Post Job Free

Resume

Sign in

Plant Operator

Location:
Karachi, Sindh, Pakistan
Posted:
May 22, 2018

Contact this candidate

Resume:

Total Experience: *Years

RAMEEZ AKRAM

ADDRESS:Flat#A-303, shaes apartment block-3 near Zam Zam store mosmiyat

Chock gulstan E johar karachi.

CELL NO: +923**-******* /+923*********

Email : ac5kfb@r.postjobfree.com

Skype ID: rameezbhutto

. ACADAMIC QUALIFICATIONS :

. M.sc(Enviromental science) from Federal Urdu University Arts science

and Technology Karachi in 2018 with 2nd Division.

. B.Sc (General science) from Shah Abdul Latif University Khairpur in

2012 with"2nd" Division.

. F.Sc (Pre Engineering) from B.I.S.E Sukkur in 2006 with "B" Grade.

. S.Sc (science) from B.I.S.E Sukkur in 2004 with "A" Grade.

APPRENTICESHIP TRAINING.

Two Years Apprenticeship training as a Chemical Plant Operator from

LOTTE PAKISTAN PTA Ltd Bin Qasim, Karachi (Formerly ICI Pakistan PTA

Plant). From 2009 to 2011. A member of KPC (Korean Petrochemical Company)

English Language Speaking Course.

Three month English learning course completed from Domino English learning

center Karachi from 15-01-2018 to 15-04-2018

. 9 YEAR EXPERIENCE AS A FIELD OPERATOR(PLC).

. [pic]CURRENT EMPLOYMENT:- Pakistan Oxygen Limited Karachi (FORMERLY

LINDE PAKISTAN LIMITED),AS A "PROCESS CONTROLL SUPERVISOR" on CO2

plant since 16 September 2013 to 16-08-2016

. CO2 Unit:- During operation deals in emergency handling routine checks

CO2 plant."Fire Tube Boiler" Stripper column,sulphur removal

unit(water scrubber) absorber unit, liquid CO2 handling tank, Dry ice

unit,NH3 Refrigeration plant,,CO2 Compressor,heat exchanger.dryer,

cooling tower system.(All Rotary equipment operate through PLC).

o "PROCESS CONTROLL SUPERVISOR" on Hydrogen plant since 16

September 2016 till to date.

. H2 Unit:- During operation deals in emergency handling routine checks

Hydrogen plant,Step down Transformer,Rectifier,electrolysis of water,

"Gas holder, Hydrogen compressor,Purification Unit,

. Semi automatic Operation of 390 m3/hr Hydrogen gas generating plant.

(Through electrolysis process).

. Operation of Hydrogen receipt from Engro polymer limited and

Compressing of one bar hydrogen to 220 bar.

. Monitor production and gas composition.

. Manage hydrogen Loading Operation.

. Maintain the Hydrogen Pipe Line Pressure 98bar For our Customer Lotte

Pakistan PTA (Ltd).

. Maintain the Hydrogen storage Capacity of 10200Nm3. .(All Rotary

equipment operate

. Through PLC.

. [pic]Two year as a Plant operator AL-Tuwairqi Gas processing plant

(DRI Plant) from 20 th Dec 2011 to 07th September

2013.(Commissioning and startup experience of DRI plant) MIDREX

CERTIFICATION USA.

. [pic]Two year as Trainee Chemical Plant Operator from Lotte Pakistan

PTA (Formerly ICI Pakistan PTA Plant )

. [pic] AL-TUWAIRQI GAS PROCESSING PLANT (DRI)

. REDUCTION FURNACE: Reduction Furnace is use for reduction (HYDROEN

REACTION) of Iron Oxide Ore to produce DRI (Direct Reduced Iron).

. PROCESS GAS COMPRESSORS: Two stage Centrifugal Compressors (motor

driven) with mist eliminators.

. SCRUBBERS: Top gas scrubber and cooling gas scrubber.

. INSTRUMENT AIR /PLANT AIR COMPRESSOR: Instrument air / plant air

compressor is screw compressor motor driven.

o SEAL GAS SYSTEM : Seal gas system consists of lobe type

compressor motor driven.

. COOLING GAS COMPRESSOR : Lobe type compressor used to cool the product

.

. [pic] LOTTE PAKISTAN PTA PLANT

. OXIDATION UNIT

. Recovery system: Recovery sections consist of cricket amma filter

constructed from 316L S.S to recover PTA from suspended liquid to

solid and filter is based on PLC operated automatically and manually.

. EVAPORATOR: Residue evaporator is a wiped film type evaporator.

. STRIPPER COLOUMN: Stripper column has five titanium sieve trays.

. DE-HYDRATION COLUMN (fractionating Column): Consist of 80 meters

height fractionating column 6 beds packing with Re-boiler which work

on the basis of Thermo-Siphon principal and overhead Fin-Fans

condensers.

. METHYL ACETATE COLUMN: Consist of structure and random packing bed

column where Methyl Acetate and Paraxylene is recovered from Oxi-

Reactor off-gases through evaporation process.

. FILTRATION UNIT: Consist of two rotary vacuum filters to separate the

CTA crystal from solvent.

. EMERGENCY HANDLING:

. Startup, Shutdown, Over-hauling and maintenance handover of plant.

. Emergency handling, (Power failure, Steam failure, Instrument air

failure, Demin / Cooling water failure, conveying gas failure and DCS

failure).

. SAFETY TRAINING:

. Permit to work system (cold-work, hot-work, entry-permit, excavation).

. First-Aid and fire firefighting courses.

. Fire-Extinguishing system (CO2 and DCP).

. Audit of safety equipments.

. AREA RESPONSIBILITIES:

. Routine changeover of pumps, filters

. Record parameters of area.

. Routine audits of area (safety, house-keeping etc).

. Collect routine samples of area.

. Isolate, drain, depressurize and decontaminate the equipments before

handover to maintenance department.

. PERSONAL INFORMATION :

o Father's Name :

Mohammad Akram

. Date of Birth :

05-OCT-1988

. N.I.C. Number : 45101-

7514225-3

. Marital Status : Single

. Nationality :

Pakistani

. Religion :

Islam

. REFERENCE

o Available upon request



Contact this candidate