Post Job Free
Sign in

Electrical Engineer

Location:
Ferndale, MI
Posted:
August 05, 2018

Contact this candidate

Resume:

Isaac Norton Ferndale, MI ***** 248-***-**** ******.*****@*******.***

Professional Summary

Detail-oriented Electrical/Chemical Engineer with 2 years of engineering experience. Practical experience in small scale circuit design, hardware and software troubleshooting/testing, and design FMEA creation. Confident working in multidisciplinary teams and with both engineering and skilled trades staff.

Education

Wayne State University Graduation Date: May 2018

Bachelor of Science - Electrical Engineering GPA: 3.17

Wayne State University Graduation Date: May 2011

Bachelor of Science - Chemical Engineering GPA: 3.29

Oakland Community College Graduation Date: April 2008

Associates of Science

Relevant Coursework

Circuits, Electronics, Digital Logic, Electric Fields and Waves, C++, Electric Fields and Waves, Linear Systems & Signals, Introduction to Communications, Electrical Energy Systems, Controls

Engineering Projects

Chemical Engineering Project, Wayne State University Completed Winter 2011

As part of a 3 person team designed a plant to produce biodiesel using Aspen HYSYS to simulate the reaction

Performed cost analysis to determine expected profit and ROI

Determined plant location based on supply criteria and cost assessment

Skills

Programs: Matlab, Labview, Simulink, C++, Arduino, Microsoft Word, Excel, PowerPoint, Outlook

Engineering: FMEA, Design of Experiments

Work Experience

Faurecia Engineering Intern August 2015 - August 2016

Performed design FMEA on new and existing products as part of a cross functional team

Researched industry best practices for products including capacitive touch screens and LCD displays

Designed and performed durability testing for new products

Assisted in the construction and maintenance of prototypes and demonstrators

Generated BOMs for products and used existing BOM to reduce cost by comparing supplier part prices

Belle Tire Tire Technician July 2012 - June 2014

Prioritize the completion of time critical work

Performed safety and basic shop procedure training for new employees

Inspected the wheels, tires and undercarriage of vehicles and communicate needs to sales staff and customers

DTE Energy Associate Chemical Engineer October 2011 - February 2012

Implemented contaminated wastewater incineration system resulting in $500k cost avoidance

Performed water system walkdown and troubleshooting as part of planned shutdown

Determined operation status of water analysis system and prioritized repair work for plant engineer



Contact this candidate