Total Experience: *Years
RAMEEZ AKRAM
ADDRESS:Flat#A-303, shaes apartment block-3 near Zam Zam store mosmiyat
Chock gulstan E johar karachi.
CELL NO: +923**-******* /+923*********
Email : *****************@*****.***
Skype ID: rameezbhutto
. ACADAMIC QUALIFICATIONS :
. M.sc(Enviromental science) from Federal Urdu University Arts science
and Technology Karachi in 2018 with 2nd Division.
. B.Sc (General science) from Shah Abdul Latif University Khairpur in
2012 with"2nd" Division.
. F.Sc (Pre Engineering) from B.I.S.E Sukkur in 2006 with "B" Grade.
. S.Sc (science) from B.I.S.E Sukkur in 2004 with "A" Grade.
APPRENTICESHIP TRAINING.
Two Years Apprenticeship training as a Chemical Plant Operator from
LOTTE PAKISTAN PTA Ltd Bin Qasim, Karachi (Formerly ICI Pakistan PTA
Plant). From 2009 to 2011. A member of KPC (Korean Petrochemical Company)
English Language Speaking Course.
Three month English learning course completed from Domino English learning
center Karachi from 15-01-2018 to 15-04-2018
. 9 YEAR EXPERIENCE AS A FIELD OPERATOR(PLC).
. [pic]CURRENT EMPLOYMENT:- Pakistan Oxygen Limited Karachi (FORMERLY
LINDE PAKISTAN LIMITED),AS A "PROCESS CONTROLL SUPERVISOR" on CO2
plant since 16 September 2013 to 16-08-2016
. CO2 Unit:- During operation deals in emergency handling routine checks
CO2 plant."Fire Tube Boiler" Stripper column,sulphur removal
unit(water scrubber) absorber unit, liquid CO2 handling tank, Dry ice
unit,NH3 Refrigeration plant,,CO2 Compressor,heat exchanger.dryer,
cooling tower system.(All Rotary equipment operate through PLC).
o "PROCESS CONTROLL SUPERVISOR" on Hydrogen plant since 16
September 2016 till to date.
. H2 Unit:- During operation deals in emergency handling routine checks
Hydrogen plant,Step down Transformer,Rectifier,electrolysis of water,
"Gas holder, Hydrogen compressor,Purification Unit,
. Semi automatic Operation of 390 m3/hr Hydrogen gas generating plant.
(Through electrolysis process).
. Operation of Hydrogen receipt from Engro polymer limited and
Compressing of one bar hydrogen to 220 bar.
. Monitor production and gas composition.
. Manage hydrogen Loading Operation.
. Maintain the Hydrogen Pipe Line Pressure 98bar For our Customer Lotte
Pakistan PTA (Ltd).
. Maintain the Hydrogen storage Capacity of 10200Nm3. .(All Rotary
equipment operate
. Through PLC.
. [pic]Two year as a Plant operator AL-Tuwairqi Gas processing plant
(DRI Plant) from 20 th Dec 2011 to 07th September
2013.(Commissioning and startup experience of DRI plant) MIDREX
CERTIFICATION USA.
. [pic]Two year as Trainee Chemical Plant Operator from Lotte Pakistan
PTA (Formerly ICI Pakistan PTA Plant )
. [pic] AL-TUWAIRQI GAS PROCESSING PLANT (DRI)
. REDUCTION FURNACE: Reduction Furnace is use for reduction (HYDROEN
REACTION) of Iron Oxide Ore to produce DRI (Direct Reduced Iron).
. PROCESS GAS COMPRESSORS: Two stage Centrifugal Compressors (motor
driven) with mist eliminators.
. SCRUBBERS: Top gas scrubber and cooling gas scrubber.
. INSTRUMENT AIR /PLANT AIR COMPRESSOR: Instrument air / plant air
compressor is screw compressor motor driven.
o SEAL GAS SYSTEM : Seal gas system consists of lobe type
compressor motor driven.
. COOLING GAS COMPRESSOR : Lobe type compressor used to cool the product
.
. [pic] LOTTE PAKISTAN PTA PLANT
. OXIDATION UNIT
. Recovery system: Recovery sections consist of cricket amma filter
constructed from 316L S.S to recover PTA from suspended liquid to
solid and filter is based on PLC operated automatically and manually.
. EVAPORATOR: Residue evaporator is a wiped film type evaporator.
. STRIPPER COLOUMN: Stripper column has five titanium sieve trays.
. DE-HYDRATION COLUMN (fractionating Column): Consist of 80 meters
height fractionating column 6 beds packing with Re-boiler which work
on the basis of Thermo-Siphon principal and overhead Fin-Fans
condensers.
. METHYL ACETATE COLUMN: Consist of structure and random packing bed
column where Methyl Acetate and Paraxylene is recovered from Oxi-
Reactor off-gases through evaporation process.
. FILTRATION UNIT: Consist of two rotary vacuum filters to separate the
CTA crystal from solvent.
. EMERGENCY HANDLING:
. Startup, Shutdown, Over-hauling and maintenance handover of plant.
. Emergency handling, (Power failure, Steam failure, Instrument air
failure, Demin / Cooling water failure, conveying gas failure and DCS
failure).
. SAFETY TRAINING:
. Permit to work system (cold-work, hot-work, entry-permit, excavation).
. First-Aid and fire firefighting courses.
. Fire-Extinguishing system (CO2 and DCP).
. Audit of safety equipments.
. AREA RESPONSIBILITIES:
. Routine changeover of pumps, filters
. Record parameters of area.
. Routine audits of area (safety, house-keeping etc).
. Collect routine samples of area.
. Isolate, drain, depressurize and decontaminate the equipments before
handover to maintenance department.
. PERSONAL INFORMATION :
o Father's Name :
Mohammad Akram
. Date of Birth :
05-OCT-1988
. N.I.C. Number : 45101-
7514225-3
. Marital Status : Single
. Nationality :
Pakistani
. Religion :
Islam
. REFERENCE
o Available upon request