CHERIKKANDIFAISAL
HOME Fawazmanzil Telphone (****)949-***-**** (mob)
ADDRESS Kodampuzha (0091)996******* (mob)
P.O.Farookcollage
District:Kozhkode Email: *****************@*****.**.** State:Kerala *****************@*****.***
India-673632
CPRNo : 681207388
POSTAL Dateofbirth: 14december1968
ADDRESS
JOBSTATUS Single
DRVINGLICENCE
LightVehicles
NATIONALITY Indian
PASSPORTNO: L1568009
LANGUAGES(fluent) English, hindi,malyalam
EDUCATION:MECHANICALENGINEERINGDIPLOMA
Areasofparticular Rigging and erectionandfabrication superviser of work on green- Expertose field andbrown-field sites in the Middleast Rigging and Erection 12years
Fabrication 4years
Construction/comissing 6years
TRAINING: Bechtel supervisor trained
Work at high trained
Safety inducted at several sites (currentAlba&Bapco) Potroom Direct Current Safety inducted
Certified Tharmit Welder/supervisor
Bapco Safety course.
BureauVerities Riggin/siling TrainingCoures
TUV Rigging&liffting supervisor Trained
Computer training (msoffice)
Addgas supervisor trained (Abu-Dhabi)
TUV lifting inspector trained (KSA)
WORKHISTORY:
Bahrain
Jully2017 to ON GOING Working as a Rigging supervisor RAMSIS ENGINEERING Sitra Storage tank and equipment erection BANAGAS JGC FELGURA
Riyadh, KSA
Jan2016 toApr2016 Install and commissioning of 8Ns lounging graders for the metro rail projects AL RIYADH METRO working has a rigging-lifting supervisor
India,kerala
Mar2014 toOct2015 Working has a general supervisor flyover bridge at CHERIYANVERKEY Constriction company
Oct2013 toDec2013 Add Gas shut down in DASISLAND in Abu-dhabi working as a rigging-lifting supervisor
Abu-Dhabi
Jan2013to may2013 Kuwait
KOC GC16 PROJECT KUWAIT WOKING AS RIGGING SU-
PREINDENT SHUT DOWN PROJECT
May2009to 2010may: Qatar
QATAR ALUMINIUM SNC LAVALIN ASTALDIARABIA
Installation & commissioning of cock & alumina Silo us Seawater pump, Pumping Station Harbur Building working as a rigging- suprendend
July2007to may2009 : Qatar
QATOFIN .L L D P E PROJECT SANAMPROJETTI ASTALDI
Installation & commissing of Heavy equipment structure pipping working as riggingsuprendend
June2005toapril2007 Bahrain
AL–EZZEL,POWERPLANT,SIEMENS-NASSMACHANICAL
Installation & commissing of sixnumbers of turbine working as a riggingsuperviser 4nos gas turbine and 2nos steam turbine Jan04 to Mar 05
Bahrain
ALBA LINE5 SMELTER BECHTEL INTERNATIONAL NASS
MECHANICAL
Thermit welding superviser for the thermit welding of the overhead- crane rails in the potrooms,workshop,pot services building and the centralpassage transfer gantry crane rail
Lead a team of workers tio install the claustera wall panels and the ininsualated floor slabs in the portrooms.
Supervision of the installation of crane collecter rails, pot shells on to negative ring busbar and the assambley of superstructures on to the potsheels.
I am proud to be part of the site team that achieved five million works- hours with out a lost time injury on the ALBAline 5 project. Sept03 to jan04 Bahrain
NASSMECHANICALWORKSHOP
Supervised a team of workers for the erection and commissing of the Hidd workshop building and the workshop crane
Jul03 tosept03 Bahrain
25t OVERHED CRANE
Supervised a team of workers for the erection and commissing of the crane at Delmonpre-cast workshop
Apr 03 tojul03 Bahrain
WATER TANK REPAIR
Organised and supervised a team of workers for the replacement of the bottam floor of a large water tank in Riffa
Aug02 toapr 03 Bahrain
WATER TANK
Organised an supervised a team of workers for the construction of elevated water tank for khalifa bin salman port (4.500millionlitres) andfor hidd industrial area (600mt)
Mar01 to aug 02 Bahrain
STRUCTURE STEEL BUILDINGS
During this period worked on two project as the leading superviser for the erecting of 600t of structural steel for the Bahrain school and 700t of structural steel for the sixteen storeys Taib bank tower Nov00 tomar o1 Bahrain
ALBA SMELTER SLEWIN GJIB CRANE
Organised and supervised a team of workers for the construction of the 650t railmounted Kangaroo type slewingjib crane. Supplied by- Stothert & Pitt/Rolls-Royce.
Feb00 to nov 00 Bahrain
ALBA DOCK SIDE CRANE
Carried 0ut supervise duties on the structural steel and equipment erection to fine tolarances of the Alesa Alussuise600mt ship unlo-
-ader/loader for the Coke Calcination plant.
Jan97tofeb200 Bahrain
GAS TURBINE & DESALINATION PLANT
Managed a work team to construction the structural steel works for the Gas turabine and the Desailination plant.
Apr96 tojan 97 Bahrain
BAPCO MAINTANCE & REPAIR
Forman for the repairs and maintance of tanks
Jan 95 to96 Saudiarabia
QASSIM CEMENT PLANT
Responsible for the installation of the pre heater building and the cement hoppers.Installation and aligment of the cement kilin andcement conyers sytem
Aug 94 tojan 95 Bahrain
GULF INDUSTRIAL INVESTMENT
installation and commissing of the Grinding millNo 3 Jan 94 to aug 94 Bahrain
ALUSERVE MIDDL EEAST
installation and commissing of the aluminium furance and conveyer. Mar 93 to jan94 Bahrain
ALBA WASTE HEAT BOILERS
Supervised a work crew to carry out structural changes to the seprater to the sepreaters, heat exchange,condensing units and Ducting for the gas conversion of three waste heat boilers at the Alba Smelter Mar92tomar93 Bahrain
BAPCO MAINTANCE & REPAIR
Foreman for the repairs and maintance of tanks
Aug91to mar92 Bahrain
BAPCO UNDER WATER PIPE LINE
Rigging foreman for the laying a 450 mm diamiter steelpipline, five kilomiters long on the seabead
Jan91 to aug 91 Bahrain
ALBA LINE 4 CASTHOUSE
Worked as the forman on the erection,installation and commissing of the five fifty ton smelter furnaces for th eAlba Line4 expanesion prject. Mar90todec90 Bahrain
ALBALINE 4 SMELTER
Managed a work team to construt the structural steel building for albaline 4 Furnace building and Bake Anode/Green Anode buliding5