OBJECTIVES & ACHIEVEMENTS

Cost effective Project Management with Client and Critical Path focus

Comprehensive experience in the key areas of Construction, Cost Control, Quality Auditing, Project, & Engineering Management including Facility Commissioning, Start-up, Estimating, and Engineering excellence.

Primary Focus: Over 18 Years Project, Construction Project and Regulatory Management experience in construction completion activities to gain governmental (AHJ) acceptance for projects under construction.

Process Intensive Applications include: Process Safety, Smoke/Fire Protection, and Leak Detection Process Systems & Controls, design & construction for Commercial Buildings, Quality & ISO Quality Auditing of High Tech Facilities, and Government Laboratories.

Construction Management, experience is gained from successful completion of over 14 High tech. facilities and technically challenging Mission Critical Facilities, support projects, located worldwide.

“On-time” schedule stewardship to deliver technically complex Mechanical Utility Systems, Process Piping & Ductwork, including Facility Commissioning, QC/QA, Safety, & ISO Auditing challenges.

Successful assignments have included Projects, successfully completed for IBM, AMD, INTEL, NEC, Motorola, Applied Materials, Pacificorp, SunPower, BP Solar, SIX Semiconductor, and Hyundai (HSA).

DIRECT PROJECT MANAGEMENT EMPLOYMENT EXPERIENCE

Project, Program, & Construction Management

ADITI for INTEL Corp, at Ronler Acres, 2501 NE Century Blvd, Hillsboro, OR 97124, Project Manager managing RA1 SEO Laboratory Tool Move-In activities for Tool and Electronic Component, Process & Performance testing. 4-25-2017 to 08-11-2017.

Procedure Solutions for NextEra Energy Corp., located at 700 Universe Blvd, Juno Beach, FL, ($13.6 Million) Construction Manager, successfully managing construction and completion of a 5.61 MW, 47 Acre, Solar Energy Power Generation Facility for the Pacificorp, managed, Local Utility Power Grid, in Bly, OR. 08-2015 to 08-2016.

Minimax Fire Solutions, 3025 Independence Drive, Livermore, CA, Project Manager, managing installation of critical Fire Protection equipment and Alarm Systems for the Power Industry, located around the US, 10-2014 to 02-11-2015.

Abbie Gregg Inc. 1130 E. University Dr., Tempe, AZ, at Matec Engineering located in Moema, Sao Paulo, Brazil, Semiconductor, and Design Engineering Consultant & Construction Mgr. for a new Semiconductor Fab being built in Belo Horizonte, Brazil, 10-2012 to 06-2013.

Siemens Energy at 411 Commercial Parkway, in Broussard, LA, Project Manager managing Oil and Gas Industry, Water Treatment and Oil separation technology Construction projects, including Cost Control and Quality monitoring 07-2011 to 10-2012

ATS Duct Products at Sun Power, Melaka Malaysia, ($12.0 Million) Project Manager coordinatinginstallation of Base build and Hookup Installed Ductwork and Component, Progress Reporting, Client Interface, Cost Management, and Installed Product Quality Monitoring. 05-2010 to 01-2011

Energime Corporation Inc., Everett WA, Sr. Project Manager, Managing Process Design, & Engineering for Conceptual Design Development efforts for new Alternative Energy Projects and Business Development activities. 10-2009 to 05-2010.

Worldwater and Solar Technologies, ($13.6 Million) DIA Denver, Sr. Program Manager for managing installation of Nine (9) Solar Arrays, producing 2 Megawatt of Solar Power for the Denver International Airport in Denver CO, 09-2007 to 02 -2008

Meissner+Wurst US Operations, AMD Fab 25 Austin, TX, Tool Hookup Construction, Cost Control, Quality Auditing, and Safety Program Management, Austin TX, 1994 to 1995

J.E. Sirrine/CRS Sirrine Intel Fab 7 & 9, Code compliance engineering, Process Safety Program

Auditing, & Quality management, Rio Rancho NM, 1994

Smith Scheuch Engineering, Motorola MOS 6, Facility renovation and Sandia National Laboratories Code Compliance engineering, 1992 to 1993

Fluor Daniel Inc., NEC Megaline Facility, Project Management, Process Safety Auditing, and Quality Audit Management completed, Roseville CA, 1988 to 1992

Stearns Roger/Catalytic Inc., Process Designs for Multi-million dollar Conventional Energy and Power Generation projects, 1981 to 1986

Bechtel Power Corporation, Five (5) Multi-million dollar Conventional Power and Nuclear Energy projects, 1974 to 1981

Contract Project and Commissioning Management

McQueen Consulting Services L.L.C. 1996 to Present Eugene, OR

Yoh Engineering Contract Construction Manager for Boeing Corp., Facility Site Services Group, Everett, WA ($1.36 Million), Mar. 2007 to Sept. 2007

Contract Management, QC/QA Auditing, Commissioning & Construction Project Manager for Boeing Company, Commercial Aircraft Division Site Services Group

Management of Five (5) Facilities Construction Project Cost control, for Flight line, and Hanger Renovation Construction Projects managing steel erection, utilities installation, renovation, plumbing, and electrical modifications, including project cost control and quality management.

