Kourosh Moghimi
**** ****** ******* ***., **** B, Pleasanton, CA, 94588, Tel: +1-858-***-****
U.S. Work Authorization: Fully Authorized (Green Card Holder) kourosh *******@*****.***
PROFESSIONAL SUMMARY
Technical Project Manager with 10+ years of experience managing multi-million dollars con- struction projects and leading multi-disciplinary teams with over 1,200 employees. KEY SKILLS
knowledge of Project & Construction Management systems; understanding of cost control
& risk mitigation.
Expertise in Construction Means and methods, Scheduling & Estimating, Budgeting & forecasting, Value Engineering and Roadway inspection & maintenance.
Skilled in Infrastructure,Heavy civil engineering & Highway construction, Deep foundation, excavation, Shoring and Retaining systems,
Pro cient in Auto CAD, Microsoft O ce. Familiar with ScketchUp, Revit & Navisworks.
Fluent in English, Farsi and Russian (spoken)
PROFESSIONAL EXPERIENCE
Founder and Managing Director Sep. 2011 Oct. 2017 ATRAK pst Co., Mashhad, Iran
Among the top 3 successful Construction companies utilized and specialized in Deep foundation, Piling, Soil Remediation, Excavation, Shoring & Retaining systems.
Managed and trained a technical team of 25 employees in quality construction methods, interpersonal and client communications which improved the e ciency and performance in
awless project completion.
Led implementation of new cutting-edge deep foundation technology such as drilling ma- chinery and Piling rigs, equipment and tools
Drilled and constructed more than 300,000 ft.(LDP, CFA, CPA,CSP) driven piles in several infrastructure projects country-wide such as: 6 Metro stations in Mashhad, Shiraz and Isfahan.
15 interchanges in Mashhad, Tehran, Shiraz, Bandar Abas, Neyshabour and Ghouchan Co-Founder and Managing Director Sep. 2009 Aug. 2011 AHP Co., Tehran, Iran
Construction company specialized in Deep foundation, Soil excavation & Retaining systems.
Managed and oversaw construction of deep foundation, piling and retaining systems at several large scale infrastructure projects that list of some of them are as follows: 5 interchanges in Mashhad and Tabriz - Oroomieh Highway Bridges over Hari Rud, Jakigor and Golestan rivers Area Director & Senior Project Manager Sep. 2005 Aug. 2010 Abad Rahan Pars (ARP) International Group, Tehran, Iran Leading gure in Infrastructure EPC construction sector, design and execution of Highways, wa- ter structures, installation and commissioning of oil, gas and petrochemical Engineering design.
Restarted the stopped Herat - Maymaneh Main Road project. Resolved technical and inter personal con
icts between the client(DOT), company and third parties at my start up in this company.
Recovered incurred delays and met the dead line by prioritizing tasks; reduced concrete curing process from 28 days to 1 by implementation hot steam treating systems on 4 multi- span bridge construction locations to eliminate delays caused by extreme cold weather.
I exceeded the budgetary and performance goals in Rehabilitation of 124 Km Herat - Torgondi Main road in Afghanistan project by making a very precise revision & changing the Road super structure speci cation and asphalt pavement design; I saved %20 in time and USD1.3M cost reduction.
Planned work scheduling, recommended technical proposals, made revisions in reinforced concrete design of the bridge decks and culverts from cast in situ to pre-cast elements. I accelerated the project completion by increasing the earthwork performance and hitting the record of 25000 m3 a day, thereby delivered the project in time and brought in $4.5M early completion incentive bonus despite the unexpected obstacles and challenges in construction of Sangan - Herat railway construction project.
Succeeded to perform the construction of the following international projects in Afghanistan: 1. Herat-Maymaneh Main Road: 60 km $80,015,000
2. Herat-Torgondi Main Road: (Rehabilitation) 124 km $30,000,000 3. Sangan-Herat Railroad:(Lot1) 64 km $116,137,000 4. Herat International Airport: Part of Runway and Aprons Director Mar. 2003 Sep. 2005
Polsang Sanandaj, Tehran, Iran
One of the top 10 construction companies in the region Over the past 60 years specialized in Highways, Bridge, Dam, Metro and also Residential construction sector.
Led construction of a 13-story Javad international Hotel valued at USD43M. To develop and maintain safety & compliance standards and reduce the sliding risk of the historic adjacent buildings into the deep excavated area and minimizing hazards; built part of the hotel building tower leveraging Top-down technique. Senior Project Manager Apr. 1984 Sep. 2002
Dobral Co., Tehran, Iran
One of the top & most successful companies in Iran in Infrastructure construction sector. pio- neer in exporting the Engineering and Technical services beyond Iranian borders.
Accelerated the bridge construction performance by% 80 and saved %25 in project com- pletion time by establishing temporary concrete batching plants in Neyshabour- Mashhad Highway construction project.
Successfully managed the completion of 22 miles challenging Ashkabad- Gaudan highway construction project including its 4,600,000+ m3 trench cut by applying a precise time management, scheduling, and earthwork optimization process that cut delivery time by%10
Projects:
1. Ashkabat-Gaudan Highway: 35 km, $ 17,500,000 - 4,600,000 m3 open trench cut, 24 months
2. Ashkabat-Geoktepe Freeway: (EPC) 50 km, $ 50,000,000 - 800 000 tons as- phalt paving, 30 months
3. Geoktepe-Baharden Freeway: (EPC) 45 km,$ 45,000,000 - 700 000 tons as- phalt paving, 30 months
4. Baharden-Archman Freeway: (EPC) 26 km,$ 26,000,000 - 400 000 tons as- phalt paving, 18 months
5. Makhtoomgoli-Turkmenbashi Underground Shopping Mall in Ashkabat:
(EPC) 2600 m2, 7 months
6. Fooman-Mianneh Main Road : Lot 5 & 6 - 81 km.
7. Nishabour-Mashhad Main Road: Lot 61 & 62 - 57 km. EDUCATION
Certi cate Program in Construction Management Jan. 2018 Present UC Berkeley Extension, Berkeley, CA
Bachelor of Business Management Sept. 1974 May 1978 Faculty of Mass Communication (FMC), Tehran, Iran
Ranked as one of the top universities o ering Mass communication in Iran. RELEVANT COURSES TAKEN SO FAR
UC Berkeley Extension:
Management in Construction Industry.
Schedule Delay Analysis and Construction Claims.
Introduction to BIM.
Preconstruction Estimating.
Fundamentals of Construction Law.