Benjamin Jr. Sanguyo Cubol
Emerald Crest Subdivision, Block 5 Lot 30 Bgy San Jose, Dasmarinas City 4114, Province of Cavite
// 608 San Francisco Street Bgy Manuyo I Las Pinas City 1744, Metro Manila PHILIPPINES
PROJECT IN-CHARGE/ PROJECT SITE COORDINATOR/ SR. ARCHITECT
A Project -In Charge, Project site coordinator and a Senior Architect-Project Site Manager for over 20-year record of success overseeing all phases of multimillion-dollar design, project construction and Project Site Management for government and private sectors (locals and of overseas as Expatriate).
Experience includes from Project Design Proposals for Clients, Preparation of Bill of Materials, Preparation of Work Schedule, Oversee and Checking of Shop Drawings for construction, Site monitoring, Supervise manpower (50 to 85 approx number) allocation and scheduling for each project, monitor material sample for approval prior to implementation and in particular, for Interior Fit Out works and QA/QC works
As Project Manager Role, Site coordination with team of Engineers, monitors daily progress and close in monitoring of contractors project schedule and activities. As an additional scope, it varies with weekly and monthly progress report, evaluation of site progress.
Particular projects completed and becomes operational includes High-End Hospital Projects, High End Housing Complex and Privately owned banks, all overseas.
With strong back up of proven credentials-local and overseas; a proven history of quality projects on-going and completed.
Key Skills
Knowledge in using Autocad (2D)
Knowledge in Project Management Tools and Technique
Knowledge in preparation for Project Proposals/Estimates and for Bidding
Knowledge in using Intergraph Microstation CADD software; Scanning
Site Safety Compliance Procedure
Sub-contractor and Manpower
management and Direct Monitoring
QA/QC in Architecture and Finishing including Interior Fit out works
Project Highlights
PADI Design Innovations as Project In-Charge; Technical Head, August 2017 to June 23 2018 (Special Project basis)
Product supplied and installation of environmental friendly WPC (Wood Plastic Composite) for Pool Decking System, Interior-Exterior Wall cladding, Fence/Gates, Interior ceiling works using Japanese Product Technology (as primary supplier).
Managing and multi-tasking works visiting projects, attending meetings and overseeing works in progress and to name a few about to be completed local projects;
Private Island resort located in Roxas, Palawan
Crimson-Filinvest at Boracay, Aklan,
Arbor Lanes I and II under Ayala Land Inc. in Taguig City
Aqua-Bora Boracay, Aklan
Various high end housing units (pool decking and cladding works) under different ownership located at Forbes Park, Dasmarinas Village and Urdaneta Villlages in Makati City respectively.
The highlights of work responsibility include but not limited to the following:
a.Provide and manage Design submittals and Shop drawing guidelines for construction
b.Provide schedule of works and allocation of manpower required for the project; material preparation and necessary tools
c.Site management and coordination with clientele by providing given project time table requirements
d.Provide and monitor site rectification-maintenance works on all projects under warranty service.
e.Site monitoring works and project management; attend coordination meeting
f.On site coordination by providing additional details, recommended options and actual site implementation
Office management role:
Provided leadership managing to upgrade and improve the Internal Organizational Structure of PADI Office which includes but not limited to the following:
a.Provided Organizational Structure and explain, define each position roles, flows and responsibilities
b.The roles for the office management and define the system.
c.The flows, responsibilities and limits for the production section that creates in-house fabrication work, assignments of manpower and material preparation and acquisition.
d.Chair monthly coordination meeting and progress update
Personal and as Private Capacity as an Architect from October 2016 to February 2017
Two (2) Private Residences located in Metro Manila
Project Cost: combine costing of PHP 5.50M.
The responsibilities includes but not limited to Design preparation for client’s approval; joint site visit with client and provide the following services;
a.Advice and recommendation with respect to preliminary drawing for approval
b.Provide preliminary drawing for building approval and shop drawing for construction upon approval.
c.Provide Bill of Materials and cost estimates
d. Assist the client for Bank submission of requirements for loan approvals
e.The scope of services provides for schedule of work; Program for payment and schedules to Bank as may be required
f. Provide Schedule of Project completion of Work; Manpower allocation per running progress of work; Material allocation and advisement e.g. Interior Fit-Out works finishes and Landscape Works on Pro-Bono works.
g.Provide site management and coordination meeting with approved sub-contractor and acting as client’s representative.
Technical Development Head-Senior Architect from May 2016 to September 2016 (Special Project on contractual)
Serve as Team Leader in the preparation of subdivision planning proposal (foreign principal client) outside Metro Manila area.
Lead the team in preparing the client’s requirement for the proposed package which include but not limited to the following works:
a.Site visit and provide study per client’s requirement
b.Research for the requirement as per local regulatory laws and ordinances
c.Provide preliminary studies for submission to client for inter-action and coordination
d.Prepare preliminary overall layout for presentation
e.Provide necessary adjustment per client’s comment and provide final preliminary project plan with initial cost estimates for approval
Other related responsibility includes monitoring undergoing projects and provide advisement to sub-contractor for necessary adjustment.
Provide meeting updates to clients and monitor project completion schedule per agreed timetable.
Project In-Charge (Senior Site Architect) in Abu-Dhabi UAE from Dec. 2015 to March 2016 as reliever
Projects involvement on Interior Fit-out for High End residential complex.
Responsibility includes studies of complex interior design material for client’s approval and installation works.
Prepare Project Work Schedule relevant to manpower, material allocation per activity timetable.
Manage weekly coordination meeting and provide inputs for recommendation and other necessary issues that requires speedy disposition of work based on a given time table.
Coordinate with various intra-services such as MEP that involves relationship in compliance with above ceiling structure as an example.