INTEL Corp., Fab 28, Lachish Site Facility, Qiryat Gat, Israel, for MW-Zander

($1 Billion), Sept. 2006 to Jan. 2007

Commissioning Project Manager for MW-Zander UK Ltd. at Intel Fab 28

Design Verification (DV) and Operational Inspection Testing (OIT) coordination, Commissioning management Documents preparation, SPR Closeout, QC/QA & Process Safety Auditing, and Acceptance Inspection.

Commissioning efforts culminated in the successful achievement of the Cleanroom Makeup Air Handler Blow down #1 Progress milestone, on-time, per Project Schedule.

INTEL Corp., Fab 23, Garden of the Gods, Colorado Springs, CO, for Johnson Controls Inc. ($59,000 PM & Commissioning Labor Contract), Dec. 2005 to Apr. 2006

Successfully managed construction completion, cost control & completion auditing, commissioning, permitting and turnover of a multi-nodal centrally controlled and ionization detection Fire Protection and VESDA Smoke detection system for (2) two Semiconductor Fabs, and (5) five Intel site campus, process support buildings.

Univ. of Nevada at Reno, Nano-Lab Project ($50,000 Project Contract), Nov. 2003 to Apr. 2004

Laboratory Const. Cost. Control &, Project Management Services, per City & “AHJ” requirements

Commissioning, Performance inspections, Cost Auditing & Quality Assurance reporting

Fire Protection, Building Code Compliance Consulting, and Safety Management for successful renovation of the Nano-Technology Research Laboratory at the UNR Stead Campu

CCONTRACT PROJECT MANAGEMENT EXPERIENCE

BP Solar, (EC1) Project ($375 Million), Sept. 2002 to May 2003

Managed construction, providing equipment cost, safety, & quality auditing to complete the Acid exhaust duct system, for the project, under budget and per scheduled completion guidelines.

Exhaust sys, scrubber installation, & commissioning, successfully completed per schedule

Cost estimating & Administration of all MCS Contract PM Personnel resources for the BP Solar Project, located in Tres Cantos, Spain

Obayashi Construction, Applied Materials Tech. Center ($425 Million), 2000 to 2001

Applied Materials Project Superintendent and Subcontract Manager

Supervised all construction subcontract personnel, project cost, & completion activities, and provided quality auditing services to complete the Fluoride and Acid Waste Neutralization treatment facility

Successfully obtained a Certificate of Occupancy (TCO) for the completed Applied Material’s Technology Center Project, in 9 Months

Applied Mechanical Consulting Group, ($760 Million), 2000

Project Manager providing process safety audit reporting, repair recommendations

Code Compliance consulting efforts supporting Bechtel China, as a Project Manager

Green field Chemical Management System installation & Cost Estimating, at the Motorola MOS 17 Project site, under construction in Tianjin, PRC

Hyundai Semiconductor America HSA, Eugene, ($780 Million), 1996 to 1998

Code Compliance Consulting, Design review, including Cost Control & Quality management support

Safety & ISO audit activities, including Commissioning, Startup, and Operational Management

EDUCATION

B.S. in Chemistry, Grand Valley State, 1972 Allendale, Michigan,

Major: Analytical Chemistry, Minor: English Composition

Engineering Thermodynamics, Graduate Level coursework, Colorado State University, Denver, Colorado SURGE Program (Site campus) Personal development

Environmental Engineering, Graduate Level coursework, Brooklyn PolytechnicInstitute of NY, Brooklyn, NY Personal Development

CERTIFICATIONS, SOFTWARE/LANGUAGE/OFFICE SKILLS

Certified HAZOP Instructor, 1991 Certified OSHA 500 Safety Instructor, 1995

Certified Q/A & ISO Auditor, 1996

French Language Skills: Reading & Writing with Moderate Proficiency

MS Office 2016 MS Word 2016 MS Excel 2016 MS Project 2016 Autocad MS PowerPoint 2016 MS Access 2016 MS Outlook 2016 Primavera P6