Objective: To be a part of the progressive organization that gives me an opportunity to explore my knowledge and skills, involved as a part of the team that works in the interest of the organization and gains satisfaction thereof.

Having 08 Years Experience in field of Project Execution, Testing, commissioning, operation & maintenance of Automation & Electrical Equipment connected with as like Power plant in Different Organization.

Career Summary

PRESENT WORKING EXPERIENCE

Organization : Vardhman Fabrics, Budhni (MP)

(Integrated Textile Plant)

Designation : Engineer Electrical

Duration : Since 28th Oct. 2013 to Till Date

Company Profile: The Company is having 24 MW Power Plant, Spinning, Weaving & Processing unit

Job Profile:

Involve in the maintenance of 24 MW CPP, 132 /11 KV Switchyard, (30 X 2) MVA Transformer, 11 KV Switchgear Panel, LT Panels PCC & MCC, VFD, Battery charger & Motor etc. Electrical Work & Planning Strategies.

Preparation and Monitoring of the MIS.

Planning for Preventive – Predictive Maintenance.

Interaction with related Vendors.

Follow-up with Purchase Department.

Inventory and cost control.

Managing the shift Manpower and allocate manpower as per plant requirement.

Involment in E & T program and participate in training Schedule & sharing knowledge with juniors and gain with seniors.

Monitoring Electrical parameter like as 24 MW Alternator, 132/11kvGrid etc.

Work in NOW software like as purchase order, material inventory

Fully responsible in shutdown Maintenance & No. of project.

Involve in power saving scheme.

Responsible member in 5s,TPM and do more then one kaizen for plant betterment.

Responsible for maintenance & operation of ESP Transformer & Controller (make-Hirect)

Recommendation of supplier (for Electrical and control portion) for Motors, Transformers, MCC, PCC.

Operation & Maintenance work of Electrical equipment like as - soft starter & VFD,LT Motors( up to 400 KW

Conduct frequent routine checks around the unit to observe any abnormalities in the unit.

Responsible in testing of protective relay and complete testing done as per operating program.

Operation & Maintenance work of HT Breaker (make - ABB), LT Breaker (Siemens ) and outdoor HT breaker

Operation & Maintenance of HT DG set (5 X 2MVA) sync. With STG & Grid power and LT DG set for Emergency lighting purpose. (Make -Caterpillar)

Handling each and every shift Activity.

Achievements:(Project)

Load shedding scheme design and implementation.

Synchronization system project done.

Complete Erection And commissioning of 30 MVA Make-ABB Power Transformer .

Complete Erection and commissioning of CCTV camera.

Involve in brainstorming for Power saving scheme.

Complete Erection and commissioning of Thermic fluid Heater

Complete commissioning of smoke detecting system.

Past Assignments - I

Organization : MSP Steel & Power Ltd. Raigarh(CG)

Village- Jamgao, Raigarh ( C.G. )

(Integrated steel plant)

Designation : Junior Engineer Electrical

Duration : Since 1st March 2011 to 20th Oct.2013.

Company Profile: - MSP Group is one of the Leading Steel Producer in the state of Chhattisgarh under Secondary Sector with its Participation in manufacturing activities Sponge Iron, SMS & Ferro Alloys. Flat Product, construction bar, light structures with the most moderate & latest technology with Permutation set up & means with the Annual Turnover of Rs. 1200 Crore.

Job Profile:

Involve in the maintenance of 3X12MW, 1X18MW CPP, 132 /11 KV Switchyard, 2X50 TPH & 36 TPH AFBC, 3X38 TPH WHRB, 50, 30 & 25 MVA Transformer, 11 KV Switch-gear Panel, LT Panels PCC & MCC, VFD, Battery charger & Motor etc. Electrical Work & Planning Strategies.

Installation and maintenance of DOL & STAR - DELTA starters

Preparation of the Power Report And PM /CM schedule.

Experience in MCC & PCC control wiring, DOL, RDOL, and Star-Delta starters control wiring and knowledge in cable laying system and ear things system

Inspection & Monitoring of Battery Chargers, Battery Banks etc.

Transformer & switch-gears i.e. Breakers (HT & LT), Protection relays.

Maintenance & Testing of Transformers oil it’s up to 30 MVA.

Operation & Maintenance work of Electrical equipment like as - soft starter & VFD, LT Motors( up to 400 KW.

Conduct frequent routine checks around the unit to observe any abnormalities in the unit.

Achivenent:(Project)

Complete erection & commissioning of Siemens make Turbine with 34 MW TDPS make Generator, 135 TPH CFBC Boiler .

Complete erection & commissioning of Shoot blower system in 36 TPH WHRB Boiler.

Complete erection & commissioning load shadding system.

Complete erection & commissioning of Trivani make 12 MW Turbine.

Past Assignments - II

Organization : Oriental Green Power

Village- Chipabarod, Baran ( Raj )

(Biomass Power plant)

Designation : DET Electrical

Duration : Since 4th Sep. 2010 to 25th Feb. 2011.

Company Profile: - 8 MW Biomass based Export Power plant .

EDUCATIONAL CREDENTIALS

AMIE in Electrical Engineering,2018 with 6.3 GPA.

Diploma (Electrical Engineering), 2010 with 69.61 %

From Govt. Polytechnic College, Jhalawar (Rajasthan)

I have Electrical Supervisor license which is issue by M.P Electricity Board Authority in 2017.

SECONDARY SCHOOL CERTIFICATE EXAM (10th), 2006 with 72.5%

From Board of Rajasthan

Computer Skills

Ms-Office, WINDOWS-98/XP/VISTA/7, & Internet Applications

PERSONAL PROFILE

Name : Vipin Agrawal

Date of Birth : Oct 10, 1991

Sex : Male

Proficient in : Hindi, English & Rajasthani

Last Salary Drawn : 5.0 Lacks P/A

Expected Salary : Negotiable

Passport Detail

Passport no. : N8880712

Expiry date : 20/06/2026

DECLARATION

I hereby declare that the above information is true to the best of my knowledge.

Date:-19/08/2018 VIPIN AGRAWAL



Contact this candidate