ASIM HABIB
V***, COUNTRY TOWER PHASE * **-B BUFFER ZONE NORTH KARACHI, PAKISTAN
MOBILE #: +923*********
E-MAIL: ***.*********@*****.***
OBJECTIVE
To work with a team of professionals in an organization which can best utilize my ability for enhancing skills as well as career growth. ATTENDED SEMINAR
INTERNATIONAL SEMINAR ON DISCUSSION OF EARTH-QUAKE AT NED-UNIVERSITY OF ENGINEERING & TECHNOLOGY KARACHI.
NATIONAL SEMINAR ON DISCUSSION OF CONSTRUCTION SITUATION OF KARACHI. JOB RESPONSIBILITIES
MODELING, ANALYSIS & DESIGN OF STRUCTURE.
MANUAL DESIGN OF SMALL STRUCTURE.
MONITORING AND CHECKING OF DRAFTING WORKS.
SITE VISITS FOR CHECKING OF REINFORCEMENT AND CONCRETING.
COORDINATION BETWEEN ARCHITECT, MEP AND STRUCTURAL CONSULTANT.
COORDINATION BETWEEN CONTRACTOR AND STRUCTURAL CONSULTANTS.
VETTING OF DESIGNED STRUCTURES.
MAKING RCC STRUCTURE ACCORDING TO DRAWING INCLUDING 4 STOREYS BUILDINGS, MANHOLE, DRAINAGE LINES, SMALL FOUNDATION, VESSEL FOUNDATION AND BEAM & SLAB ON GRADE.
MAINTENANCE OF BUILDING
WORKING EXPERIENCE
FROM NOV 2016 TO TILL NOW ARE WORKING OWN BUSINESS.
DESIGN AND ANALYSIS OF RCC AND STEEL STRUCTURES IN SAP, ETABS AND SAFE.
FROM JAN 2016 TO OCT 2016 IN TAHIR IMRAN ABDUL AZIZ CONTRACTING EST. IN SAUDI ARABIA RIYADH AS A STRUCTURAL ENGINEER .
DESIGN AND ANALYSIS OF STEEL STRUCTURES AND CONCRETE STRUCTURES IN SAP ANALYSIS, ETABS AND SAFE.
PLANNING OF PROJECTS IN MS PROJECT.
DESIGN OF STEEL CONNECTIONS IN RAM CONNECTION SOFTWARE
DESIGN OF WELDED & BOLTED CONNECTIONS THROUGH HILTI SOFTWARE.
CALCULATION OF TOTAL STEEL REQUIREMENTS THROUGH DRAWINGS.
SITE INSPECTIONS FOR CONCRETE AND STEEL.
FROM SEP 2011 TO DEC 2015 IN BRAINS CONTRACTING COMPANY LTD WITH JOINT VENTURE MCE GULF CO. LTD IN SAUDI ARABIA AS A PROJECT ENGINEER CIVIL.
MAKING BAR BENDING SCHEDULE
STEEL FIXING ACCORDING TO DRAWING
CHECKING OF CONCRETE AT SITE
MEETING WITH CLIENT FOR APPROVAL OF WORK
MAKING READY FOR INSPECTION REPORT
HOSPITAL MAINTENANCE WORK AT JIZAN SAUDI ARABIA
FROM MAY 2010 TO FEB 2011 IN AL-YASAT ENGINEERING CONSULTANCY AL-AIN UAE AS A STRUCTURAL ENGINEER.
MANUAL DESIGN OF INDUSTRIAL BUILDING. (2 STOREYS)
MANUAL DESIGN OF INDUSTRIAL BUILDING. (3STOREYS)
CHECKING OF STEEL & CONCRETE AT SITE
FROM JUNE 2009 TO MAY 2010 IN KETTANEH CONSTRUCTION COMPANY SAUDI ARABIA AS A STRUCTURAL SITE ENGINEER IN SAUDI KHYAN HDPE PROJECT JUBAIL SAUDI ARABIA.
