REYNARD B. BOTON
Present address: Farconville subd. Parian Calamba City
Sex: Male
Nationality: Filipino
Mobile. No. 095*-******* /099*-*******
Email Add: *********@*****.***
Passport no: EB7428864
TESDA CERTIFIED: National Certificate II for Refrigeration & Air conditioning.
Apply for: Facilities Technician
OBJECTIVE
To obtain a career opportunity within an organization where I can apply my diversified background and skills to benefit the company.
WORK EXPERIENCE:
Company : I.M. DIGITAL PHILIPPINES INC.
Lot 21-A FPIP Sto. Tomas Batangas
Position : Aircon Technician
Date Hired : February 16, 2015 to Present
JOB SUMMARY:
Responsible for Installation, Relocation, Repair of damage Air con, like replacement of compressor motor and system reprocess of the unit, replacement of fan motor, repair air shower, pass box, door closer, door handle. Piping installation of air supply and exhaust pipe.
Responsible for the Operation, Maintenance of all AHU, Split type Air con, Chiller, Cooling Tower, D.I. Water, Exhaust fan blower motor, Air Compressor, Air shower and Pass Box to support the Production specification and Operational standard in every area.
Company : SNC Lavalin Profac Gulf Management.
DOHA, QATAR
Position : Maintenance Technician
Date Hired : February 03, 2014 to February 03 2015
JOB SUMMARY:
Responsible for the Operation, Maintenance and Repair of all AHU, Fan coil unit, Split type Air con, Exhaust Fan motor, Electrical works, Plumbing works, to support the Building specification and Operational standard in every area.
JOB DUTIES:
Check and Monitor Operational status and Parameters of all AHU water cooled, Fan coil unit, Split type Aircon, Exhaust Fan motor, Fire pump, Generator.
Perform corrective and preventive maintenance work of all AHU, Fan coil unit, Split type Air con.
Responsible for installation, relocation, repair of damage Aircon, like replacement of compressor motor and system reprocess of the unit, replacement of fan motor.
Responsible for repair, replace damage door, door handle, door lock, door closer.
Responsible for replace busted bulb, damage breaker, rewiring of lightings.
Responsible for repair, replace faucet and angle valve, re-piping and installation of water pipe line.
Company : I.M. DIGITAL PHILIPPINES INC.
Lot 21-A FPIP Sto. Tomas Batangas
Position : Aircon Technician
Date Hired : October 01, 2012 to February 1, 2014
JOB SUMMARY:
Responsible for the Operation, Maintenance and Repair of all AHU, Split type Aircon, Chiller, Cooling Tower, Fan blower motor, Air Compressor, Air shower, Pass box to support the Production specification and Operational standard in every area.
JOB DUTIES:
Check and Monitor Operational status and Parameters of all AHU water cooled, AHU air cooled, Split type Aircon, Chiller, Cooling Tower, Dust Exhaust, Fan blower motor, Fire pump, Air Compressor.
Perform corrective and preventive maintenance work of all AHU, Split type Air con, Chiller, Cooling Tower, Dust Exhaust, Fan blower motor, Fire pump, Air Compressor.
Responsible for repair of damage Aircon, like replacement of compressor motor, and system reprocess of the unit.
Repair and Maintenance of Dust Exhaust, Fan blower motor.
Installation of piping for Compress Dry Air, Domestic water supply and PVC Exhaust pipe.
Prepare purchase requisition for all AHU, Split type Air con, Chiller, Cooling Tower, Dust Exhaust, Fan blower motor, Fire pump, Air Compressor.
Change oil of Screw type Compressor, Air compressor, Chiller.
Company : SAMSUNG ELECTRONICS PHILIPPINES
Blk.6 CPIP Batino, Calamba, Laguna
Position : Mechanical Technician
Date Hired : January 30, 2003 to October 5, 2012
JOB SUMMARY:
Responsible for the Operation, Maintenance and Repair of all Facilities Equipment such as AHU controlled by BMS, Split type Air conditioning (Samsung, Hitachi, Carrier, York, Mitsubishi Brand 3TR up to 20TR capacity), Dust Exhaust, Fan blower motor, Fire pump, Air Compressor, Plumbing works for the building and up-grading of piping works.
Responsible for installation, relocation, repair of damage Aircon, like replacement of compressor motor and system reprocess of the unit, replacement of fan motor.
Change oil of Air Handling Unit Screw type Compressor motor and Atlas Copco Air Compressor Motor.
JOB DUTIES:
Check and Monitor Operation of Facilities area Equipments.
Lead Other Technician in Performing corrective, repair and Preventive maintenance work to all facilities area equipment.
Record all activities and status of facilities area.
Forecast of materials and spare parts requirement at the facilities area.
Prepare and follow-up purchase requisition.
Prepare daily work schedule for facilities technician at the facilities area.
Perform other work assign by the superior.
Company : SYNERTRONICS INC.
Brgy. Batino Calamba City
Position : Air conditioning Technician
Date Hired : April 14, 1997 to August 21, 2002.
JOB SUMMARY:
Responsible for the Operation, Maintenance and Repair of all Water cooled Air conditioning and Portable Chiller unit to support production specification. Exhaust motor, Air Compressor, Plumbing works for the building.
Responsible for repair of damage Air con like replacement of motor compressor, relocation of Air con, system reprocess.
JOB DUTIES:
Check and Monitor Operational status and parameter of all Air con, Portable Chiller Cooling Tower.
Perform corrective and preventive maintenance work of all Air con, Portable Chiller and Cooling Tower.
Record all activities and status of area of responsibility.
Prepare purchase requisition for Water cooled Air con, Portable Chiller and Cooling Tower.
Perform other related work at the facilities area assign by superior.
EDUCATIONAL BACKGROUND:
Vocational : Rizal College of Laguna
Address : Parian National highway Calamba, City
Course : Refrigeration/Air Conditioning
Date Graduated : March 18, 1995
High School : Saint John Academy
Address : Calamba, City
Date Graduated : March 26, 1994
TRAININING & SEMINARS ATTENDED AT SAMSUNG ELECTRONICS
1. Meralco Foundation : October 15 to November 26 2012
Refrigeration & Air conditioning
2. Standard First Aid Training : March 23-26, 2004
3. Basic Life Support : March 27, 2004
TRAINING & SEMINARS ATTENDED AT SYNERTRONICS INC.
1. Substation Operation and Maintenance : April 15, 1997
2. Safety Preventive Accident : April 23, 1997
3. Facilities Maintenance S. O. P.
Start-up/Shut-Down Procedure : April 28, 1997
SPECIAL SKILLS:
Proficient on installing, trouble shooting and maintenance of all kinds of Air Conditioning Unit.
Knowledge in pipe, copper, and PVC welding.
Knowledge in plumbing.
Knowledge in Electrical Wiring.
Vehicle Driving
Computer Literate
THIS IS TO CERTIFY THAT ALL INFORMATION MADE BY ME IN THIS RESUME IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE.
Reynard B. Boton
Applicant