Post Job Free

Resume

Sign in

Engineer Power Plant

Location:
Balamban, Cebu, Philippines
Posted:
July 12, 2018

Contact this candidate

Resume:

Sergio M. Cabido Jr.

*** ****** **. ***. ****, Balamban, Cebu, Philippines 6041 ■ +63-916******* ■ ac58ng@r.postjobfree.com

EXECUTIVE SUMMARY

Planning Engineer with 9+ years of experience combining project management in new shipbuilding and oil & gas. Currently working as Mechanical Engineer with 1+ year background in coal-fired power plant project. Supervisor with 15+ years of solid history of achievement in new shipbuilding. Degree in Bachelor of Science in Mechanical Engineering with over 20 years total combined work experience in new shipbuilding, ship conversion & upgrading, coal-fired power plant, oil & gas, cement and beverage industry. Overseas working experience in Singapore, Thailand, Malaysia and Japan (as working trainee).

KEY SKILLS & KNOWLEDGE AREA

Project management and manpower supervision (new shipbuilding / oil & gas / coal-fired power plant) projects.

Planning (scheduling / monitoring / updating / reporting).

Quality control (new shipbuilding / oil & gas / coal-fired power plant) projects.

Computer literacy (Primavera 6.0 / Microsoft Project /Word / Excel / Power Point / basic Auto CAD).

Ability to adapt and work very well as a team in a multinational environment.

Proficient in good working relationship with clients & colleagues.

PROFESSIONAL EXPERIENCE

GALING POWER & ENERGY CONSTRUCTION CO., INC. Cebu, Philippines

Mechanical Engineer December 2017 – Present

Project: 2 x 150 MW Therma Visayas Energy Project (CFPP) Client – Aboitiz Power

Job Responsibilities:

Oversee the electrostatic precipitator (ESP), cladding and boiler structural works.

Ensure that the modification & rectification works for the punch list and SOR will be done completely.

Prepare PTW-permit to work for lifting operation, confined space, critical, hot & cold works activities.

Performed other assign task by my superior.

KTi PHIL., INC Cebu, Philippines

Mechanical Engineer September 2016 – December 2017

Project: 2 x 150 MW Therma Visayas Energy Project (CFPP) Client – (GPEC / Aboitiz Power)

Job Responsibilities:

Oversee the electrostatic precipitator (ESP), inlet and outlet ducting works.

Assist supervision works for air pre-heater, primary & secondary air fan, silo, screw cooler and coal feeder.

Check, monitor & inspect mechanical installations of the project.

Interpret engineering sketches, specifications, or drawings.

Provide technical support to other employees regarding mechanical design and fabrication works.

Prepare PTW-permit to work for lifting operation, confined space, critical, hot & cold works activities.

Coordinated & participated with QC inspector & clients during final inspection.

Dyna-Mac Engineering Services Pte Ltd. Gul Road, Singapore

Planning Engineer March 2014 – May 2015

Project: FPSO Topside Modules Fabrication for FPSO Cluster 7 Client – BUMI ARMADA

Platforms Fabrication for Mobile Offshore Drilling Unit Client – KEPPEL FELS

Job Responsibilities:

Managed & developed the project schedule and progress tracking using Primavera and excel.

Ensure that the progress matters were coordinated with the site supervisors and sub-contractors.

Prepared & make sure that the weekly and monthly progress reports will coincide with the actual completion on site.

Highlighted delays & other constraints to the project manager and willingly suggested for its possible solution.

Recorded project KPI and provide up-to-date data & summary on progress matters.

Site monitoring and keep a good working relationship with colleagues & clients.

Performed other assign task by my superior and assisting other projects in the absence of in-charge planner.

Oakwell Shipyard Co., Ltd. Sattahip, Thailand

Planning Engineer April 2012 – October 2013

Project: 2 x 53M Offshore Survey Vessel Client – (DAMEN / FUGRO)

CIC Upgrading for Royal Thai Navy Ship - NARESUAN Client – SAAB

Job Responsibilities:

Prepared the project master schedule, manpower histogram, s-curves and developed progress spreadsheets.