Senior Architect in Kuala Lumpur Malaysia from November 2007 to September 2015 under Two (2) different consulting firms specializing in Hospital Design Projects, High End Residential housing projects respectively and acting Project Site Management on full time direct monitoring works
The project worth has a combine gross worth a total of RM80M.
Acting as Team Leader in providing direction in preparation for site requirements such as but not limited to the following:
a.All approved architectural shop drawings and to provide awarded contractor for construction drawing submission.
b.Review submitted work time table and to provide advisement for the necessary changes prior for approval and submission to client.
c.Review and monitor approved contractor’s site preparation by following the basic safety regulation and municipality approved fencing, site clearing operations and others.
d.Appraise contractor’s readiness and submittal schedules.
e.Chair kick-off meeting and introduction for proper disposition of the system and operation.
f.Manage contractor’s responsibility in running the day to day operation and provide advice and recommendation when need arise such as technical drawing discrepancies of other services, contracts and in particular, material sample submitted for review and approval prior to installation works
g.Monitor strictly compliance for QA/QC management.
Senior Architect-Project Manager in Saudi Arabia (under Two (2) different prestigious consulting offices dating back from July 1999 to November 2007)
Serve as full time Project Manager; managing Two Private Banking Institution, modern and High End government owned Border Post project in Jizan Saudi Arabia.
Provide full time Site Management services of various contractors working for the project.
Provide fortnightly, monthly monitoring reports to Ministry of Defense in compliance with QA/QC requirements.
Provide recommendations, change order requirement and to justify known changes for approval.
Provide advisement to contractor, recommend changes based on approved plans and layouts
Strictly enforcing the quality of works methodology and following project scheduling works as basis.
Personal
Name: Benjamin S. Cubol Jr.
Address: Block5 Lot 30 Emerald Crest Subdivision Bgy San Jose
Dasmarinas City Dasmarinas, Cavite 1444
Email: *********@*****.***
***************@*****.***
***********@*****.***
Telephone: +63-918-***-**** (mobile); +632-***-**** (Residence)
Civil Status: Married
Date of Birth: 12 July 1955
OBJECTIVE:
To gain more insights of the present trend of modern and Green Architecture, to further develop more advance knowledge; meeting more people and exchange fruitful exchanges
EDUCATION:
BS ARCHITECTURE CLASS OF 1981 AT FEATI UNIVERSITY MANILA
Major: Design and Building Construction
BS CIVIL ENGINEERING (4TH YEAR-UNDERGRADUATE) AT FEATI UNIVERSITY MANILA
Major: Building Construction
Minor: Project Site Management
SEMINARS ATTENDED:
Construction Management at Executive Development Academy in Manila
Major: Building Construction
Minor: Project Site Management
Total Quality Control at Ateneo Graduate of Business School inManila
Major: Project Management
Minor: Project Planning
Community Membership:
Vice President Emerald Crest Subdivision Home Owners Association
Member Christian United Fellowship International
EMPLOYER SUMMARY
Project In-Charge
Technical Head
PADI Design Innovations
Aug 23, 2017- Aug. 2018
Project In-Charge-Architect
Private Practice
Oct. 2016 –Feb. 2017
(Personal Project)
Project In Charge-
Technical Development Head
Lagman-Garcia Incorporated
Bacoor, Province of Cavite
05 May2016-24 Sept 2016 (Project Basis)
Project In-Charge
Sr. Site Architect
Golden Llc
Abu Dhabi, UAE
Dec. 2015 – March 2016
(Reliever-3-mo. Contract)
Sr. Architect-Medical Planner
Perunding Alam Bina Sdn Bhd
Kuala Lumpur, Malaysia
July 2015 – September 2015
(Work Permit Issue)
Sr. Architect- Project In-Charge
Almaz Architect Sdn Bhd
Kuala Lumpur, Malaysia
January 2013 – July 2015
Sr. Architect-Medical Planner
Project In-Charge
Mediconsult Planning and Consulting Services Sdn Bhd
Kuala Lumpur, Malaysia
November 2007 – July 2013
Sr. Architect
Lyon and Associates
Manila, Philippines
September – November 2007
Sr. Architect-Project Manager
East consulting and Engineering Centre
Riyadh, Saudi Arabia
April 2000 – August 2007
Sr. Architect
SIma Malak and Associates
Riyadh, Saudi Arabia
July 1999 – April 2000
Architect IV
DENR (under EU Programme)
NCR, Philippines
March 1999 – March 2000
Project Site Coordinator
J&A Associates SdnBhd
Kuala Lumpur, Malaysia
April 1997 – October1999
Cad Architect-Project Site Coordinator
ABV Rock Group
Riyadh-Jeddah, Saudi Arabia
May 1993 – May 1996
Cad Designer on Microstation Software and Hardware
ARABSCAN Consulting Engineers
Al Khobar, Saudi Arabia
July1990 – July 1992
Draftsman-Trainee on Japan Building Standard
Titan International
Manila, Philippines
1998 – July 1990
Sr. Architectural Draftsman
RADI Consulting Architects and Engineers Al Khobar, Saudi Arabia
March 1987 – January 1988
Sr. Structural Draftsman
FEAL IBS (Italia)
Riyadh, Saudi Arabia
October 1984 – August 1986
Jr. Architect - Draftsman
DUMEZ (France)
Riyadh, Saudi Arabia
October 1984 – August 1986
Project Site Coordinator
Kenko Construction and Development Corporation
Manila, Philippines
March 1982 – April 1984
Draftsman-Trainee –
Project Site Inspector
Environs Systems Group Inc.
Manila, Philippines
January 1981 – January 1982
SIGNED:
Benjamin Jr. SanguyoCubol