Post Job Free

Resume

Sign in

Electrical Engineer Power Plant

Location:
Basingstoke, England, United Kingdom
Posted:
September 16, 2018

Contact this candidate

Resume:

Page *

CURRICULUM VITAE

NAME

JAYAPRAKASH NALADI

POSITION

PRINCIPAL ELECTRICAL

ENGINEER

DATE & PLACE OF BIRTH

**/*/**

NATIONALITY

INDIAN

EDUCATION

S.S.C. – FIRST CLASS PASS

INTERMEDIATE – FIRST CLASS PASS

B.Tech. – FIRST CLASS PASS

M.E. (POWER SYSTEM ENGINEERING) – FIRST CLASS PASS PROFESSIONAL REGISTRATION & MEMBERSHIP :

C Eng & MIET

LANGUAGE - MOTHER

TELUGU

FOREIGN

ENGLISH

SUMMARY OF EXPERIENCE

30 years of electrical engineering experience in the Oil & Gas, Fertiliser, Chemicals and Material Handling industries on FEED and EPC projects in the UK, Nigeria and India. This has covered electrical design, inspection, installation and commissioning. Electrical design experience includes calculations, power system studies, equipment specifications/datasheets, Single Line Diagrams, layouts etc. Familiar with managing the issues involved in plant refurbishment/addition of new loads to existing networks. Mail ID : ac62j6@r.postjobfree.com

Mobile Phone : 077********

Page 2

NAME

JAYAPRAKASH NALADI

Eniprogetti. (JANUARY 2004 - PRESENT)

Principal Electrical Engineer

Lead Electrical Engineer

Floating Independent Power Plant (FIPP)

Concept Study :

Scope of work is to prepare Single Line Diagram for two Options i.e. Four GTGs & Four GTGs + HRSGs + STG.

Major Equipment involved in this project:

- 11 kV Generators.

- 132 kV GIS.

- 50 MVA Transformers.

- 132 kV XLPE/EPR Cables.

Lead Electrical Engineer

Takoradi-Tema Interface Project (TTIP), Ghana

FEED :

Electrical Load Balance, Single Line Diagrams, Cable Routing Layouts, Electrical Design Criteria, MTOs.

Major Equipment involved in this project:

11kV Overhead Line (HOLD), 6 kV / 0.40 kV switchgear, 0.63 MVA Transformer, 0.63 MVA Gas Engine Generator / Emergency DG, MV/LV XLPE Cables, AC UPS. Electrical Engineer (PMS) – Part Time

Onshore Receiving Facility (ORF), Ghana

PMS (EPIC):

Review of Documents / Drawings of EPIC Documentation. Scope includes the following Documentation for ORF Plant, Pilot Camp and Helipad : Single Line Diagrams, Electrical Layouts, Electrical Load Balance, Technical Data Sheets, Equipment (Generator, Transformer, UPS) Sizing Calculations, Power System Study (LF, SC, MS) Reports, Package Documentation.

Lead Electrical Engineer

LNG Storage Plant, Livorno, Italy

FEED :

Electrical Design Criteria, Electrical Load Balance, Single Line Diagram, Electrical Cable List, Layout, MTO.

Page 3

NAME

JAYAPRAKASH NALADI

Major Equipment involved in this project:

15 kV / 0.40 kV switchgear, 15/0.42 kV, 2.50 MVA Transformers, MV/LV XLPE Cables, Electrical Management System (EMS), 1.25 MVA Gas Engine Generators, 0.625 MVA Emergency DG, AC UPS.

Electrical Engineer

Onshore Receiving Facility (ORF), Ghana

FEED :

Electrical Load Balance, Single Line Diagrams, Layouts, Specification for main electrical equipment, TDS for MV Switchboards, Transformers, Neutral Earthing Resistors, etc., Cable List, MTOs.