Coordinated with engineering, procurement, construction and commissioning in-charges for progress matters.

Provided a regular status report to top management and client on a weekly & monthly basis.

Tracked & monitored the developments of the project and highlighted delays to the project team.

Daily site visit and verify completion of work order as per committed dates.

Liaised with the client side for the work quality and progress matters.

Keppel Shipyard Limited Tuas, Singapore

Planning Engineer January 2012 - April 2012

Project: FPSO CONVERSION FOR FPSO CIDADE DE ANCIETA Client – SBM

Job Responsibilities:

Assisted the lead planner of the FPSO conversion project.

Prepared progress report for piping, outfitting, cable tray installation, pulling & termination, test packs and ITR.

Site monitoring & checking of physical progress and sometimes liaised with the client side.

Tsuneishi Heavy Industries (Cebu), Inc. Cebu, Philippines

Supervisor (Steel Processing) February 2010 - January 2012

Project: New Shipbuilding of Bulk Carriers (52000 / 58000 / 180000) DWT Client – (ASIAN / EUROPIAN)

Job Responsibilities:

Manage project and manpower including in-charge engineers under my supervision.

Oversee the steel processing works (Shot-blast, NC steel cutting/ marking, plate joining, line welding, plate bending & heating, sub-gas cutting and sub-assembly).

Supervision of the planning and material control team for the steel processing outputs segregation, arrangement and delivery system.

Acted for improvement in specific areas which hinders progress and initiated continuous improvement in work processes.

Tsuneishi Heavy Industries (Cebu), Inc. Cebu, Philippines

Field Engineer III (Planning) April 2003 - February 2010

Project: New Shipbuilding of Bulk Carriers (52000 / 58000 / 180000) DWT Client – (ASIAN / EUROPIAN)

PCTC (Pure Car & Truck Carrier – 5100 units’ capacity) Client – EUROPIAN

Job Responsibilities:

Prepared schedule per shipbuilding construction project for block loading & block stage using Microsoft Project & excel.

Prepared & updated the yearly required assembly work volume target of all shipbuilding projects.

Monitored site for the actual progress and verify completion of work activities.

Highlighted delays to the planning manager & the project team and discussed recovery actions.

Conducted weekly meeting with the project team for the schedule status & completion of work order as per committed dates.

Tsuneishi Heavy Industries (Cebu), Inc. Cebu, Philippines

Field Engineer III (Hull Fabrication) December 2000 – April 2003

Project: New Shipbuilding of Bulk Carriers (45000 / 52000 / 58000) DWT Client – (ASIAN / EUROPIAN)

Job Responsibilities:

Oversee the manpower and hull fabrication works (sub-assembly, block assembly, block inspection).

Tracked breakdown, man-hours and development of the fabrication work.

Conducted final inspection of block assembly works (fixing, fitting, welding & fairing) together with the QC in-charge, owner representative and classification surveyor.

Attended the coordination weekly meeting with the sub-contractors for work schedule status, quality and safety.

Follow up the sub-contractors’ committed completion dates and advised rectification works for non-conformities found before & during final inspection.

Tsuneishi Heavy Industries (Cebu), Inc. Cebu, Philippines

Field Engineer III (Hull Erection) December 1999 – December 2000

Project: New Shipbuilding of Bulk Carriers (23000 / 28000 / 45000) DWT Client – (ASIAN / EUROPIAN)

Job Responsibilities:

Oversee the manpower and hull erection works (blocks pre-erection, on slipway & after ship launching).

Monitored the manpower and the hull erection works (welding, fitting & fairing).

Highlighted any delay of work schedule, work quality & safety concern during weekly meeting with sub-contractors.

