WORK IN VARIOUS COUNTRY COMPANY & DATE, YEARS
FROM
TO
POSITION
NAME & ADDRESS OF EMPLOYED & COUNTRY
01.10.2013
02.06.2016
Instrumentation construction site incharge MEDGULF
Qatar petroleum Ras Gas Fap project & ling truck loading
19.07.2012
30.09.2013
Instrumentation construction site incharge
RAS GAS, QATOR HELIUM 2 PROJECT AIR LIQUID, FRANCE.
28.04.2011
25.03.2012
Superintendent of instrumentation
TASNEE SAMCO AA PROJECT & SAUDI ARAMCO TOTAL REFINING & PETRO CHEMICAL COMPANY (C/O. M/S-NSH).
08.03.2009
09.02.2011
Superintendent of instrumentation
SAUDI KAYAN KBR SAUDI POLYMERS NCP JGC CO NSH.
22.03.2008
29.05.2008
Instrument engineer
M/S. AL-AMEER CO., KUWAIT. OIL & GAS CO. SHUT DOWN, KWAIT.
29.03.2007
06.11.2007
Instrument supervisor
M/S. KHARAFI NATIONAL K.O.C PROJECT M/S. DAELIM, KUWAIT
18.07.2005
25.05.2006
Instrument supervisor
M/S. GS. DAEWOOD LAFFEN REFINERY PROJECT, M/S. DAYMYYUNG, QATAR.
11.11.2003
30.04.2004
Instrument foreman
M/S. DODSAL & CO. NOGP OXY OMAN M/S. SAUDI ARAM CO
28.11.2002
22.08.2002
Instrument foreman
M/S. DODSAL 85 CO. QATAR CHEMICALS
1997
1999
Lead technition
M/S. KRAFI NATIONAL K.O.C KUWAIT
16.03.1996
27.10.1996
Instrument foreman
M/S. POSTER WHEELER SIEMENS THE SINGAPORE AROMATIC PROJECT
1992
05.07.1994
Instrument foreman
M/S. M.F. NENT 85 CO. MINA – AL-AHMADI – REFINERY, KUWAIT
1987
1990
Instrument senior tech
M/S. IM CI. MINAL – AL – ABDULLAH REFINERY, KUWAIT
1999
2000
E & i site in charge
VARIOUS SITE IN INDIA, CPCL, HPCL, TPL
25.04.1995
25.05.1995
Instrument foreman
M/S. MED GULF QGPC LNG 1 & 3 SHUT DOWN, QATAR
03.05.1995
15.03.1996
E & i site in - charge
M/S PROCESS CONTROL, CHENNAI VARIOUS SITE.
1990
1992
E & i site in - charge
M/S. INSYS VARIOUS SITE IN INDIA
1983
1987
Instrument tech
M/S. CONSOLIDATED & CINTROLS PVT LTD., CHENNAI, INDIA
DETAILS OF WORK
1.Worked as a site incharge in Helium 2 recovery Project (C/O. Ras Gas) – Air Liquide, France.
2.Worked as a instrumentation superintendent unit 102, 92 Hydrigen Olant & Hydrigen Recovery plant (C/o. MS – NSH)
3.SABIC SAUDI KAYAN, KBR OLEFINS PROJECT. NCP&JGC COPARATION / NASSER AL – HAJRI CORP
Worked as a Instrumentation Superintendant, Precomisning: loop Check, Calibration, Constraction (man power handling)
4.M/s KUWAIT OIL & GAS COMPANY KUWAIT AL-MEER
Worked as a Instrumentation Engineer four KOC Shut down, LOOP Checking Commissing.
5.M/SGS DAEWOO LAFFAN REFINERY, PROJECT QATAR DAE / MYING
Loop Checking, Continuity Check, Calibration, All Type of inst Instrument Installation, Panel Erection, Cable glandingTermination bath side panel side JB side: INST side, tray Erection, Impluse Tube Fixing, Worked as a Instrument Supervisor.
6.M/S KUWAIT OIL & GAS COMPANY KUWAIT DAELIM, KHARAFI NATIONAL COMPANY
Worked as a Instrument Supervisior for gathering center EFFUENT WATER TREATMENT PLANT Commissing, loop Checking, Calibration, Inst Insulation Panel fixing, Cable laying, Glanding termination, (Panel Side, JB side, INST side) Cable Tray work Tank work Tank Area, Chemical degassing Tank, Pump suckition, and discharge. ETC.
7.M/S NOGP – OXY PROJECT SAFAH OMAN M/S DADSAL E.P.C.
Worked as a Inst Foreman, Panel Election, Tray Fixing, PLC, Marshalling, Cable laying glanding & Termination, INST Fixing, Like Solar Turbine, Booster Compressor, LOOP Checking & Commixing.
8.M/S SAUDI ARAMO RAS TANURA REFINERY SAUDI SMAMPROGETTI C/O DODSALS CO
Worked as a instrument foreman in J-64 No – 1 KHUFF – CONDENSATE – FRACTIOKATION PROJECT area 1:2:34 INST installation, Tray Fixing, Cable Laying glanding 8s Termination JB, Panel, INST side Continuity Checking, LOOP Checking, INST Calibration, All Type of INST of INST ETC.
9.M / S QATAR CHEMICALS QATAR DADSAL & CO
Worked as a INST F6RMAN in Etheylene – PALNT, SRU, ABR, FERNACE, BOILER, PANEL ERECKION, JB, INST INSALATTION, INST calibration cable Laying, Glanding 85 Termination, Continuity, Check, Loop Checking Commissing. All Type of INST Etc.