Post Job Free
Sign in

Project Manager Quality Engineer

Location:
Sanford, NC
Salary:
80-85k
Posted:
May 02, 2018

Contact this candidate

Resume:

MARTI GREENE

*** ****** **** **, ***** City, NC *7344

Cell: 336-***-****

*****.******@*****.***

Professional Summary

Accomplished and energetic Quality Systems Manager with a solid history of achievement

in internal process and system audits and management of quality systems. Motivated

leader with strong organizational and prioritization abilities. Areas of expertise include critical

Thinking, Problem Solving and budget and time management..

Skills

Complex Problem Solving Critical Thinking

Building and Construction Quality Control Analysis

Administration and Management Customer and Personal Service

Time Management

Experience

Development Quality Engineer Aug 2012-Present

MAGNETI MARELLI POWERTRAIN USA

performed as a key resource to ensure that new projects are aligned with quality

procedures and processes.

Ensure that all quality assurance gates are met in regards to master plans.

Lead APQP quality gates to closure on time of master plan in order to meet project

dates for customers.

Provided detailed information to team on Risk Analysis starting in Order acquisitions

through-out the entire project to SOP.

Track Quality gates within project to ensure we are meeting customer needs. Worked

with Process Engineer on Industrialization planning to ensure Gates are met.

Quality Systems and Audit Manager for Magneti Marelli.

Conduct Monthly internal Audits to all Processes in plants.

Report all audits and findings to Division.

Worked with Supply Quality doing External Supplier Audits for Continued

conformance.

Led Quality team to ensure processes and procedures are being followed.

Aligned processes with Plant Quality and Manufacturing to ensure that Quality

System is always improving.

Lead Auditor for NAFTA which includes Design house in Auburn Hills MI, Magneti

Marelli Powertrain Sanford and Magneti Marelli Powertrain Saltillo Mexico.

Successfully opened new Plant in Saltillo and worked with Plant Manager to establish

Procedures and process for operators to run plant successfully.

Saltillo plant is now fully ISO/TS 16949 Certified.

Currently working on GAP analysis and implementation to IATF 16949 and ISO

9000-2015 to ensure NAFTA is in compliance for next audit for Saltillo.

Led discussion and PDCA with Lab personnel to update procedures and processes to

be in conformance with IEC 17025 for Reliability Labs, Prototype Labs and

Calibration labs.

Followed closely the Customers Specific Requirements to ensure they are being

adhered to by plants.

Quality Engineer with Lead Auditing for ISO/TS 16949 and VDA 6.3 Certified.

Worked directly with Customer SQE to ensure PPAP approvals are on time for MRD

with customer..

Training of Core Tools for manufacturing engineers and conducted WCM

approach problem solving techniques for issues on plant floor.

Produced Part Inspection Standards, DFMEA's, PFMEA's, Control Plans, Process

Flows, SOP's, OPL's for Die Casting, Machining, Injection Molding and Assembly.

Worked directly with Customer as Program Manager to bring in New product for

Saltillo Plant to include Quality Documents, PDR's on New line, training operators on

line, developing processes for new product with Zero defect and Occurrence and

Release approach.

Responsible for Program management for products for Chrysler and Harley

Davidson as the Quality Engineer doing AQP responsibilities including PPAP

submission, Forever Requirements, Change Notices, PFMEA, Control plans, Drawing

updates, layout dimension submissions to customers.

Coordinate with Supply quality and Purchasing for changes in the supply chain for

transparency within departments to ensure we are complying with all requirements

with in MM and with customers.

CATERPILLER LOGISTICS INC Oct 2011-Apr 2012

Worked with logistics team to move production line and parts from 4 warehouses to

new facility.

Accomplished move with no stop in production and no injuries.

Executive Administrative Assistant Jun 2010-Jan 2011

HERMAN STEWART CONSTRUCTION - Lanham, MD

Proficient in all administrative duties on construction projects.

Knowledgeable of Prolog, Surtrak, Microsoft Office, Microsoft Project, P3, Excel,

Lotus Notes, Power Point, Publication, Microsoft Outlook.

Construction Project Manager Aug 2006-Nov 2008

CONTINENTAL CONTRACTORS INC - Annapolis, MD

Managed all phases of renovation of existing hotels projects (budgets of up to $5M).

Consistently exceeded margin goals and client expectations.

Renovated hotels while conducting business with clients with no disruptions to the

clients.

Assistant Project Manager Feb 1998-Jan 2005

ARMADA HOFFLER CONSTRUCTION - Virginia Beach, VA

Construction Project manager

with a 15-year record of success overseeing all phases of multimillion-dollar

construction, infrastructure and environmental projects for government and private-

sector clients.

Experience includes managing crews of up to 75 in ground up construction of

mid-size buildings to hotels and a variety of other construction/demolition projects.

Backed by strong credentials and a proven history of on-time, on-budget and

high-quality project completions.

Provide supervision on a diverse range of commercial construction, additions to

existing warehouse projects, Tenant Build out projects (budgets ranging from $450K

to $8M).

New construction ground up.

Started as Project Manager Assistant with administrative duties and moved up to

Assistant Project Manager in addition to acting Project manager on specific projects.

Construction Project Managed Hotel Improvement Projects (2006 to 2008).

Budgets: $500K to $7M Demolition of existing interior finishes of occupied hotels

throughout the East coast, completing all projects on or under budget.

Warehouse Addition Projects (2003 to 2005).

Budgets: $2M to $4M Served as Project Manager on multimillion-dollar projects that

included excavations of contaminated soil, public lands restoration initiatives, tilt up

construction.

Other Construction & Demolition Projects (1998 to 2003).

Budgets: $450K to $7M Completed diverse construction/demolition projects, including

the ground-up build of new bank building, corporate offices and parking garages hotel

construction.

Education

VDA 6.3 Lead Auditor Jul 2015

AIAG - Southfield, MI

United States Navy Cryptologic Tech from - Pensacola, FL Jul 1985

Shanin Green Belt Training Sept 2017



Contact this candidate