CURRICULUM VITAE (CV)
Name: AYAN BHATTACHARYA
Mobile: 700-***-****, 987-***-****
Email: *******@*****.***
Seeking entry level asignment in Design Engineering,Production Engineering,Quality
with a growth oriented organization.
AN OVERVIEW:-
Completed:
B.Tech in Electrical Engineering from West Bengal University of Technology in 2011.
Well versed with Auto CAD, Auto CAD Electrical, Microsoft Office (MS Office).
Proficiency at gasping new technical concepts quickly and utilizing it in a productive manner.
Believe in continuous learning and an innovative approach.
ACADEMIC:-
B.Tech in Electrical Engineering from St. Thomas’ College of Engineering & Technology (Affiliated to
West Bengal University of Technology, Approved by AICTE), Kolkata, West Bengal in 2011. Secured
7.12 (DGPA) / 63.7%.
Class 12th (Science Stream) from Sri Ramkrishna Sikshalaya (WBCHSE Board), Howrah, West Bengal
in 2006.Secured 60.2%.
Class 10th from Sri Ramkrishna Sikshalaya (WBBSE Board), Howrah, West Bengal in 2004.Secured
69.62%.
ACADEMIC PROJECT:-
Project on Automatic Load Frequency Control.
INDUSTRIAL TRAINING DETAILS:-
Industrial Training taken from CESC at Taratala in Kolkata in West Bengal.
COMPUTER SKILLS:-
AutoCAD 2-D, 3-D; AutoCAD Electrical; Microsoft (MS) Office.
PROFESSIONAL WORK EXPERIENCE:-
DYUTI INITIATIVES PVT. LTD., Kolkata, West Bengal
Electrical Engineer (10.07.2017 to 24.05.2018)
Designing of Cable Tray Layout Plan, Sectional Views (Shaft Section & Route Section) of Cable Tray, Sectional Views of Cable Tray Layout Plan, Cable Slit Layout Plan, Sectional Views of Cable Slit, Motor’s Equipment Layout Plan of Pump House, Ash Handling System’s Silo Area; Designing of Earthing Layout of Pump House, Ash Handling System’s Silo Area; Designing of Illumination Layout of Pump House; Designing of Civil Assignment Drawing for Cable Tray Layout of Pump House; Designing of Single Line Diagram of MCC Panel of Pump House in Auto CAD.
Estimation of Cable Sizing Calculation, Earthing Calculation, Illumination Calculation of Pump House; Estimation of Bill Of Quantity or BOQ of Cable Tray Layout Plan, BOQ of Earthing Layout of Pump House, Ash Handling System’s Silo Area; Estimation of Cable Scheduling of Pump House, Ash Handling System’s Silo Area in Microsoft Office
(MS Office) Excel.
GOLDEN ELECTRIC COMPANY, Howrah, West Bengal
Electrical Engineer (10.07.2014 to 30.06.2017)
Designing of General Arrangement (GA) Layouts, Cable Trench Layouts, Single Line Diagrams, Earthings, Site Plans of 33kV Outdoor Sub Station, 33kV Indoor Sub Station, 11kV Indoor Sub Station, 6kV Indoor Sub Station; Designing of Foundation Drawing of Outdoor/Indoor Type Distribution Transformer; Designing of Foundation Drawing of 33kV Outdoor Sub Station Equipments i.e. 33kV Outdoor Type Isolator, 33kV Outdoor Type Vacuum Circuit Breaker
(VCB); Designing of General Arrangement (GA) Drawing, Single Line Diagram, Control Circuit Diagram of Electrical LT Panels (LT Distribution Panel, Automatic Power Factor Correction Panel, Motor Controlling Centre Panel, Battery Charger Panel) in Auto CAD.
Estimation of fabrication costing of Electrical LT Panels (LT Distribution Panel, Automatic Power Factor Correction Panel, Motor Controlling Centre Panel); Estimation of Breakup of
Total Costing Charges of Electrical LT Panels (LT Distribution Panel, Automatic Power Factor Correction Panel, Motor Controlling Centre Panel) in Microsoft Office (MS Office) Excel.
Making of Quotation, Bill (Tax Invoice, Proforma Invoice, VAT Bill, LP Bill), Material List of Indoor (11kV, 6kV) & Outdoor Sub Station (33kV), Electrical LT Panels (LT Distribution Panel, Automatic Power Factor Correction Panel, Motor Controlling Centre Panel, Battery Charger Panel); Making of 11kV HT VCB Specification in Microsoft Office (MS Office) Word.
Checking of Job done at Site as per Designed Drawing & Made Quotation.
RENESA ENGINEERING PVT. LTD., Kolkata, West Bengal
Electrical Engineer (28.08.2013 to 11.02.2014)
Designing of General Arrangement (GA) Drawings, Single Line Diagrams, Control Circuit Diagrams of Electrical LT Panels (LT Distribution Panel, Automatic Power Factor Correction Panel, Motor Controlling Centre Panel) in Auto CAD.
Estimation of Fabrication Costing of Electrical LT Panels (LT Distribution Panel, Automatic Power Factor Correction Panel, Motor Controlling Centre Panel) in Microsoft (MS) Excel.
Making of Quotations of Electrical LT Panels (LT Distribution Panel, Automatic Power Factor
Correction Panel, Motor Controlling Centre Panel) in Microsoft (MS) Word.
VENUS ENGINEERING WORKS, Kolkata, West Bengal
Electrical Engineer (01.04.2012 to 31.03.2013)
Designing of General Arrangement (GA) Drawings, Single Line Diagrams, Control Circuit Diagrams of Electrical LT Panels (LT Distribution Panel, Automatic Power Factor Correction Panel, Motor Controlling Centre Panel), Street Light Poles Drawings in Auto CAD.
Estimation of Fabrication Costing of Electrical LT Panels (LT Distribution Panel, Automatic Power Factor Correction Panel, Motor Controlling Centre Panel) in Microsoft (MS) Excel.
Making of Quotations of Electrical LT Panels (LT Distribution Panel, Automatic Power Factor
Correction Panel, Motor Controlling Centre Panel), Street Light Poles, Cable Trays in
Microsoft (MS) Word & Send the Corresponding Quotations to the Clients through email to
get the Work Orders from the Clients.
HOBBIES AND INTERESTS:-
Listening Songs, Reading Books & Playing Indoor & Outdoor games.
PERSONAL DETAILS:-
Date of Birth : 4th August, 1987
Address : Balitikuri Kalitala, Howrah – 711113, West Bengal
Contact Numbers : 700-***-****, 987-***-****
Language Known : English, Hindi, Bengali