WAQAS.BAJWA***@GMI
L.COM
OFICEACT***@OUTL
OOK.COM
OFICEACT365@OUTL
OOK.COM
PORTFOLIO
Substation & Medium Voltage
Networks
Worth: 2-3 Million SAR
I. Project securing
II. Procurement,
III. Installation as per
SEC standards
and client’s
coordination
Up to 33 KV Networks
2012-2015
Worth: 12-16 Million SAR
Day and Night Shifts,
Emergency Tasking,
Sub-Contracting,
Market Outsourcing to
keep undue progression.
Attracting point scoring
investment, never
compromising workers’
spirit.
Each workers’ portfolio
carefully studied, so tasks
distributed as per their
best of abilities.
Various software
management techniques
used to synchronise work
environment.
WAQAS BAJWA
POWER ELECTRICAL AND ELECTRONICS ENGINEER
RIYADH, SAUDI ARABIA.
EXPERIENCE
ELECTRICAL ENGINEER • SERVICES & SOLUTIONS • 2012 – 2017 Transmission and Distribution Projects Supervision. Design planning, implementations procedures finalizing decisions, accomplishment of the core structural requirements.
• Team composition, assigning task milestones, pursuing client’s over expected demand.
• Supply chain management, a skill to timely manage and schedule material implementation.
• Cost analysis and accurately producing billing quantity as per project completion plan.
ELECTRICAL ENGINEER •SITAF•FUJITSU•SERVICES & SOLUTIONS • 2012 – 2017
A team of 30 to 40 people in three to four groups worked under me. Separate teams for Electrical, Civil, Telecommunication, and Safety.
WAQAS BAJWA
POWER ELECTRICAL AND ELECTRONICS ENGINEER
WAQAS.BAJWA140@GMI
L.COM
OFICEACT365@OUTL
OOK.COM
OFICEACT365@OUTL
OOK.COM
PORTFOLIO
FTTH Projects
2011-2012
Worth: 1-2 Million SAR
End Point Services
Experienced installation
of technical infrastructure
Performance based
LEARNING STAIR
Nationality Pakistani
Be Vested In Riyadh
Project Coordination
Design finalization
Site surveys
Procurement
Material Management & Transportation
On Site Installation Supervision
Civil Works
As-built drawings
Final Documentation
Billing End Procedure
EDUCATION
BENG (ELECTRICAL & ELECTRONICS) • 2015/16 • UNIVERSITY OF PORTSMOUTH
Final thesis was a very close work based, ’Reliability Evaluation of Substations and Medium Voltage Networks’. Design of presently known best smart equipment ratings through simulation. A slight struggle to raise awareness of never availed synchronization. i. Load losses
ii. faulty design
iii. protection system analysis
iv. static and dynamic systems’ reliability of a power station. v. Power factor Calculations
vi. Additions of Capacitors to reduce power factor vii. Economic losses related to power factor
viii. Capacitor addition charges, and corresponding reduction in bills
Last but not the least
Thermal Imaging Fault Finding Techniques rather than traditional ones. A brief look into 3D Transformer Testing Personal Portfolio of a
29-Year-Old
Fresher
WAQAS BAJWA
POWER ELECTRICAL AND ELECTRONICS ENGINEER
WAQAS.BAJWA140@GMI
L.COM
OFICEACT365@OUTL
OOK.COM
OFICEACT365@OUTL
OOK.COM
• Worked in Middle East, Saudi
Arabia. From Southern to
Central to Western
Constituencies.
1. English Literature
1.1. Adult Literacy
Level 1(City & Guilds)
1.2. Adult Literacy
Level 2 (City & Guilds)
1.3. GCSE
2. Local Literature
• The principles of
Management
• The indecency of a strict
routine, inside and
outside workpalace
• The good nature of free
market
• The very interrogative
market, and the hidden
strategy for solutions
• The art of Engineering
• Engineering free flow
Information
• Absolute control of asset
flow, the record
management
BENG (ELECTRICAL & ELECTRONICS) •2015/16 • UNIVERSITY OF PORTSMOUTH
Signal Processing Techniques with the help of Matlab. The sampling strategies, density probability function to differentiate a good part of batch from bad ones.
• AFTER SUCCESSFULL COMPLETION OF A LEVELS FROM
(ENGLAND) ( 3 SUBJECTS )
• COMPLETION OF O LEVELS FROM CHAND BAGH SCHOO (Full Course)
VOLUNTEER EXPERIENCE OR LEADERSHIP
There supposed to be a politics awareness project. We managed to arrange a team from each department. Each dedicated a group of 12 in numbers. The collaboration of groups gathered on a expertise based platform.
Each team dispatched to promote the so told political agenda.
Each team won at least one candidate.
Our ten point based political framework was chosen among the best and considered to be nominated for
federal political agendas.
WAQAS BAJWA
POWER ELECTRICAL AND ELECTRONICS ENGINEER
WAQAS.BAJWA140@GMI
L.COM
OFICEACT365@OUTL
OOK.COM
OFICEACT365@OUTL
OOK.COM
Scientific Research
Newsletters
The arc flash path
judgment techniques, to assume
the type and intensity, and
necessary steps to avoid any
aftermath.
FEW OF THE PROJECTS UNDERTAKEN
1. 33kv Medium Voltage Networks
1.1. 13.8 KV Medium Voltage Networks, end to end
installations
1. 512 Fiber Distribution Terminals
2. 256 FDTs
3. Fiber to Home, Fiber to Building
3.1. Area capacity finalization, installation location and procedure finalization
FEW OF THE PROJECTS FEASIBILITY STUDIED
• 380 KV Substation Protection Analysis
• 380 KV Substation Load losses Analysis
• 380 KV Substation Load Demand Analysis
• High Voltage Electrical Assets Failure and Life Aging Analysis, the dynamic systems synchorinsation
• Grid Lines Circuitry Analysis (Generation,
Transmission And Distribution stations)
WAQAS BAJWA
POWER ELECTRICAL AND ELECTRONICS ENGINEER
WAQAS.BAJWA140@GMI
L.COM
OFICEACT365@OUTL
OOK.COM
OFICEACT365@OUTL
OOK.COM
SKILLS
RATINGS R A T I N G S
Skill Level 5 4 3 2 1
Industrial Applications
Ms Office
Autocad
Ms Project
Matlab
Other assistant applications
Language
English
Arabic
Urdu
Attained Skills
Optimum Team Requirements plan as per Scope of Work Market Cost Analysis as per Scope of Work
Post Work Order follow up Scheme
Material Acquisition as per Customer Requirement Installation as per Material Acquisition
Minutes of Meeting
Supervision as per SEC Standard
Database Production per work order
Final And Weekly Progress Report
FTTH Project implementation Plan
MS Project Scheduled Milestones & Accomplishments Redundancy Plans
Backup Plans
Finalising and Producing Completion Drawings