COVER LETTER
Vinay Kumar
******************@*****.***
HR-Recuitment Department
Dear Hiring Manager,
I'm applying for a fresher recruitment for VLSI Engineer position at your company. Based on the posted description,
I'm confident that I am fully qualified for the position and will be a strong addition to your team. I would appreciate a job interview at your earliest convience.
Please find my resume attached.
I can be reached at the number above or at my email address.
Sincerely,
Vinay Kumar
Name : Vinay Kumar Email - ID : ******************@*****.***
Address : BTM 1st phase, Bangalore, 560029 Mobile : 821-***-****
Objective
To obtain a challenging position in a high quality engineering environment where my resourceful experience andacademic skills will add value to organizational operations.
FIELD OF INTERESTS:
• VLSI ENGINEER
• Embedded Engineer
• Electrical Engineer
ACADEMIC DETAILS :-
B.Tech – EEE:
Institution : RGMCET-Nandyal
Year of Passing : 2017
Mark : 80%
Intermediate:
Institution : Narayana Jr college
Year of Passing : 2013
Mark : 96.8%
SSC:
Institution : St. Francis School
Year of Passing : 2011
Mark : 88%
TECHNICAL - SKILLS:
Languages Known : C, Cpp, Oops, Embedded C.
HDLs : Verilog.
HVL : SystemVerilog.
Test Bench Methodology : UVM.
VERIFICATION METHODOLOGIES : Coverage Driven Verification (Code Coverage, Functional Coverage),
Assertion Based Verification – SVA.
TOOLS : Keil uV 4.0, Rivera Pro and ISE, Xylinks Isim.
Operating Systems : Linux, Windows 8.0, 8.1, 10.
INDUSTRIAL EXPOSURE:
VLSI Training :
• DESIGN AND VERIFICATION TRAINING IN MAVEN-SILICON
Industrial Visit :
• RTPP-Rayalasema Thermal Power plant.
PROJECT DETAILS:
PROJECT : 1
Title : Router 1x3 Design And Verification
Description : In the modern world there is a lot of increase in the usage of the internet and the Router is the Network Device we use. So, In this project we had Designed and Verified the Router by using the Code Coverage and by Functional Coverage techniques. By using the tool Rivera-Pro by using UVM methodology.
Duration : 1 month
Role : Team Member
Team Size : 1
PROJECT : 2
Title : Expression Conversion and Evaluation
Description : Various Companies deal with various tools developed with various languages they follow various techniques to store. In this we had developed a program which will convert an given expression into output or required expression based on the user requirements for sharing of the data.
Duration : 1 month
Role : Team leader
Team Size : 3
PROJECT - 3: B.TECH – Final Year
Title : UPS by using the Smart Switch
Description : We use UPS for the Alternate source of power when fail in Supply.In this we had made the UPS by using Hybrid converter which consists of Fly-Back switch and Push-pull converter which can increase the efficiency and reduce the losses when compared to the normal UPS Devices we are using.
Duration : 6 months
Role : Team leader
Team Size : 6
MINI – Projects:
Speed and Direction Control Of The DC Motor By Arm7lpc2148.
Aluminium – Carbon Battery.
Amplitude and Frequency Modulation.
ACHIEVEMENTS:
• Got a Second Price for the innovative Project (UPS By using Smart Switch) in RGMCET.
• Presented a seminar on Cyclones and it's effects in RGMCET-NANDYAL
CO-CURRICULAR ACTIVITIES:
• Participated in Swatch Bharath in RGMCET
• Social activities
• Participated in Blood Donation Camp in RGMCET.
EXTRA CURRICULAR ACTIVITIES:
• Participating in events conducted in college
• Participating in the sports.
STRENGTHS:
• Teamwork
• Ready to accept challenges and Self Motivated
• Good communication skills
• Positive thinking
• Ready to adjust to any environment.
HOBBIES:
• Google Searching
• Listening to music
• Visiting to new places
• Watching Discovery and National Geography Channel
DECLARATION:
I hereby declare that the above written particulars are true to the best of my knowledge and belief.
Date: (Vinay Kumar )
Place: