PERSONAL
Surname : Maneli
Full Names : Songezo
Address : ** ********* *****, ******, *********
Telephone : +27-792******
Date of Birth : 04 June 1981
Sex : Male
Marital Status : Single
Ethnic Group : Methodist
Nationality : South African
Home Language : Xhosa
Identity Number : 810**********
Passport Number : A00578906
Driver’s License : None
Health : Excellent
Availability : Immediate
Hobbies : Movies, Soccer, Music
EDUCATION
Ulwazi high 1994- 1999
Highest Standard Passed: National Senior Certificate
Subjects: Afrikaans, English, Xhosa, Biology,
Accounting, Business Economics
Northink College 2007-2009
NQF Level 4 Technical Fitting
COURSES
•Chemical Fitting NQF Level 2
• SAQA Registration number:13673(MAN253-13673)
•Chemical Fitting NQF Level 3
•SAQA Registration number :13672(MAN253-13672)
• Chemical Fitting NQF Level 4
•SAQA Registration number:13656(MAN253-13656)
EMPLOYMENT HISTORY – RELEVANT
S.N.C LAVALIN (SHUTDOWN 2017) July – October 2017
Place: Sasol Secunda
Position: Mechanical Fitter
Reference Mrs. Elza Prinsloo (HR)
Contact Number +278********
Job Description:
Piping (Blinding & deblinding of lines)
Removing & installing control valves
Overhauling, Columns, Fin, Fans & heat exchangers
Pressure testing
Cleaning filters & Strainers
GROUP 5 OIL AND GAS (SHUTDOWN 2017) CHEVRON SA February – May 2017
Place: Chevron
Position: Mechanical Fitter
Reference Mrs. Cheryl Garmey (HR)
Contact Number +272********
Job Description:
Piping (Blinding & deblinding of lines)
Removing & installing control valves
Overhauling Columns, Fin fans & and heat exchangers
Pressure testing
CAPACITY (ANKERIG POWER STATION OUTAGE) July 2016 – January 2017
Place: Ankerlig Power Station
Position: Mechanical Fitter
Reference Mrs. Tersia Calvert (HR)
Contact Number +272********
Job Description:
Overhauling of gas turbines
Piping (Blinding of lines)
Overhauling & Assembling of Rotor
Pressure testing
CAPE AFRICA (ROTEK) (PALMIET POWER STATION OUTAGE) May – July 2016
Place: Palmiet Power Station
Position: Mechanical Fitter
Reference Mr. Niresh (Site Agent)
Contact Number +278********
Job Description:
Repair spherical valve
Piping (Blinding & deblinding of lines)
Removing & installing control valves
Pressure testing
KENTZ (A.M.T PLACEMENTS) (SHUTDOWN 2015) August – October 2015
Place: Sasol Secunda
Position: Mechanical Fitter
Reference Mrs. L Van De Berg (HR)
Contact Number +271********
Job Description:
Piping (Blinding & deblinding of pipes)
Removing & installing control valves
Pressure testing
Overhauling columns & Fin Fans
GROUP 5 OIL AND GAS (SHUTDOWN 2015) CHEVRON SA February – May 2015
Place: Chevron
Position: Mechanical Fitter
Reference Mrs. Cheryl Garmey (HR)
Contact Number +272********
Job Description:
Piping (Blinding & deblinding of Pipes)
Removing & installing control valves
Overhauling Columns, Fin fans & and heat exchangers
Pressure testing
KENTZ (A.M.T PLACEMENTS) (SHUTDOWN 2014) August – October 2014
Place: Sasol Secunda
Position: Mechanical Fitter
Reference Mrs. L Van De Berg (HR)
Contact Number +271********
Job Description:
Piping (Blinding & deblinging of lines)
Removing & installing control valves
Overhauling, dismantling and commissioning heat exchangers
Pressure testing
GROUP 5 OIL AND GAS (SHUTDOWN 2014) CHEVRON SA February – May 2014
Place: Chevron