MAKING BAR BENDING SCHEDULE
STEEL FIXING ACCORDING TO DRAWING
MEETING WITH CLIENT FOR APPROVAL OF WORK
MAKING READY FOR INSPECTION REPORT
FROM DECEMBER 2008 TO MAY 2009 IN PAKISTAN, PRIVATE WORKS MEANS DESIGNING OF BUILDINGS WITH ETABS AND CHECKING AT SITE.
FROM NOVEMBER 2008 TO DECEMBER 2008 IN UAE
FROM SEPTEMBER 2007 TO 5TH NOVEMBER 2008 IN ALLIANCE CONSULTANT PVT LTD. AS A STRUCTURAL ENGINEER IN DESIGN DEPARTMENT IN THE FOLLOWING PROJECT
MANUAL DESIGN OF GENERATOR ROOM OF MEHRUNISA HOSPITAL IN KARACHI. (2 STOREYS)
MANUAL DESIGN OF FACTORY BUILDING IN SITE KARACHI. (9STOREYS)
MANUAL DESIGN OF FACTORY BUILDING IN KORANGI KARACHI. (4STOREYS)
VETTING OF DIAMOND RESIDENCY IN DRIG ROAD KARACHI FROM ETABS. (18 STOREYS)
MANUAL DESIGN OF PRAYER BUILDING IN PECHS COLONY KARACHI (4 STOREYS)
DESIGN OF ZN TOWER IN ALAMGIR ROAD (15 STOREYS)
DESIGN OF CITY TOWER IN ALAMGIR ROAD (14 STOREYS)
DESIGN OF SAIMA MALL KARACHI (22 STOREYS)
WORLD TRADE CENTER (39 STOREYS)
DESIGN OF DHALLDD LAHORE (22 STOREYS)
FROM JUNE 2007 TO AUGUST 2007 IN ESS-IAAR AS A STRUCTURAL ENGINEER IN DESIGN DEPARTMENT IN THE FOLLOWING PROJECT
DESIGN OF SCHOOL BUILDING IN MUREE FROM STAAD-PRO & ETABS. (2 STOREY)
DESIGN OF UBL BUILDING IN KARACHI FROM ETABS. (14 STOREYS)
FROM MARCH 2006 TO MARCH 2007 IN OSMANI & CO. PVT LTD KARACHI AS AN ENGINEER IN PROJECT MANAGEMENT AND CONTRACT ADMINISTRATION DEPARTMENT IN THE FOLLOWING PROJECT.
CONSTRUCTION OF BUILDING IN MALIR CANTT KARACHI.
CONSTRUCTION OF ROAD IN MALIR CANTT KARACHI.
CONSTRUCTION OF WATER & SEWERAGE LINE IN HYDERABAD.
CONSTRUCTION OF ROAD, WATER & SEWERAGE LINE IN NEW-MALIR KARACHI. COMPUTER SKILLS
OPERATING SYSTEMS.
Microsoft Windows 7
PACKAGES.
Microsoft Office 2000
SOFT WARES.
CSI Etabs
Sap 2000
Staad-pro
CSI Safe
Count-Beam
GRASP
HILTI
Ram Connection
CERTIFICATE:
MS Project in June 2005 from NED University Karachi.
AutoCAD in July 2005 from NED University Karachi. ACADEMIC
QUALIFICATIONS
BACHELOR OF ENGINEERING (Civil.)
NED University of Engineering & Technology Karachi in 2005 in 1st Division.
HIGHER SECONDARY CERTIFICATE (HSC)
Board of Intermediate Education Karachi in 2000.
SECONDARY SCHOOL CERTIFICATE (SSC)
Board of Secondary Education Karachi in 1998.
PERSONAL DETAILS
FATHER’S NAME SYED MUHAMMAD HABIB. (LATE)
DATE OF BIRTH MARCH 15TH, 1984
PLACE OF BIRTH KARACHI
MARITAL STATUS MARRIED
NATIONALITY PAKISTANI.