CURRICULUM VITAE
clement owusu
MICROWAVE TX INTEGRATOR (JUNIOR )
PERSONAL DETAILS:
Surname: OWUSU
Other names: CLEMENT
Date of birth: 28th April, 1984
Sex: MALE
Marital status: MARRIED
Nationality: GHANAIAN
Address: P.O.Box NG462 Nungua-Accra
Phone: +233-*********
E-mail: **************@*****.***
Career Objective:
To be a part of a growth oriented challenging environment in the telecommunications industry where my Educational, Technical, Analytical skills will be utilized to the optimum, which will add to the organizational as well as individual growth.Expectional skills in resolving issues.
Experience:
9years in GSM Operation, Installation, MS operations, Supervision and Integration of 2G and 3G,LTE (4G)cabinets, Transmission and QAULITY,MRC(Ku-Band and C-Band)
Key Skills:
Expert in the field of-
I,C&I: Installation & Commissioning and integration
O&M: Operation & Maintenance (including Preventive and Corrective Maintenance)
QA: Quality Assurance & Acceptance of GSM,UMTS and TRANSMISSION Access Network,RNC,BSC,Transmission,Node Bs,LTE RAN
Competent in the implementing, installation, testing and commissioning for Roll-out project of, Ericsson ( Ericsson Traffic Node Release 3,5.4 /(TN and Hi-Cap) and Mini-Link E, MLLH transmission cabinets,ERICSSON RBS 2206, 2207, 2116, 3216, 3116,2216,2111,3518 and 3418(fibre optic),6101,6201,6601,6102,6301 family,(Traffic node and Network Element,MOSHELL)Integration.
Transmission: Traffic Node,Mini Link E,Mini Link TN and MLLH BACKBONE cabinets,MSM
Job History in Brief:
ERICSSON GABON/AIRTEL GABON
INTEGRATION AND SUPERVISING ENGINEER - GABON
March - June 2018
Job Summary:
Supervision of installation of RBS 6130 cabinet
Configuration of Baseband 5212 on the site
Single band antennas swap to Triband antennas and decommissioned
Survey for LTE Upgrade and Transmission
ERICSSON AB GHANA/MTN MRC PROJECT
INTEGRATION AND SUPERVISING ENGINEER- GHANA
September,2016- February, 2017
Job Summary:
Integration of satellite link (K-band) and panning for alignment
Configuration of 2G using OMNI directional antenna and TCU integration
Supervision of installation of solar power panels and RBS 6301
Quality and assurance (supervise ASPs and audit sites)
Survey for new or Greenfield sites
Site integration with back office satellite engineer
Supervision of ASPs to install Radio and Satellite.
ERICSSON AB CAMEROUN/MTN MLTX AND LTE PROJECT-CAMEROUN
TRANSMISSION ENGINEER and RADIO ENGINEER
October, 2015-August, 2016
Job Summary:
Installations of MLTX (waveguide,Splitter,couplier, Cabinet and Alignment ) At Gomala, Kentzou,Yola and Yokaduma.
Ceragon swap to Minilink Traffic node
Minilink E swap to Minilink Traffic Node
Supervise ASP on installations and material delivery
Supervise ASPs of installation of MLTX cabinets and decommission existing links with different Vendor (Ceragon and Huawei RTN)
Installations of MINI LINK TX BACKBONE cabinets and cutover.
Configurations of 4(1+1),3(1+1),2(1+1),2(1+0) and cutover.
Cutover from CERAGON equipment s to Ericsson MLTX cabinets.
LTE Integration and supervision
3G and LTE supervision and integration and Quality assurance
2G integration (IP RAN Implementation and TCU)
ERICSSON AB GHANA-MTN PROJECT/MS-FSO
RADIO INTEGRATOR AND SUPERVISOR
January, 2010 August, 2015
Job Summary:
Supervise ASP for installation and commissioning, cutover from Sagem (SLF) equipment to Ericsson Mini link Traffic Node and integration of the Ericsson RBS 6601 Node B cabinet from site and RNC.
Traffic routing and using the EMAS to integrate the RBS 6601, 6101, 6102 and 6202, 6201
Loading of CV and configuration of the OAM and Site Equipment script.
Test calls on voice, video and internet browsing
Troubleshooting of alarms MINI LINK with related software upgrade issues on SoEM and RBS 6601 Node B remotely and on-site.
Integration of RBS from the RNC using Moshell commands and SECURE CRT
Integrate RBS 6601 with PDH and SDH
Troubleshooting the Node B (RBS 6601, 6201 and 6101, 6202, 6302 and 6102)
Good knowledge on MOSHEL/OSS, IP, 3G RNC integration
Integration of MBC 2G 1800 and Add-ons installations (RBS 2116V2, 2216V2)
3G 6000 series implementation, commissioning and integration.
SIU implementation (IP RAN) and ABIS
Configuration and assignment of packet links and PDH.
OMS/MARCONI transmission with Long haul configurations.
Troubleshooting Node B alarms using Moshell
TRANSMISSION STRUCTURES-GHANA
RADIO TECHNICIAN /INSTALLER
September 2008-December 2009
Job summary:
1. Installation GSM and microwave antennae equipments (ERICSSON RBS 2116,2216,20
2. Commissioning of new link and aligning using MINI LINK
3. Using Bird site analyzer to check and perform RF performance check
4. Performing PAT with the customer or vendor
5. Aligning MW equipments
6. Mini link configuration
7. Rigging
Educational Qualification:
INSTITUTION QUALIFICATION YEAR
ADMIN TELECOMS ACADEMY CERTIFICATE 2012-2012
IN TRANSMISSION
GHANA TELECOM 2009-2011
UNIVERSITY COLLEGE DIP. IN TELECOM ENG.
KUMASI TECHNICAL INST. CERTIFICATE 2004-2006
Professional Trainings / Courses:
1. Ericsson QUASIS Certification
2. Ericsson RBS 6000 cabinet s certification
3. Installation of Ericsson cabinet 2111 and 3418 & 3518 fiber optic, by Ericsson Ghana
4. Installation, Commissioning, Operation and Maintenance of RBS 2000, 2x16 series by Ericsson Ghana.
Computer Proficiency:
Operating systems : Windows 95, 98, ME, XP, WIN7
Office : MS Word, MS Excel, MS PowerPoint
GSM Equipment Knowledge (Working On):
1.Ericsson RBS 2202, 2206, 2116 .,2111(with BBS), 2216, 3216, 3116,
RBS 6201, 6102, 6101, 6601,6301 family
2.Bird and Aritsu GSM site analyzer
3.SIU /TCUImplementation
4.MRC
Personality Traits:
Result oriented and team player
Excellent interpersonal relation and have an initiative and synthesis mind,
Sense of urgency and customer focus
References:
Percy Antwi Agyei
Hub Central IT Manager,
Ericsson AB, Ghana
Email:*****.*****-*****@********.***
Tel:+233-*********
2. Socrates Kodjo Ampim
Implementation Manager,
MTN Project, Ericsson AB, Ghana
Email:********.*****.*****@********.***
Tel:+233*********