RESUME
KIRTAN LAL
MOB No. +918*********
Email ID- *************@*****.***
Online profile- https://www.linkedin.com/in/kirtann-sahu-786b1484
Profile
A result oriented professional with over 5 Year and 6 month of experience in Cement Plant
Electrical Supervisory Licence No- 07/14/1791
Presently working as Electrical Engineer in JK Lakshmi Cement Ltd. Durg 5000 TPD integrated plant with ISO:9001, ISO:50001, OHSAS:18001, ISO:14001
Educational Qualification
B-tech in electrical engineering pursuing from AMIE.
Diploma in Electrical Engineering with 74.14% marks in 2012
Passed HSSC with 73.4 % marks in 2009
Passed SSC with 71% marks in 2007
Certificate Qualification /Training
Electrical Supervisory License from C.G. Electricity Board.
Training attend of Siemens about 3AK HT Breaker & 8BK80 HT Panel.
Training and Testing attend in BBL about Transformer Routine & type test
Electrical Work Experience
33/6.6 kv HT Panel, PMCC, PCC & IMCC panel ( Siemens make ).
LT & HT motors up to 5.5 kw to 4500KW( BHEL, SIEMENS,ABB, CGL, BBL etc.
Maintenance and their all routine test of Power transformer, Distribution Transformer Convertor Duty Transformer 2 MVA to 25 MVA ( Volt amp,kirloskar & BBL)
HT breaker 3AK & 3AP1, LT Breaker Siemens 3WL, L&T & ABB Breakers up to 800A to 3200A
220 kv Switchyard and MRSS Control system
SIMOCOD, LRS GRR and Soft starter of setting and parameter as per motor Logic.
Maintenance work & overhauling all kind of LT motor up to 1.1 kw to 4500kw
Filtration, PPM and BDV test of transformer oil before charging .
ABB MVVFD, LVVFD, Weigh Feeder, Soft Starter their testing and setting
Hi-pot test of HT cable, insulation & megger test
EEL 16 spout double discharge their Roto Packer,Truck loader CDA1020 their control, Bulk loading, Rejected crushing unit,
Work on SAP for Record keeping, material management, PR order for new material,
Responsibility in shift Operation & Maintenance
Plant daily energy cosumption and generation report.
Conditioning Monitoring of all electrical equipment as per PM Module and schedule checkup
Work on SAP for maintain Plant PM Module and update all order, Record keeping maintenance activity and modification on SAP, material management, PR order for new material.
Daily routine observation of Transformer, HT & LT Motor, All HT LT Panel in shift.
Maintenance work & overhauling all kind of LT motor upto 1.1 kw to 4500kw
Plant Process, Operators & Technicians shift handling, Fault finding, Trouble shooting of electrical equipment, Inspection of Electrical equipment & giving reports, Daily Reporting to HOD.
Keep all record of shift Operation, LOTOTO record as per ISO
Project Work Experience
Erection Commissioning & Testing of 700KVA to 2MVA Transformer.
Erection Commissioning of 6.6kv HT panel, PCC & IMCC Panel.
Erection Commissioning of EEL Roto Packer 16 RS-VDE, BULK Loading machine
Erection Commissioning of CDA 1020J Truck Loader and control system.
Erection Commissioning & Testing of 5.5KW to 4500 kw motor.
Handle all construction power of plant during construction green field Construction power supply arrangement for different contractor at site
Computer Skill
Work on SAP for maintain Plant PM Module and update all order, Record keeping maintenance activity and modification on SAP, material management, PR order for new material.
PM module for daily maintenance order, notification creation against order,
Work on excel, Microsoft, Notepad etc
Career Highlights
successfully erection and commission of Two Load Centres in my supervision that is packing plant and utility Load Centre during Project Work
Testing, erection and commissioning of packing plant Section (EEL Roto Packer 16 spout double discharge, Truck loader machine CDA1020, Bulk loading, Wagon loading series 2026E, Rejected bin crushing unit
Successful commissioned the Packing plant and dispatch started January onward.
Achievement
I start my professional career with green field project JK Lakshmi Cement Ltd. Project Durg since September 2012 and learn about the cement manufacturing plant from root level
I successfully erection and commissioned Packing plant and their load centre’s all electrical equipment
Key Skill
Knowledge of project work in cement plant form green field project
Work as section in charge in load centres erection & commissioning
Strength
Innovative and Quick in adapting to any situation.
excellent communication and interpersonal skill.
Personal Detail
Name : Kirtan lal
Highest Qua. : Electrical Engg.
Date of Birth : 15/10/1990
Parmanent Add : Village and Post- Urla (B.M.Y.) Charoda
Distt.- Durg (C.G.) PIN 490025
Contact No. : 089******** & 099********
Email ID : *************@*****.***
Declaration
I Hereby Declare that the information provided above is true and correct
Date : Signature
Place :