Tsuneishi Heavy Industries (Cebu), Inc. Cebu, Philippines

Field Engineer II (Hull Erection) April 1998 – December 1999

Project: New Shipbuilding of Bulk Carriers (23000 / 28000 / 45000) DWT Client – (ASIAN / EUROPIAN)

Job Responsibilities:

Supervision of manpower and hull erection works (blocks pre-erection & on slipway).

Attended the weekly meeting with the sub-contractors for work schedule status, quality and safety issues.

Tsuneishi Heavy Industries (Cebu), Inc. Cebu, Philippines

Cadet Engineer (Hull Erection) July 1997 – April 1998

Project: New Shipbuilding of Bulk Carriers (23000 / 28000) DWT Client – (ASIAN / EUROPIAN)

Job Responsibilities:

Lead the completion team for the repair & rectification works (welding, fitting, fairing & air testing).

Conducted preliminary quality inspection and liaised with QC in-charge for the final quality inspection together with the owner representative and classification surveyor.

SAFISCOR Cebu, Philippines

Checker January 1996 – July 1997

In-charge checker for the cement loading and coal unloading.

COCA COLA BOTTLERS PHILIPPINES INC. Cebu, Philippines

Casual Employee April 1995 – September 1995

Inspector at the production line of the bottling process.

EDUCATION

Bachelor of Science in Mechanical Engineering (June 1993 – March 1994) University of the Visayas – Cebu, Philippines

Bachelor of Science in Mechanical Engineering (June 1989 – May 1993) University of Bohol – Bohol, Philippines

CERTIFICATION & PROFESSIONAL TRAINING

20 Million Safe Man Hours without Lost Time Injury (December 23, 2017) KTi PHIL., INC. - Cebu, Philippines

Competent Safety & Health Supervision (July 28, 2011) Tsuneishi Heavy Industries (Cebu) Inc. - Cebu, Philippines

Primavera 6.0 (November 23, 24 & 25 2010) STANFORD IT LEARNING - Cebu, Philippines

Steel Processing Supervision (September 26 - October 8, 2010) Tsuneishi Shipbuilding Co., Ltd. (Tsuneishi Factory) - Hiroshima Prefecture, Japan

High-Value Team Leadership Skills (August 19 & 20, 2008) Tsuneishi Heavy Industries (Cebu) Inc. - Cebu, Philippines

Production Planning & Scheduling (January 10 - July 8, 2008) Tsuneishi Shipbuilding Co., Ltd. (Tsuneishi Factory) - Hiroshima Prefecture, Japan

Competent Supervision Training (August 21 & 22, 2007) Tsuneishi Heavy Industries (Cebu) Inc. - Cebu, Philippines

Practical Problem Solving Skills for Effective Supervision (March 18 & 19, 2004) Tsuneishi Heavy Industries (Cebu) Inc. - Cebu, Philippines

Project Management Seminar (October 21 & 22, 2003) Tsuneishi Heavy Industries (Cebu) Inc. - Cebu, Philippines

Microsoft Project 2000 (October 1, 2 & 3, 2003) INFORMATICS COMPUTER INSTITUTE - Cebu, Philippines

Conflict Management Seminar-Workshop (June 24 & 25, 2003) Tsuneishi Heavy Industries (Cebu) Inc. - Cebu, Philippines

Basic Skills for Effective Supervision (June 26 & 27, 2002) Tsuneishi Heavy Industries (Cebu) Inc. - Cebu, Philippines

Seven Habits of Highly Effective People (October 25 & 26, 2000) Tsuneishi Heavy Industries (Cebu) Inc. - Cebu, Philippines

Management Development Program (September 6, 7 & 8, 1999) Tsuneishi Heavy Industries (Cebu) Inc. - Cebu, Philippines

Hull Construction & Completion (January 10 - July 10, 1999) Tsuneishi Shipbuilding Co., Ltd. (Tadutso Factory) - Kagawa Prefecture, Japan



Contact this candidate