Post Job Free

Resume

Sign in

Mechanical Engineer Power Plant

Location:
Hollywood, FL
Salary:
$30000-45000
Posted:
July 26, 2018

Contact this candidate

Resume:

Objective:

To obtain a position Mechanical Engineer (Project Designer), AutoCAD Engineer in the field of Com.Construction, Energy.

Summary

• About fifteen years of experience with thermal and mechanical equipment (for steam, water, gas fuel, diesel fuel, air, plumbing, HVAC), technical design and working project documentation (working drawings) and construction project budget in the field of construction and renovation of Power plants (260-1200MWt).

• Knowledge of Steam Generation power plant equipment including boiler, turbine, generator

• Admit my mistakes.

• More than six years of management experience.

• Proficient with MS Office, Windows, AutoCAD, Prime Expert, Primavera and the Internet, Adobe Acrobat

• English: level A2-B1 (Pre-Intermediate – Intermediate)

Education:

• Certificate AutoCAD Designer

Training center “AutoCAD Classes Miami” 9380 SW 72nd St. Suite B221 Miami, FL, 33173 http://www.autocad-classes.com/

• Mechanical Engineer (Heating Engineer) of thermal and mechanical equipment of thermal power plants

National Research University "Moscow Power Engineering Institute" (MPEI), 2010

http://mpei.ru/lang/en/Pages/default.aspx

• Economist in the field of Energy

Moscow State Open University, 2002.

• Mechanical Engineer.

Orenburg State University, 1999.

Work Experience

• TEK Mosenergo (The Customer of construction of TPP), Moscow, http://tekmosenergo.ru/en/

nov.2015 – feb 2018

Position: Senior Mechanical Engineer

• design (AutoCAD) and analyze technical design and working project documentation (detailed drawings and schematics, prepares system layout, specifications, installation drawing, construction drawing, etc) of the General designer for the construction of power plants in Russia (Krasnodar CCGT-TPP, Yamal CCGT-TPP);

• analyze technical proposals (offers) on delivery of mechanical equipment for thermal power plants (pumps, valves (regulation and bypass valves, valve with pilot operated and other), cooling tower, pipelines, HVAC, plumbing, fire protection design);

• analyze technical documentation for equipment from Manufacturers (P&ID, technical data sheets, manuals, installation documentation, etc. documentation)

• identified and corrected over five major design errors in the working project documentation;

• identified over ten major design errors in the Technical documentation of equipment from Manufacturers (deviations from the required parameters, deviations from the sets of equipment, proposed wrong materials of the equipment, etc.);

• proposed and implemented of over four technical solutions for optimization working project documentation (in the fire protection system, cooling system, fuel supply system) resulting in savings of $1.5 million;

• participation in shaping (forming) of procurement plan of mechanical equipment and construction schedule of TPP, prepares bid tabulations on complex purchases;

• preparation of budget of the power plant construction;

• participation in inspections of plants (factories) making equipment;

• participation in the testing of mechanical equipment;

• developed a small program (on the basis of Excel) to check equipment and hydraulic losses in pipelines.

• E4 Group JSC (The Customer and General contractor for the construction of TPP), Moscow, http://www.e4group.ru/en/

aug.2010 – march 2015

Position: Senior Mechanical Engineer. Chief of technological division.

• The management of technological division;

• analyzed technical proposals (offers) on delivery of mechanical equipment for thermal power plants (pumps, valves (regulation and bypass valves, valve with pilot operated and other), Air compressor, high pressure gas compressor, cooling tower, pipelines, equipment of HVAC, plumbing, fire protection design);

• analyzed technical documentation for equipment from Manufacturers (P&ID, technical data sheets, manuals, installation documentation, etc. documentation);

• participation in shaping (forming) of procurement plan of mechanical equipment and construction schedule of TPP, prepares bid tabulations on complex purchases;

• preparation of budget of the power plant construction;

• participation in inspections of plants (factories) making equipment;

• participation in the testing of mechanical equipment;

• identified and corrected over ten major design errors in the working project documentation;

• identified over twenty major design errors in the Technical documentation of Manufacturers for equipment (deviations from the required parameters, deviations from the sets of equipment, proposed wrong materials of the equipment, etc.);

• proposed and implemented of over ten technical solutions for optimization working project documentation (in the fire protection system, cooling system, fuel supply system) resulting in savings of $1.5 million;

• developed technical specifications for the manufacture of thermal mechanical equipment

• perform engineering studies to evaluate customer needs and develop alternative solutions that will be technically sound and economically feasible.

• Moscow Integrated Power Company JSC (The Customer of construction of TPP), Moscow, http://www.moek.ru/ru/

march 2009 – aug.2010

Position: Chief of technological division of construction and reconstruction.

• analyzed technical design and working project documentation (working drawings) of the General designer for the construction and reconstruction of power plants and thermal power station in Moscow (Strogino CCGT-TPP, Rublevskaya TPS);

• analyzed technical documentation for equipment from Manufacturers (P&ID, technical data sheets, manuals, installation documentation, etc. documentation);

• participation in shaping (forming) of procurement plan of mechanical equipment and construction schedule of TPP;

• participation in the testing of mechanical equipment

• All-Russia Thermal Engineering Institute (Design Institute.), Moscow, http://vti.ru/en/

march 2003 – dec.2008

Position: Mechanical Engineer. Сhief project engineer. Chief of technological division.

• The management and coordination of technical design and working project works for the construction of power plants in Russia (Combined cycle gas turbine unit, A steam turbine thermal power plant);

• calculated parameters of thermal mechanical equipment;

• developed technical specifications of thermal mechanical equipment for the manufacture;

• participation in design (drafting) of technical design and working project works (AutoCAD);

• created working project documentation (detailed drawings and schematics, prepares system layout, specifications, installation drawing, construction drawing, etc);

• calculated variable costs and fixed operating costs, Calculated investment cost;

• calculated economic efficiency for construction of power plants.

Honors:

• Recognized as the best specialist company (three times)

• Graduated Magna Cum Laude with a GPA of 4.8 on a 5.0 scale

Interests

• My Family, Gymnastic exercises, Jogging, Reading.

References

• Available upon request



Contact this candidate