK and Thule AFB in Greenland. Date: 07/2014 - 11/2014

Veteran Administration Hospital, State of Pennsylvania. VISN 4

Facility Condition Assessment.

VA Administration retained URS to perform facility condition assessment at all twelve (12) VA hospital sites in the state of Pennsylvania. The scope of work includes surveying all electrical and telecommunication systems, reviewing existing as-built construction documents and cost estimating for all deficiencies observed. Date: 2013-2014

Architect of the Capitol, Washington D.C.

URS was the designer of record for various office building renovations on Capitol Hill. The scope of the electrical system work included upgrading power distribution systems, designing new lighting at the garage of the Longworth office building, new lighting at Cannon office building, Cafeteria/ Kitchen upgrade at James Madison and Rayburn office buildings. Most projects required renovation/modification of existing systems while other projects focused on replacement/upgrade of the existing systems to bring them up to current national and local building codes as well as AOC design standards. Date: 07/2007

Various Renovation Projects for Smithsonian Institute, Washington D.C.

URS was the designer of record for various renovations and power upgrade at Smithsonian Institute. Projects include replacement of the Switchgear project at the mall site as well as roof replacement / upgrading lightning protection at the NMAI (National Museum of the American Indian) located in Suitland MD. The scope of the electrical work at the NMAI was upgrading the existing facility lightning protection to meet NFPA 780 standards and recertification.

Date: 10/2012

Armed Forces Retired Home (AFRH), Gulfport, Mississippi.

Electrical and telecommunications design engineer for the new $300 million dollars Armed Forces Retirement Home – Gulfport, Mississippi.

URS, in association with Yates Construction, was retained to design and construct the new 660,000 square foot retirement home facility on the existing site of approximately 47 acres. The facility will accommodate 584 residents, secured parking garage for approximately 400 vehicles, and support facilities.

The electrical and telecommunication engineering design services related to this project includes layout of the power and telecommunications distribution systems. Emergency power service was designed to provide emergency power for seven continuous days.

The project also includes reviewing architectural plans, design guidelines using International Building Code, International Electrical Code, NFPA Standards, Unified Facilities Criteria (UFC) and GSA Standards (P-100 Design Guideline). Date: 7/2007 – 12/2012

Ministry Of Public Health (MOPH), Kabul, Afghanistan.

Electrical and telecommunication design engineer for the new $50 million dollars campus-like office complex. Date: 06/2009 – 12/2010

Ghazi Boys High School, Kabul, Afghanistan.

Electrical and telecommunication design engineer for the new $3.5 million dollars high school complex. Date: 01/2011 – 12/2011

Kessler Air force Base, Biloxi, MS

Electrical and telecommunication design engineer for the renovation of the base after hurricane Katrina. Date: 08/2005

Charity Hospital, New Orleans, LA

Survey of the electrical system at the hospital after the devastation of hurricane Katrina. Date: 2006

U.S. Pentagon, Lower Level Renovation, Arlington, Virginia.

Electrical designer for phased renovation of a major portion of the Pentagon basement. Conducted extensive field survey work of the existing site conditions, and designed new utility tunnels and trenches to service 14 new mechanical rooms. Mechanical scope also included master planning and distribution of central steam, chilled water, and domestic water and fire protection water systems throughout the entire 6,500,000 sq. ft. Pentagon. Date: 1996 – 12/2001

National Archives Building, Washington, DC.

Electrical designer for the new lighting and power system as part of the complete renovation of the historic 1,400,000 sq ft National Archives Building on Pennsylvania Avenue. The building was originally opened in 1935, and the electrical systems, as well as other building systems, were deteriorated and in need of replacement. Date: 11/2010

Renovation of the U.S. Patent Office Building, Smithsonian Institution, Washington, DC.

Electrical designer for a major renovation of the 800,000 sq ft historic landmark building, long considered one of America’s most important examples of Greek revival architecture. New mechanical systems were designed to fit within the existing architectural context and respect the building’s historic fabric. Date: 12/2011

Renovation of Main Treasury Building, Washington, DC.

Electrical designer for the modernization of the 502,000 sq ft Main Treasury Building occupying a site adjacent to the White House at 15th Street and Pennsylvania Avenue.

Security System Upgrades IRS Office Buildings in Connecticut, New York, Boston, Tennessee and Florida

Security system designer responsible for designing new/upgraded security systems, including CCTV monitoring, entry system control, intrusion detection system, panic alarm and perimeter monitoring. Date: 2009 – 12/2010

PCS Wireless telecommunications system: (1995-2010).

AT&T Wireless, A/E Services for Modifications to 68 Wireless Communication Sites, Washington / Baltimore Metropolitan Area

Design engineer responsible for power and telephone systems for upgrades to PCS sites throughout the region. URS received commendations for outstanding A/E drawings produced on this project by the County of Fairfax, Virginia; City of Alexandria, Virginia and the Virginia Department of Transportation.

Nextel Communications, A/E and Construction Management Services for 2,500 ESMR Sites, Washington / Baltimore Metropolitan Area.

Design engineer responsible for power and telephone systems for sites including raw land, rooftops, stealth and co-locates.

Sprint PCS, A/E Services for the Build out of 50 PCS Sites, Washington / Baltimore Metropolitan Area. Sites including rooftops, raw land, monopoles / towers and water tanks. Balloon tests and photo simulations have been performed in addition to designing the sites to allow for future expansion.

Bell South/ Cingular, A/E Services for 150 PCS Sites throughout the States of Florida and Georgia. Design engineer responsible for the design of power and telephone systems.

EDUCATION:

Southeastern University

B.S. Degree - Computer Science / Information System Management

University of Liberia

College of Science and Technology

Electrical Engineering

COMPUTER SKILLS:

PC Operating Systems, Microsoft Office, Outlook and Internet.

Computer aided drafting programs, Autocad, Microstation and Revit BIM.

Visual lighting calculation program.

TRAINING:

FEMA disaster training, Dulles, VA. 2010

Confirmed Space training, steam tunnel,

Architect of the Capitol Washington, DC. 2013

Value Engineering Seminar, URS Corp. 2010



Contact this candidate