Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Riyadh, Saudi Arabia
Posted:
September 20, 2018

Contact this candidate

Resume:

WAQAS.BAJWA***@GMI

L.COM

OFICEACT***@OUTL

OOK.COM

+966-*********

WHATSAPP

OFICEACT365@OUTL

OOK.COM

PORTFOLIO

Substation & Medium Voltage

Networks

****-****

Worth: 2-3 Million SAR

I. Project securing

II. Procurement,

III. Installation as per

SEC standards

and client’s

coordination

Up to 33 KV Networks

2012-2015

Worth: 12-16 Million SAR

Day and Night Shifts,

Emergency Tasking,

Sub-Contracting,

Market Outsourcing to

keep undue progression.

Attracting point scoring

investment, never

compromising workers’

spirit.

Each workers’ portfolio

carefully studied, so tasks

distributed as per their

best of abilities.

Various software

management techniques

used to synchronise work

environment.

WAQAS BAJWA

POWER ELECTRICAL AND ELECTRONICS ENGINEER

RIYADH, SAUDI ARABIA.

EXPERIENCE

ELECTRICAL ENGINEER • SERVICES & SOLUTIONS • 2012 – 2017 Transmission and Distribution Projects Supervision. Design planning, implementations procedures finalizing decisions, accomplishment of the core structural requirements.

• Team composition, assigning task milestones, pursuing client’s over expected demand.

• Supply chain management, a skill to timely manage and schedule material implementation.

• Cost analysis and accurately producing billing quantity as per project completion plan.

ELECTRICAL ENGINEER •SITAF•FUJITSU•SERVICES & SOLUTIONS • 2012 – 2017

A team of 30 to 40 people in three to four groups worked under me. Separate teams for Electrical, Civil, Telecommunication, and Safety.

WAQAS BAJWA

POWER ELECTRICAL AND ELECTRONICS ENGINEER

WAQAS.BAJWA140@GMI

L.COM

OFICEACT365@OUTL

OOK.COM

+966-*********

WHATSAPP

OFICEACT365@OUTL

OOK.COM

PORTFOLIO

FTTH Projects

2011-2012

Worth: 1-2 Million SAR

End Point Services

Experienced installation

of technical infrastructure

Performance based

LEARNING STAIR

Nationality Pakistani

Be Vested In Riyadh

Project Coordination

Design finalization

Site surveys

Procurement

Material Management & Transportation

On Site Installation Supervision

Civil Works

As-built drawings

Final Documentation

Billing End Procedure

EDUCATION

BENG (ELECTRICAL & ELECTRONICS) • 2015/16 • UNIVERSITY OF PORTSMOUTH

Final thesis was a very close work based, ’Reliability Evaluation of Substations and Medium Voltage Networks’. Design of presently known best smart equipment ratings through simulation. A slight struggle to raise awareness of never availed synchronization. i. Load losses

ii. faulty design

iii. protection system analysis

iv. static and dynamic systems’ reliability of a power station. v. Power factor Calculations

vi. Additions of Capacitors to reduce power factor vii. Economic losses related to power factor

viii. Capacitor addition charges, and corresponding reduction in bills

Last but not the least

Thermal Imaging Fault Finding Techniques rather than traditional ones. A brief look into 3D Transformer Testing Personal Portfolio of a

29-Year-Old

Fresher

WAQAS BAJWA

POWER ELECTRICAL AND ELECTRONICS ENGINEER

WAQAS.BAJWA140@GMI

L.COM

OFICEACT365@OUTL

OOK.COM

+966-*********

WHATSAPP

OFICEACT365@OUTL

OOK.COM

• Worked in Middle East, Saudi

Arabia. From Southern to

Central to Western

Constituencies.

1. English Literature

1.1. Adult Literacy

Level 1(City & Guilds)

1.2. Adult Literacy

Level 2 (City & Guilds)

1.3. GCSE

2. Local Literature

• The principles of

Management

• The indecency of a strict

routine, inside and

outside workpalace

• The good nature of free

market

• The very interrogative

market, and the hidden

strategy for solutions

• The art of Engineering

• Engineering free flow

Information

• Absolute control of asset

flow, the record

management

BENG (ELECTRICAL & ELECTRONICS) •2015/16 • UNIVERSITY OF PORTSMOUTH

Signal Processing Techniques with the help of Matlab. The sampling strategies, density probability function to differentiate a good part of batch from bad ones.

• AFTER SUCCESSFULL COMPLETION OF A LEVELS FROM

(ENGLAND) ( 3 SUBJECTS )

• COMPLETION OF O LEVELS FROM CHAND BAGH SCHOO (Full Course)

VOLUNTEER EXPERIENCE OR LEADERSHIP

There supposed to be a politics awareness project. We managed to arrange a team from each department. Each dedicated a group of 12 in numbers. The collaboration of groups gathered on a expertise based platform.

Each team dispatched to promote the so told political agenda.

Each team won at least one candidate.

Our ten point based political framework was chosen among the best and considered to be nominated for

federal political agendas.

WAQAS BAJWA

POWER ELECTRICAL AND ELECTRONICS ENGINEER

WAQAS.BAJWA140@GMI

L.COM

OFICEACT365@OUTL

OOK.COM

+966-*********

WHATSAPP

OFICEACT365@OUTL

OOK.COM

Scientific Research

Newsletters

The arc flash path

judgment techniques, to assume

the type and intensity, and

necessary steps to avoid any

aftermath.

FEW OF THE PROJECTS UNDERTAKEN

1. 33kv Medium Voltage Networks

1.1. 13.8 KV Medium Voltage Networks, end to end

installations

1. 512 Fiber Distribution Terminals

2. 256 FDTs

3. Fiber to Home, Fiber to Building

3.1. Area capacity finalization, installation location and procedure finalization

FEW OF THE PROJECTS FEASIBILITY STUDIED

• 380 KV Substation Protection Analysis

• 380 KV Substation Load losses Analysis

• 380 KV Substation Load Demand Analysis

• High Voltage Electrical Assets Failure and Life Aging Analysis, the dynamic systems synchorinsation

• Grid Lines Circuitry Analysis (Generation,

Transmission And Distribution stations)

WAQAS BAJWA

POWER ELECTRICAL AND ELECTRONICS ENGINEER

WAQAS.BAJWA140@GMI

L.COM

OFICEACT365@OUTL

OOK.COM

+966-*********

WHATSAPP

OFICEACT365@OUTL

OOK.COM

SKILLS

RATINGS R A T I N G S

Skill Level 5 4 3 2 1

Industrial Applications

Ms Office

Autocad

Ms Project

Matlab

Other assistant applications

Language

English

Arabic

Urdu

Attained Skills

Optimum Team Requirements plan as per Scope of Work Market Cost Analysis as per Scope of Work

Post Work Order follow up Scheme

Material Acquisition as per Customer Requirement Installation as per Material Acquisition

Minutes of Meeting

Supervision as per SEC Standard

Database Production per work order

Final And Weekly Progress Report

FTTH Project implementation Plan

MS Project Scheduled Milestones & Accomplishments Redundancy Plans

Backup Plans

Finalising and Producing Completion Drawings



Contact this candidate