Post Job Free

Resume

Sign in

Electrical Engineering Engineer

Location:
Indore, MP, India
Salary:
350000
Posted:
May 13, 2018

Contact this candidate

Resume:

RESUME

KIRTAN LAL

MOB No. +918*********

+918*********

Email ID- ac5fx3@r.postjobfree.com

Online profile- https://www.linkedin.com/in/kirtann-sahu-786b1484

Profile

A result oriented professional with over 5 Year and 6 month of experience in Cement Plant

Electrical Supervisory Licence No- 07/14/1791

Presently working as Electrical Engineer in JK Lakshmi Cement Ltd. Durg 5000 TPD integrated plant with ISO:9001, ISO:50001, OHSAS:18001, ISO:14001

Educational Qualification

B-tech in electrical engineering pursuing from AMIE.

Diploma in Electrical Engineering with 74.14% marks in 2012

Passed HSSC with 73.4 % marks in 2009

Passed SSC with 71% marks in 2007

Certificate Qualification /Training

Electrical Supervisory License from C.G. Electricity Board.

Training attend of Siemens about 3AK HT Breaker & 8BK80 HT Panel.

Training and Testing attend in BBL about Transformer Routine & type test

Electrical Work Experience

33/6.6 kv HT Panel, PMCC, PCC & IMCC panel ( Siemens make ).

LT & HT motors up to 5.5 kw to 4500KW( BHEL, SIEMENS,ABB, CGL, BBL etc.

Maintenance and their all routine test of Power transformer, Distribution Transformer Convertor Duty Transformer 2 MVA to 25 MVA ( Volt amp,kirloskar & BBL)

HT breaker 3AK & 3AP1, LT Breaker Siemens 3WL, L&T & ABB Breakers up to 800A to 3200A

220 kv Switchyard and MRSS Control system

SIMOCOD, LRS GRR and Soft starter of setting and parameter as per motor Logic.

Maintenance work & overhauling all kind of LT motor up to 1.1 kw to 4500kw

Filtration, PPM and BDV test of transformer oil before charging .

ABB MVVFD, LVVFD, Weigh Feeder, Soft Starter their testing and setting

Hi-pot test of HT cable, insulation & megger test

EEL 16 spout double discharge their Roto Packer,Truck loader CDA1020 their control, Bulk loading, Rejected crushing unit,

Work on SAP for Record keeping, material management, PR order for new material,

Responsibility in shift Operation & Maintenance

Plant daily energy cosumption and generation report.

Conditioning Monitoring of all electrical equipment as per PM Module and schedule checkup

Work on SAP for maintain Plant PM Module and update all order, Record keeping maintenance activity and modification on SAP, material management, PR order for new material.

Daily routine observation of Transformer, HT & LT Motor, All HT LT Panel in shift.

Maintenance work & overhauling all kind of LT motor upto 1.1 kw to 4500kw

Plant Process, Operators & Technicians shift handling, Fault finding, Trouble shooting of electrical equipment, Inspection of Electrical equipment & giving reports, Daily Reporting to HOD.

Keep all record of shift Operation, LOTOTO record as per ISO

Project Work Experience

Erection Commissioning & Testing of 700KVA to 2MVA Transformer.

Erection Commissioning of 6.6kv HT panel, PCC & IMCC Panel.

Erection Commissioning of EEL Roto Packer 16 RS-VDE, BULK Loading machine

Erection Commissioning of CDA 1020J Truck Loader and control system.

Erection Commissioning & Testing of 5.5KW to 4500 kw motor.

Handle all construction power of plant during construction green field Construction power supply arrangement for different contractor at site

Computer Skill

Work on SAP for maintain Plant PM Module and update all order, Record keeping maintenance activity and modification on SAP, material management, PR order for new material.

PM module for daily maintenance order, notification creation against order,

Work on excel, Microsoft, Notepad etc

Career Highlights

successfully erection and commission of Two Load Centres in my supervision that is packing plant and utility Load Centre during Project Work

Testing, erection and commissioning of packing plant Section (EEL Roto Packer 16 spout double discharge, Truck loader machine CDA1020, Bulk loading, Wagon loading series 2026E, Rejected bin crushing unit

Successful commissioned the Packing plant and dispatch started January onward.

Achievement

I start my professional career with green field project JK Lakshmi Cement Ltd. Project Durg since September 2012 and learn about the cement manufacturing plant from root level

I successfully erection and commissioned Packing plant and their load centre’s all electrical equipment

Key Skill

Knowledge of project work in cement plant form green field project

Work as section in charge in load centres erection & commissioning

Strength

Innovative and Quick in adapting to any situation.

excellent communication and interpersonal skill.

Personal Detail

Name : Kirtan lal

Highest Qua. : Electrical Engg.

Date of Birth : 15/10/1990

Parmanent Add : Village and Post- Urla (B.M.Y.) Charoda

Distt.- Durg (C.G.) PIN 490025

Contact No. : 089******** & 099********

Email ID : ac5fx3@r.postjobfree.com

Declaration

I Hereby Declare that the information provided above is true and correct

Date : Signature

Place :



Contact this candidate