Position: Mechanical Fitter
Reference Mrs. Cheryl Garmey (HR)
Contact Number +272********
Job Description:
Piping (Blinding & deblinding of lines)
Removing & installing control valves
Overhauling, dismantling and commissioning heat exchangers
Pressure testing
GROUP 5 OIL AND GAS (2013 TURNAROUND) CHEVRON SA 2013 October-2013 December
Position: Mechanical Fitter
Job Description:
-Removing and installing mechanical valves
-Overhauling and pulling and installing of trays in columns
-Overhauling and repairing heat exchangers
-Pressure testing
-Overhauling fin fan banks
-Pulling and installation of blinds and blanks
A.M.T (KENTZ ENGINEERINGS) 2014-23August-19October
Sasol-Mpumalanga-Shutdown: 2013 July-2013September
Position: Mechanical Fitter
Job Description:
•Removing and installing safety and instrument valves
•Overhauling and removing trays from the columns
•Repairing heat exchangers
•Overhauling fin fan banks
•Pressure testing
•putting and installing of blanks
JOHN THOMPSON BOILER AND ENVIRONMENT SOLUTIONS
Killombero Sugar Mill/Illovo
Tanzania 2013 March-2013 June
Position: Semi-skilled
Job Description:
•Removing and installing valves
•cutting of tubes
•Preparing and installing of new tubes
•preparing using cutting torch and grinder
•Pressure testing
•Installing Internals
GROUP 5 OIL AND GAS-SHUTDOWN 2010 and2012
Position: Mechanical Fitter
Job Description:
•Removing and installing mechanical and instrument valves
•Overhauling Columns and vessels
•Overhauling and repairing heat exchangers
•Overhauling fin fan banks
•Pressure testing
•blinding off equipments
JOHN THOMPSON BOILER AND ENVIRONMENT SOLUTIONS 2012/March/26-2012/December/15
Position: `
Job Description:
•Remove and install mechanical valves
•Remove and install tubes
•Clean and prepare tubes
•overhaul mud drum and steam drum
•fabrication
•Basic rigging
•Installing Internals
CAPE TOWN REFINERY (CHEVRON S.A) 2011/APRIL/30-2012/April/3
Position: Semi-skilled fitter
Job Description:
•Removing and replacing mechanical valves
•Overhaul and repair heat exchangers
•Remove and repair indirect drives
•Overhaul Pumps
Cape Town Refinery (Chevron SA) 2007/10/02-2009/12/11
Position: Mechanical Fitter Trainee
Job Description:
•Removing and replacing mechanical valves
•Fault finding on Hydraulics Systems
•Find Faults on Power Transmissions
•Overhaul Pumps
•Remove and repair indirect drives
•Overhaul Compressors
•0verhaul and repair heat exchangers
•Basic Rigging
REFERENCES
Mr. Steven Harper
Managing Director in charge of Chevron and Learning and development
Cell: 082-***-****
Mr. Thulani Mabanga
Learning and Development Co-coordinator
Chevron South Africa (Pty) limited
Direct Tel: +27-21-508-****
Direct Fax: +27-21-508-****
E-Mail:****@*******.***
Mr. J Wagner
Site Manager: Group 5 Oil and Gas
Tel: +27-21-508-****
Fax: +27-21-551-****
Mr. T Dube
Forman 2013 Turnaround and Shutdown
Group 5 Oil and Gas
Cell: +27-73-590*-***
Mr. Joe Smith
Site manager john Thompson Boiler and Environment Solutions
Cell: +27-83-441*-***
Mrs. Cheryl Garmey
HR Group 5 Oil and Gas
Tell: +27-21-508-****
Tell: +27-21-508-****
Mrs. L Van De Berg
AMT Placements (Kent Engineerings)
Human Resource
Tell: +27-17-634*-***
Cell: 078*******
Mr Tebogo Molaesti
AMT Placements(Kentz Engineerings)
Formen 2014 shutdown
Cell:073*******