Major Equipment involved in this project:

6kV Diesel Engine Driven Generators, 6 kV / 0.40 kV switchgear, 6/0.42 kV, 2.50 MVA Transformers, MV/LV XLPE Cables, Electrical Management System (EMS), 1.6 MVA (1.28 MW) Emergency DG, AC UPS.

Lead Electrical Engineer

Cote Mateve Oil Terminal, Republic of Congo

FEED :

Electrical Load List / Balance, Single Line Diagrams, Layouts, Specification for main electrical equipment, TDS for MV Switchboards, Transformers, Neutral Earthing Transformers / Resistors, 220 kV Outdoor Switchyard Spare Bay, etc., Power System Studies using ETAP, Cable List, MTOs.

Major Equipment involved in this project:

220 kV Outdoor Switchyard Spare Bay, 30 kV / 6 kV / 0.40 kV switchgear, 220/31.5 kV, 129 MVA, 31.5/6 kV, 10/12.5 (ONAN/ONAF) MVA, 6/0.42 kV, 2.5 & 1.6 MVA Transformers, MV/LV XLPE Cables, Electrical Management System (EMS), 1.6 MVA (1.28 MW) Emergency DG, AC UPS.

Lead Electrical Engineer

Power Plant Project, Mozambique

FEED :

Electrical Load List / Summary, Single Line Diagrams, Layouts, Specification for main electrical equipment, TDS for MV Switchboard, Transformers, Neutral Earthing Transformers / Resistors, 110 kV Outdoor Switchyard, etc., Power System Studies using ETAP, Earthing System Calculations using CYMEGRD.

Page 4

NAME

JAYAPRAKASH NALADI

Major Equipment involved in this project:

11 kV Diesel Engine driven Generators, 110 kV Outdoor Switchyard33 kV / 11 kV / 0.40 kV switchgear115/34.5/11 kV, 75/75/75 (ONAF) MVA, 11/0.42/0.42 kV, 6.3/3.15/3.15 (ONAN) MVA Power Transformers, 33/11 kV XLPE Cables, Integrated Control and Safety System

(ICSS), 2.5 MVA Emergency DG, AC UPS.

Lead Electrical Engineer

Burun Field Oil Development

Detailed Engineering of Phase I :

Electrical Load List / Summary; Single Line Diagrams; Layouts; Specification for electrical equipment; TDS/IDS/DDS for Switchboards, Transformers, Neutral Earthing Resistors, 110 kV Overhead Line, 110 kV Outdoor Switchyard, etc.; Review of Documentation from EPC Contractor for SS-22A; Power System Studies using ETAP; Earthing System Calculations using CYMEGRD; Lightning Protection System Calculations. Major Equipment involved in this project:

110 kV Overhead Line, 110 kV Outdoor Switchyard, 10 kV / 6 kV / 0.38 kV switchgear 110/10.5 kV, 30 MVA, 10/6.3 kV, 10 MVA and other Power Transformers, 10/6 kV XLPE Cables, Power Control and Monitoring System, 2.5/1.6/1.25 MVA Emergency DG, AC / DC UPS.

Lead Electrical Engineer

Hewett Gas Storage & Disinvestment Project at Bacton. Disinvestment Engineering: MTO & Scope of Work documents for Disinvestment Dossier for various Zones; Dossier.

FEED for Gas Storage Project:

Single Line Diagram; Layouts; Specification for electrical equipment; Schedules for MV/LV switchboards; Load Schedule.

Lead Electrical Engineer

EBLA Gas Project – Surface Facilities FEED for Petro-Canada Palmyra BV, Syria Single Line Diagrams for Well Heads, Gas Gathering Station and Gas Treatment Plant; Equipment Layout; Specification for electrical equipment; Schedules for switchboards; Technical evaluation of 11 kV Gas Turbine Generators, 11 kV motor / VSD driven compressors; Load Summary; Review of Power System study. Major Equipment involved in this project:

11kV / 3.3 kV / 0.4 kV switchgear; Power Transformers; 11 kV XLPE Cables; PMS; 8 MW GTGs; 1.2 MW Emergency DGs; 12 Pulse Variable Speed Drives; AC / DC UPS. Page 5

