Post Job Free
Sign in

Lifting / Riggingsuperviser

Location:
Kozhikode, KL, India
Salary:
2000 us dollars
Posted:
May 18, 2018

Contact this candidate

Resume:

CHERIKKANDIFAISAL

HOME Fawazmanzil Telphone (****)949-***-**** (mob)

ADDRESS Kodampuzha (0091)996******* (mob)

P.O.Farookcollage

District:Kozhkode Email: *****************@*****.**.** State:Kerala *****************@*****.***

India-673632

CPRNo : 681207388

POSTAL Dateofbirth: 14december1968

ADDRESS

JOBSTATUS Single

DRVINGLICENCE

LightVehicles

NATIONALITY Indian

PASSPORTNO: L1568009

LANGUAGES(fluent) English, hindi,malyalam

EDUCATION:MECHANICALENGINEERINGDIPLOMA

Areasofparticular Rigging and erectionandfabrication superviser of work on green- Expertose field andbrown-field sites in the Middleast Rigging and Erection 12years

Fabrication 4years

Construction/comissing 6years

TRAINING: Bechtel supervisor trained

Work at high trained

Safety inducted at several sites (currentAlba&Bapco) Potroom Direct Current Safety inducted

Certified Tharmit Welder/supervisor

Bapco Safety course.

BureauVerities Riggin/siling TrainingCoures

TUV Rigging&liffting supervisor Trained

Computer training (msoffice)

Addgas supervisor trained (Abu-Dhabi)

TUV lifting inspector trained (KSA)

WORKHISTORY:

Bahrain

Jully2017 to ON GOING Working as a Rigging supervisor RAMSIS ENGINEERING Sitra Storage tank and equipment erection BANAGAS JGC FELGURA

Riyadh, KSA

Jan2016 toApr2016 Install and commissioning of 8Ns lounging graders for the metro rail projects AL RIYADH METRO working has a rigging-lifting supervisor

India,kerala

Mar2014 toOct2015 Working has a general supervisor flyover bridge at CHERIYANVERKEY Constriction company

Oct2013 toDec2013 Add Gas shut down in DASISLAND in Abu-dhabi working as a rigging-lifting supervisor

Abu-Dhabi

Jan2013to may2013 Kuwait

KOC GC16 PROJECT KUWAIT WOKING AS RIGGING SU-

PREINDENT SHUT DOWN PROJECT

May2009to 2010may: Qatar

QATAR ALUMINIUM SNC LAVALIN ASTALDIARABIA

Installation & commissioning of cock & alumina Silo us Seawater pump, Pumping Station Harbur Building working as a rigging- suprendend

July2007to may2009 : Qatar

QATOFIN .L L D P E PROJECT SANAMPROJETTI ASTALDI

Installation & commissing of Heavy equipment structure pipping working as riggingsuprendend

June2005toapril2007 Bahrain

AL–EZZEL,POWERPLANT,SIEMENS-NASSMACHANICAL

Installation & commissing of sixnumbers of turbine working as a riggingsuperviser 4nos gas turbine and 2nos steam turbine Jan04 to Mar 05

Bahrain

ALBA LINE5 SMELTER BECHTEL INTERNATIONAL NASS

MECHANICAL

Thermit welding superviser for the thermit welding of the overhead- crane rails in the potrooms,workshop,pot services building and the centralpassage transfer gantry crane rail

Lead a team of workers tio install the claustera wall panels and the ininsualated floor slabs in the portrooms.

Supervision of the installation of crane collecter rails, pot shells on to negative ring busbar and the assambley of superstructures on to the potsheels.

I am proud to be part of the site team that achieved five million works- hours with out a lost time injury on the ALBAline 5 project. Sept03 to jan04 Bahrain

NASSMECHANICALWORKSHOP

Supervised a team of workers for the erection and commissing of the Hidd workshop building and the workshop crane

Jul03 tosept03 Bahrain

25t OVERHED CRANE

Supervised a team of workers for the erection and commissing of the crane at Delmonpre-cast workshop

Apr 03 tojul03 Bahrain

WATER TANK REPAIR

Organised and supervised a team of workers for the replacement of the bottam floor of a large water tank in Riffa

Aug02 toapr 03 Bahrain

WATER TANK

Organised an supervised a team of workers for the construction of elevated water tank for khalifa bin salman port (4.500millionlitres) andfor hidd industrial area (600mt)

Mar01 to aug 02 Bahrain

STRUCTURE STEEL BUILDINGS

During this period worked on two project as the leading superviser for the erecting of 600t of structural steel for the Bahrain school and 700t of structural steel for the sixteen storeys Taib bank tower Nov00 tomar o1 Bahrain

ALBA SMELTER SLEWIN GJIB CRANE

Organised and supervised a team of workers for the construction of the 650t railmounted Kangaroo type slewingjib crane. Supplied by- Stothert & Pitt/Rolls-Royce.

Feb00 to nov 00 Bahrain

ALBA DOCK SIDE CRANE

Carried 0ut supervise duties on the structural steel and equipment erection to fine tolarances of the Alesa Alussuise600mt ship unlo-

-ader/loader for the Coke Calcination plant.

Jan97tofeb200 Bahrain

GAS TURBINE & DESALINATION PLANT

Managed a work team to construction the structural steel works for the Gas turabine and the Desailination plant.

Apr96 tojan 97 Bahrain

BAPCO MAINTANCE & REPAIR

Forman for the repairs and maintance of tanks

Jan 95 to96 Saudiarabia

QASSIM CEMENT PLANT

Responsible for the installation of the pre heater building and the cement hoppers.Installation and aligment of the cement kilin andcement conyers sytem

Aug 94 tojan 95 Bahrain

GULF INDUSTRIAL INVESTMENT

installation and commissing of the Grinding millNo 3 Jan 94 to aug 94 Bahrain

ALUSERVE MIDDL EEAST

installation and commissing of the aluminium furance and conveyer. Mar 93 to jan94 Bahrain

ALBA WASTE HEAT BOILERS

Supervised a work crew to carry out structural changes to the seprater to the sepreaters, heat exchange,condensing units and Ducting for the gas conversion of three waste heat boilers at the Alba Smelter Mar92tomar93 Bahrain

BAPCO MAINTANCE & REPAIR

Foreman for the repairs and maintance of tanks

Aug91to mar92 Bahrain

BAPCO UNDER WATER PIPE LINE

Rigging foreman for the laying a 450 mm diamiter steelpipline, five kilomiters long on the seabead

Jan91 to aug 91 Bahrain

ALBA LINE 4 CASTHOUSE

Worked as the forman on the erection,installation and commissing of the five fifty ton smelter furnaces for th eAlba Line4 expanesion prject. Mar90todec90 Bahrain

ALBALINE 4 SMELTER

Managed a work team to construt the structural steel building for albaline 4 Furnace building and Bake Anode/Green Anode buliding5