NAME

JAYAPRAKASH NALADI

Lead Electrical Engineer

SevenPlus Project (Train 7 & 8 LNG Plants) FEED, Bonny Island, Nigeria Single Line Diagrams; Layouts; Specifications for electrical equipment; Schedules for 132 kV / 33 kV / 6.6 kV / 0.4 kV switchboards; Requisition & Technical evaluation of 132 kV / 33 kV switchboards & ENMC (Electrical Network Monitoring and Control); Load Summary; Review of Power System studies conducted by MMD (Mott MacDonald) & Co-ordination with other departments & operating centres of TSKJ (consortium of Technip, Snamprogetti, Kellogg & JGC).

Major Equipment involved in this project:

132 kV / 33 kV / 6.6 kV switchgear; Generator Transformer / Power Transformers; 132 kV XLPE Cable; ENMC; 6B / 9E frame GTGs, 2.4 MW Emergency DG Plus Project (Train 4 & 5 LNG Plants) at Bonny Island, Nigeria Technical Queries; Work Packs; Circuit Folders; Punch List points. Saudi Aramco, CCR Platformer and LSRN Isomerisation, Yanbu Refinery Specification for equipment; Technical evaluation of offers; Review of vendor drawings One Line Diagrams, Layouts, Mechanical packages.

UHDE INDIA LTD., MUMBAI, INDIA (JUNE 1999 - DECEMBER 2003) Lead Electrical Engineer

VVF Ltd., Fatty Alcohol Plant & Utilities, Mumbai

System study including design calculations, Equipment sizing, short circuit, voltage drop, earthing, lightning and lighting; Single line diagram; Equipment specifications, offer review, technical recommendation, Vendor drawing review, inspection; Layouts; Erection tender documentation.

GSFC, Train C DAP Plant and Additional Facilities at Jamnagar

• System study; Single line diagram; Design calculations; Equipment specifications, offer review, technical recommendation, Vendor drawing review, inspection; Layouts; Erection tender documentation.

• Supervision of installation of electrical system of 1320 TPD DAP plant and associated additional facilities (Dec 2000 to Dec 2001);

• Pre-commissioning and commissioning activities related to above electrical system (Jan 2002 to April 2002).

DALAL CONSULTANTS & ENGINEERS LTD, CHENNAI, INDIA (JUNE 1998 - MAY 1999)

Senior Electrical Engineer

Single Line Diagrams; Lighting layout, Cable routing and earthing layouts; Lightning protection system layouts; Technical specification of transformer, DG SET, HT isolator/CB, PCC, MCC, HT/LT cables, lightning arrester, capacitors, etc.; Erection tender documentation. Page 6

NAME

JAYAPRAKASH NALADI

KRUPP INDUSTRIES INDIA LTD., CHENNAI, INDIA (SEPTEMBER 1991 – FEBRUARY 1998)

Senior Electrical Engineer

Electrics of machines (Circular Blenders, Reclaimers, Bucket Wheel Excavators), conveyors, etc.

GREAVES CHITRAM LTD. (DECEMBER 1987 – AUGUST 1991) Engineering Executive

Selection of motors/brakes/rotor resistances; Sizing of cables, Equipment Layout and cable schedule; Preparation of power/control/lighting circuits, Estimation work. WMI LTD., BOMBAY, INDIA (APRIL 1986 – AUGUST 1986) Design Engineer

• Selection of motors/brakes/rotor resistance; Sizing of cable, preparation of equipment L/O, preparation of power/control/lighting circuits, cable schedule; Attending to site problems.

HOIST-O-MECH LTD., MAHARASHTRA, INDIA (JANUARY 1985 – MARCH 1986) Electrical Engineer

Testing of control panels, load test of crane at factory; Testing of Squirrel cage induction motors manufactured at factory & Erection of cranes.



Contact this candidate